911 resultados para Railway buildings
Resumo:
The design of efficient hydrological risk mitigation strategies and their subsequent implementation relies on a careful vulnerability analysis of the elements exposed. Recently, extensive research efforts were undertaken to develop and refine empirical relationships linking the structural vulnerability of buildings to the impact forces of the hazard processes. These empirical vulnerability functions allow estimating the expected direct losses as a result of the hazard scenario based on spatially explicit representation of the process patterns and the elements at risk classified into defined typological categories. However, due to the underlying empiricism of such vulnerability functions, the physics of the damage-generating mechanisms for a well-defined element at risk with its peculiar geometry and structural characteristics remain unveiled, and, as such, the applicability of the empirical approach for planning hazard-proof residential buildings is limited. Therefore, we propose a conceptual assessment scheme to close this gap. This assessment scheme encompasses distinct analytical steps: modelling (a) the process intensity, (b) the impact on the element at risk exposed and (c) the physical response of the building envelope. Furthermore, these results provide the input data for the subsequent damage evaluation and economic damage valuation. This dynamic assessment supports all relevant planning activities with respect to a minimisation of losses, and can be implemented in the operational risk assessment procedure.
Resumo:
Infrastructure development means for the making of living environment, transport and communications, disaster prevention and national land conservation, agriculture, forestry and fisheries, and energy production and supply. Transport infrastructure development in Cambodia involved with (1) road, (2) railway, (3) port, inland-water way and (4) aviation. All model of transport infrastructure have special different kinds of importance. Railway is different from other base important of railways are transport passengers and traffic freight especially transport for heavy goods in huge capacity and in long distance by safer and faster. Transport in Cambodia for traffic freight export import base from Thailand and other via Sisophon and Shihanoukvill port. Traffic is increasing rapidly during nowadays railway condition in adequate of demand required. This is why Railway is selected as the topic of this paper to prevent monopoly of road transport. This paper, does review about infrastructure development plan for Railway in Cambodia as a long term strategy by review and analysis forecast on the previous performance of Royal Railways of Cambodia (RRC) transport traffic involved with condition of infrastructure development of railway in Cambodia. And also review the plan of development RRC but just only detail a plan of rehabilitation that is immediately needed. Suggest some recommendation at the last part. As Cambodia is a member country of ASEAN and also Mekong sub-region. For make sure that transport networks work effectively with a progress of economic integration, we make clear what is important for infrastructure development of railway in Cambodia from the standpoint of the development plan of Mekong sub-region. This paper is organized by 4 sections. Section 1 review about Infrastructure Development of Railway in Cambodia (IDRC) Historical Background, Follow by Section 2 will review the Current Situation of IDRC and some analysis of transport performance from previous years, Then Section 3 review of the focusing on traffic transport of RRC in the future, Section 4 review Infrastructure Development of Railway in Cambodia Future plans in long term; at last conclusion and recommendation. In section 1 does review history background of RRC from the rail first begun. But why is needed to review? Because of history background is involved infrastructure development of RRC in present time. History background made big gaps constraint and obstacle for socioeconomic development and poverty reduction, also left Cambodia with tragedy and left developed behind. After that remain infrastructure development needs huge fund and long time for restoration, reconstruction, rehabilitation and development into new technology as most of world practice.
