896 resultados para decision support


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Modern buildings are designed to enhance the match between environment, spaces and the people carrying out work, so that the well-being and the performance of the occupants are all in harmony. Building services are systems that facilitate a healthy working environment within which workers productivity can be optimised in the buildings. However, the maintenance of these services is fraught with problems that may contribute to up to 50% of the total life cycle cost of the building. Maintenance support is one area which is not usually designed into the system as this is not common practice in the services industry. The other areas of shortfall for future designs are; client requirements, commissioning, facilities management data and post occupancy evaluation feedback which needs to be adequately planned to capture and document this information for use in future designs. At the University of Reading an integrated approach has been developed to assemble the multitude of aspects inherent in this field. The means records required and measured achievements for the benefit of both building owners and practitioners. This integrated approach can be represented in a Through Life Business Model (TLBM) format using the concept of Integrated Logistic Support (ILS). The prototype TLBM developed utilises the tailored tools and techniques of ILS for building services. This TLBM approach will facilitate the successful development of a databank that would be invaluable in capturing essential data (e.g. reliability of components) for enhancing future building services designs, life cycle costing and decision making by practitioners, in particular facilities managers.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Nowadays utilising the proper HVAC system is essential both in extreme weather conditions and dense buildings design. Hydraulic loops are the most common parts in all air conditioning systems. This article aims to investigate the performance of different hydraulic loop arrangements in variable flow systems. Technical, economic and environmental assessments have been considered in this process. A dynamic system simulation is generated to evaluate the system performance and an economic evaluation is conducted by whole life cost assessment. Moreover, environmental impacts have been studied by considering the whole life energy consumption, CO2 emission, the embodied energy and embodied CO2 of the system components. Finally, decision-making in choosing the most suitable hydraulic system among five well-known alternatives has been proposed.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Enterprises need continuous product development activities to remain competitive in the marketplace. Their product development process (PDP) must manage stakeholders' needs - technical, financial, legal, and environmental aspects, customer requirements, Corporate strategy, etc. -, being a multidisciplinary and strategic issue. An approach to use real option to support the decision-making process at PDP phases in taken. The real option valuation method is often presented as an alternative to the conventional net present value (NPV) approach. It is based on the same principals of financial options: the right to buy or sell financial values (mostly stocks) at a predetermined price, with no obligation to do so. In PDP, a multi-period approach that takes into account the flexibility of, for instance, being able to postpone prototyping and design decisions, waiting for more information about technologies, customer acceptance, funding, etc. In the present article, the state of the art of real options theory is prospected and a model to use the real options in PDP is proposed, so that financial aspects can be properly considered at each project phase of the product development. Conclusion is that such model can provide more robustness to the decisions processes within PDP.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Digital data sets constitute rich sources of information, which can be extracted and evaluated applying computational tools, for example, those ones for Information Visualization. Web-based applications, such as social network environments, forums and virtual environments for Distance Learning, are good examples for such sources. The great amount of data has direct impact on processing and analysis tasks. This paper presents the computational tool Mapper, defined and implemented to use visual representations - maps, graphics and diagrams - for supporting the decision making process by analyzing data stored in Virtual Learning Environment TelEduc-Unesp. © 2012 IEEE.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

How to evaluate the cost-effectiveness of repair/retrofit intervention vs. demolition/replacement and what level of shaking intensity can the chosen repairing/retrofit technique sustain are open questions affecting either the pre-earthquake prevention, the post-earthquake emergency and the reconstruction phases. The (mis)conception that the cost of retrofit interventions would increase linearly with the achieved seismic performance (%NBS) often discourages stakeholders to consider repair/retrofit options in a post-earthquake damage situation. Similarly, in a pre-earthquake phase, the minimum (by-law) level of %NBS might be targeted, leading in some cases to no-action. Furthermore, the performance measure enforcing owners to take action, the %NBS, is generally evaluated deterministically. Not directly reflecting epistemic and aleatory uncertainties, the assessment can result in misleading confidence on the expected performance. The present study aims at contributing to the delicate decision-making process of repair/retrofit vs. demolition/replacement, by developing a framework to assist stakeholders with the evaluation of the effects in terms of long-term losses and benefits of an increment in their initial investment (targeted retrofit level) and highlighting the uncertainties hidden behind a deterministic approach. For a pre-1970 case study building, different retrofit solutions are considered, targeting different levels of %NBS, and the actual probability of reaching Collapse when considering a suite of ground-motions is evaluated, providing a correlation between %NBS and Risk. Both a simplified and a probabilistic loss modelling are then undertaken to study the relationship between %NBS and expected direct and indirect losses.