Resumo:
La envolvente de la edificación es la responsable de equilibrar el intercambio energético entre el interior y el exterior, por lo tanto cualquier actuación encaminada a la reducción del consumo energético ha de establecer, como uno de sus objetivos prioritarios, la mejora del comportamiento de la misma. Las edificaciones anteriores a 1940 constituyen la mayor parte de las existentes en áreas rurales y centros urbanos. En ellas, la repercusión de la fachada sobre las transmitancias globales pone de manifiesto la necesidad de intervención. Sin embargo, su elevada inercia térmica y los importantes saltos térmicos característicos de gran parte de España plantean la importancia de que aquélla se efectúe por el exterior. A tal respecto, la falta de disponibilidad de espesor suficiente para implantar sistemas tipo SATE deriva en que, frecuentemente, la única solución viable sea la de aislar por el interior perdiendo con ello la capacidad de acumulación térmica del muro y con el asociado riesgo de condensaciones. La amplia tradición en el empleo de revestimientos, especialmente en base de cal, permiten que éstos sean utilizados no sólo como elemento estético o de protección de la obra de fábrica antigua sino también para la mejora del comportamiento térmico del soporte, si se aprovecha el mecanismo de transmisión térmica por radiación. Éste es el objetivo de la presente Tesis Doctoral en la que se estudia la modificación de las propiedades radiantes de los morteros de revestimiento para la mejora de la eficiencia energética de las construcciones históricas, principalmente las constituidas por muros monolíticos, aunque podría ser de aplicación a otro tipo de construcciones compuestas por diversas capas. Como punto de partida, se estudió y revisó la documentación disponible sobre las investigaciones de las tres áreas científico-tecnológicas que convergen en la Tesis Doctoral: rehabilitación, material y comportamiento térmico, a partir de lo cual se comprobó la inexistencia de estudios similares al objeto de la presente Tesis Doctoral. Complementariamente, se analizaron los revestimientos en lo concerniente a los materiales que los constituyen, la composición de las mezclas y características de cada una de las capas así como al enfoque que, desde el punto de vista térmico, se estimaba más adecuado para la obtención de los objetivos propuestos. Basándonos en dichos análisis, se preseleccionaron ochenta materiales que fueron ensayados en términos de reflectancia y emisividad para elegir cuatro con los que se continuó la investigación. Éstos, junto con la cal elegida para la investigación y el árido marmóreo característico de la última capa de revestimiento, fueron caracterizados térmicamente, de forma pormenorizada, así como química y físicamente. Los fundamentos teóricos y los estudios preliminares desarrollados con distintos materiales, en estado fresco y endurecido, fueron empleados en la dosificación de componentes de las mezclas, en dos proporciones distintas, para el estudio del efecto del agregado. Éstas se ensayaron en estado fresco, para comprobar su adecuación de puesta en obra y prever su VI adherencia al soporte, así como en estado endurecido a 28 y 90 días de curado, para conocer las propiedades que permitieran prever su compatibilidad con aquél y estimar el alcance de la reducción de transferencias térmicas lograda. Además, se estudiaron las características generales de las mezclas que sirvieron para establecer correlaciones entre distintas propiedades y entender los resultados mecánicos, físicos (comportamiento frente al agua) y energéticos. Del estudio conjunto de las distintas propiedades analizadas se propusieron dos mezclas, una blanca y otra coloreada, cuyas características permiten garantizar la compatibilidad con la obra de fábrica antigua, desde el punto de vista físico y mecánico, y preservar la autenticidad de los revestimientos, en cuanto a la técnica de aplicación tradicional en sistemas multicapa. El comportamiento térmico de las mismas, sobre una obra de fábrica de 40 cm de espesor, se estimó, en estado estacionario y pseudo-transitorio, demostrándose reducciones del flujo térmico entre 16-48%, en condiciones de verano, y entre el 6-11%, en invierno, en función de la coloración y de la rugosidad de la superficie, en comparación con el empleo de la mezcla tradicional. Por lo que, se constata la viabilidad de los materiales compuestos propuestos y su adecuación al objetivo de la investigación. VII ABSTRACT The envelope is responsible for balancing the energy exchange between the inside and outside in buildings. For this reason, any action aimed at reducing energy consumption must establish, as one of its key priorities, its improvement. In rural areas and urban centers, most of the constructions were built before 1940. In them, the impact of the façade on the global transmittance highlights the need for intervention. However, its high thermal inertia and fluctuation of temperatures in the majority of Spain bring up that it should be placed outside the insulation. In this regard, the lack of availability of enough thickness to implement systems such as ETICS results in that often the only viable solution is to isolate the interior, losing thereby the wall’s heat storage capacity with the associated risk of condensation. The tradition in the use of renders, especially lime-based, allows us to use them not only as an aesthetic element or to protect the ancient masonry, but also for improved thermal performance of the support by taking advantage of the heat transfer mechanism by radiation. This is the aim of this Doctoral Thesis in which the modification of the radiative properties of lime mortars for renders to improve the energy efficiency of historic buildings, mainly composed of monolithic walls, is studied, although it could be applied to other structures composed of several layers. As a starting point, the available literature in the three scientific-technological areas that converge at the Doctoral Thesis: rehabilitation, material and thermal behaviour, was reviewed, and confirmed the absence of researches similar to this Doctoral Thesis. Additionally, the renders were studied with regard to the materials that constitute them, the composition of the mixtures and the characteristics of each layer, as well as to the approach which, from a thermal point of view, was deemed the most suitable for achieving the objectives sets. Based on thre aforementioned analysis, eighty materials tested in terms of reflectance and emissivity were pre-selected, to choose four with which the research was continued. Common marble sand, used in the last layer of the renders, together with the appointed materials and hydrated lime were characterized thermally, in detail, as well as chemically and physically. The theoretical bases and preliminary studies with different materials, in fresh and hardened state, were used in the dosage of the composition of the mixtures. In order to study their effect they were used in two different proportions, that is, ten mixtures in total. These were tested in their fresh state to evaluate their setting-up suitability and foresee their adhesion to the support, as well as in their hardened state, at 28 and 90 days of curing, to establish the properties which enabled us to anticipate their compatibility with the old masonry walls and estimate the scope of the reduction of heat transfers achieved. In addition, the general characteristics of the mixtures used to establish correlations and to understand the mechanical, physical and energy results were studied. Two mixtures, one white and one colored, were proposed as the result of the different properties analysed, whose characteristics allow the guarantee of mechanical and physical compatibility VIII with the old masonry and preserve the authenticity of the renders. The thermal behavior of both, applied on a masonry wall 40 cm thick, was estimated at a steady and pseudo-transient state, with heat flow reductions between 16-48% during summertime and 6-11% during wintertime, depending on the color and surface roughness, compared to the use of the traditional mixture. So, the viability of the proposed composite materials and their fitness to the aim of the research are established.
Resumo:
The structural continuity of fully integral bridges entails many advantages and some drawbacks. Among the latter, the cyclic expansions and contractions of the deck caused by seasonal thermal variations impose alternating displacements at the piers and abutments, with effects that may be difficult to establish reliably. The advantages include easier construction and cheaper maintenance but, especially, horizontal loads can be transmitted to the ground in a much better way than in conventional bridges. This paper first presents a methodology for dealing with the problems that the cyclic displacements imposed raise at the abutments and at the bridge piers. At the former, large pressures may develop, possibly accompanied by undesirable surface settlements. At the latter, the degree of cracking and the ability to carry the specified loads may be in question. Having quantified the drawbacks, simplified but realistic analyses are conducted of the response of an integral bridge to braking and seismic loads. It is shown that integral bridges constitute an excellent alternative in the context of the requirements posed by new high-speed railway lines.
Resumo:
The railway overhead (or catenary) is the system of cables responsible for providing electric current to the train. This system has been reported as wind-sensitive (Scanlon et al., 2000), and particularly to the occurrence of galloping phenomena. Galloping phenomena of the railway overhead consists of undamped cable oscillations triggered by aerodynamic forces acting on the contact wire. As is well known, aerodynamic loads on the contact wire depends on the incident flow mean velocity and the angle of attack. The presence of embankments or hills modifies both vertical velocities profiles and angles of attack of the flow (Paiva et al., 2009). The presence of these cross-wind related oscillations can interfere with the safe operation of the railway service (Johnson, 1996). Therefore a correct modelling of the phenomena is required to avoid these unwanted oscillations.
Resumo:
The threat of impact or explosive loads is regrettably a scenario to be taken into account in the design of lifeline or critical civilian buildings. These are often made of concrete and not specifically designed for military threats. Numerical simulation of such cases may be undertaken with the aid of state of the art explicit dynamic codes, however several difficult challenges are inherent to such models: the material modeling for the concrete anisotropic failure, consideration of reinforcement bars and important structural details, adequate modeling of pressure waves from explosions in complex geometries, and efficient solution to models of complete buildings which can realistically assess failure modes. In this work we employ LS-Dyna for calculation, with Lagrangian finite elements and explicit time integration. Reinforced concrete may be represented in a fairly accurate fashion with recent models such as CSCM model [1] and segregated rebars constrained within the continuum mesh. However, such models cannot be realistically employed for complete models of large buildings, due to limitations of time and computer resources. The use of structural beam and shell elements for this purpose would be the obvious solution, with much lower computational cost. However, this modeling requires careful calibration in order to reproduce adequately the highly nonlinear response of structural concrete members, including bending with and without compression, cracking or plastic crushing, plastic deformation of reinforcement, erosion of vanished elements etc. The main objective of this work is to provide a strategy for modeling such scenarios based on structural elements, using available material models for structural elements [2] and techniques to include the reinforcement in a realistic way. These models are calibrated against fully three-dimensional models and shown to be accurate enough. At the same time they provide the basis for realistic simulation of impact and explosion on full-scale buildings
Resumo:
The improvement of energy efficiency in existing buildings is always a challenge due to their particular, and sometimes protected, constructive solutions. New constructive regulations in Spain leave a big undefined gap when a restoration is considered because they were developed for new buildings. However, rehabilitation is considered as an opportunity for many properties because it allows owners to obtain benefits from the use of the buildings. The current financial and housing crisis has turned society point of view to existing buildings and making them more efficient is one of the Spanish government’s aims. The economic viability of a rehabilitation action should take all factors into account: both construction costs and the future operative costs of the building must be considered. Nevertheless, the application of these regulations in Spain is left to the designer’s opinion and always under a subjective point of view. With the research work described in this paper and with the help of some case-studies, the cost of adapting an existing building to the new constructive regulations will be studied and Energetic Efficiency will be evaluated depending on how the investment is recovered. The interest of the research is based on showing how new constructive solutions can achieve higher levels of efficiency in terms of energy, construction and economy and it will demonstrate that Life Cycle Costing analysis can be a mechanism to find the advantages and disadvantages of using these new constructive solutions. Therefore, this paper has the following objectives: analysing constructive solutions in existing buildings - to establish a process for assessing total life cycle costs (LCC) during the planning stages with consideration of future operating costs - to select the most advantageous operating system – To determine the return on investment in terms of construction costs based on new techniques, the achieved energy savings and investment payback periods.
Resumo:
The purpose of this study is to determine the critical wear levels of the contact wire of the catenary on metropolitan lines. The study has focussed on the zones of contact wire where localised wear is produced, normally associated with the appearance of electric arcs. To this end, a finite element model has been developed to study the dynamics of pantograph-catenary interaction. The model includes a zone of localised wear and a singularity in the contact wire in order to simulate the worst case scenario from the point of view of stresses. In order to consider the different stages in the wire wear process, different depths and widths of the localised wear zone were defined. The results of the dynamic simulations performed for each stage of wear let the area of the minimum resistant section of the contact wire be determined for which stresses are greater than the allowable stress. The maximum tensile stress reached in the contact wire shows a clear sensitivity to the size of the local wear zone, defined by its width and depth. In this way, if the wear measurements taken with an overhead line recording vehicle are analysed, it will be possible to calculate the potential breakage risk of the wire. A strong dependence of the tensile forces of the contact wire has also been observed. These results will allow priorities to be set for replacing the most critical sections of wire, thereby making maintenance much more efficient. The results obtained show that the wire replacement criteria currently borne in mind have turned out to be appropriate, although in some wear scenarios these criteria could be adjusted even more, and so prolong the life cycle of the contact wire.
Resumo:
Flat or worn wheels rolling on rough or corrugated tracks can provoke airborne noise and ground-borne vibration, which can be a serious concern for nearby neighbours of urban rail transit lines. Among the various treatments used to reduce vibration and noise, resilient wheels play an important role. In conventional resilient wheels, a slightly prestressed Vshaped rubber ring is mounted between the steel wheel centre and tyre. The elastic layer enhances rolling noise and vibration suppression, as well as impact reduction on the track. In this paper the effectiveness of resilient wheels in underground lines, in comparison to monobloc ones, is assessed. The analysed resilient wheel is able to carry greater loads than standard resilient wheels used for light vehicles. It also presents a greater radial resiliency and a higher axial stiffness than conventional Vwheels. The finite element method was used in this study. A quarter car model was defined, in which the wheelset was modelled as an elastic body. Several simulations were performed in order to assess the vibrational behaviour of elastic wheels, including modal, harmonic and random vibration analysis, the latter allowing the introduction of realistic vertical track irregularities, as well as the influence of the running speed. Due to numerical problems some simplifications were needed. Parametric variations were also performed, in which the sensitivity of the whole system to variations of rubber prestress and Poisson’s ratio of the elastic material was assessed.Results are presented in the frequency domain, showing a better performance of the resilient wheels for frequencies over 200 Hz. This result reveals the ability of the analyzed design to mitigate rolling noise, but not structural vibrations, which are primarily found in the lower frequency range.
Resumo:
Tiled projector displays are a common choice for training simulators, where a high resolution output image is required. They are cheap for the resolution that they can reach and can be configured in many different ways. Nevertheless, such kinds of displays require geometric and color correction so that the composite image looks seamless. Display correction is an even bigger challenge when the projected images include dark scenes combined with brighter scenes. This is usually a problem for railway simulators when the train is positioned inside a tunnel and the black offset effect becomes noticeable. In this paper, a method for fast photometric and geometric correction of tiled display systems where dark and bright scenes are combined is presented. The image correction is carried out in two steps. First, geometric alignment and overlapping areas attenuation for brighter scenes is applied. Second, in the event of being inside a tunnel, the brightness of the scene is increased in certain areas using light sources in order to create the impression of darkness but minimizing the effect of the black offset
Resumo:
The traditional ballast track structures are still being used in high speed railways lines with success, however technical problems or performance features have led to non-ballast track solution in some cases. A considerable maintenance work is needed for ballasted tracks due to the track deterioration. Therefore it is very important to understand the mechanism of track deterioration and to predict the track settlement or track irregularity growth rate in order to reduce track maintenance costs and enable new track structures to be designed. The objective of this work is to develop the most adequate and efficient models for calculation of dynamic traffic load effects on railways track infrastructure, and then evaluate the dynamic effect on the ballast track settlement, using a ballast track settlement prediction model, which consists of the vehicle/track dynamic model previously selected and a track settlement law. The calculations are based on dynamic finite element models with direct time integration, contact between wheel and rail and interaction with railway cars. A initial irregularity profile is used in the prediction model. The track settlement law is considered to be a function of number of loading cycles and the magnitude of the loading, which represents the long-term behavior of ballast settlement. The results obtained include the track irregularity growth and the contact force in the final interaction of numerical simulation
Resumo:
This paper reports the studies carried out to develop and calibrate the optimal models for the objectives of this work. In particular, quarter bogie model for vehicle, rail-wheel contact with Lagrangian multiplier method, 2D spatial discretization were selected as the optimal decisions. Furthermore, the 3D model of coupled vehicle-track also has been developed to contrast the results obtained in the 2D model. The calculations were carried out in the time domain and envelopes of relevant results were obtained for several track profiles and speed ranges. Distributed elevation irregularities were generated based on power spectral density (PSD) distributions. The results obtained include the wheel-rail contact forces, forces transmitted to the bogie by primary suspension. The latter loads are relevant for the purpose of evaluating the performance of the infrastructure
Resumo:
Railway bridges have specific requirements related to safety, which often are critical aspects of design. In this paper the main phenomena are reviewed, namely vertical dynamic effects for impact effect of moving loads and resonance in high-speed, service limit states which affect the safety of running traffic, and lateral dynamic effects.
Resumo:
In Brazil, a low-latitude country characterized by its high availability and uniformity of solar radiation, the use of PV solar energy integrated in buildings is still incipient. However, at the moment there are several initiatives which give some hints that lead to think that there will be a change shortly. In countries where this technology is already a daily reality, such as Germany, Japan or Spain, the recommendations and basic criteria to avoid losses due to orientation and tilt are widespread. Extrapolating those measures used in high latitudes to all regions, without a previous deeper analysis, is standard practice. They do not always correspond to reality, what frequently leads to false assumptions and may become an obstacle in a country which is taking the first step in this area. In this paper, the solar potential yield for different surfaces in Brazilian cities (located at latitudes between 0° and 30°S) are analyzed with the aim of providing the necessary tools to evaluate the suitability of the buildings’ envelopes for photovoltaic use
Resumo:
In the year 1999 approves the Law of Construction Building (LOE, in Spanish) to regulate a sector such as construction, which contained some shortcomings from the legal point of view. Currently, the LOE has been in force 12 years, changing the spanish world of the construction, due to influenced by internationalization. Within the LOE, there regulating the different actors involved in the construction building, as the Projects design, the Director of Construction, the developer, The builder, Director of execution of the construction (actor only in Spain, similar as construcion engineer and abroad in), control entities and the users, but lacks figure Project manager will assume the delegation of the promoter helping and you organize, direct and management the process. This figure assumes that the market and contracts are not legally regulated in Spain, then should define and establish its regulation in the LOE. (Spain Construction Law) The translation in spanish of the words "Project Manager is owed to Professor Rafael de Heredia in his book Integrated Project Management, as agent acting on behalf of the organization and promoter assuming control of the project, ie Integraded Project Management . Already exist in Spain, AEDIP (Spanish Association Integrated of Project Construction management) which comprises the major companies in “Project Management” in Spain, and MeDIP (Master in Integrated Construction Project) the largest and most advanced studies at the Polytechnic University of Madrid, in "Construction Project Management" they teach which is also in Argentina. The Integrated Project ("Project Management") applied to the construction process is a methodological technique that helps to organize, control and manage the resources of the promoters in the building process. When resources are limited (which is usually most situations) to manage them efficiently becomes very important. Well, we find that in this situation, the resources are not only limited, but it is limited, so a comprehensive control and monitoring of them becomes not only important if not crucial. The alternative of starting from scratch with a team that specializes in developing these follow directly intervening to ensure that scarce resources are used in the best possible way requires the use of a specific methodology (Manual DIP, Matrix Foreign EDR breakdown structure EDP Project, Risk Management and Control, Design Management, et ..), that is the methodology used by "Projects managers" to ensure that the initial objectives of the promoters or investors are met and all actors in process, from design to construction company have the mind aim of the project will do, trying to get their interests do not prevail over the interests of the project. Among the agents listed in the building process, "Project Management" or DIPE (Director Comprehensive building process, a proposed name for possible incorporation into the LOE, ) currently not listed as such in the LOE (Act on Construction Planning ), one of the agents that exist within the building process is not regulated from the legal point of view, no obligations, ie, as is required by law to have a project, a builder, a construction management, etc. DIPE only one who wants to hire you as have been advanced knowledge of their services by the clients they have been hiring these agents, there being no legal obligation as mentioned above, then the market is dictating its ruling on this new figure, as if it were necessary, he was not hired and eventually disappeared from the building process. As the aim of this article is regular the process and implement the name of DIPE in the Spanish Law of buildings construction (LOE)