987 resultados para Pulse Transit Time
Resumo:
ABSTRACT Based on the assumption that earnings persistence has implications for both financial analysis and compensation contracts, the aim of this paper is to investigate the role of earnings persistence assuming that (i) more persistent earnings are likely to be a better input to valuation models and (ii) more persistent earnings are likely to serve as a proxy for long-term market and managerial orientation. The analysis is based on Brazilian listed firms from 1995 to 2013, and while we document strong support for the relevance of earnings persistence in financial analysis and valuation, we fail to document a significant relationship between earnings persistence and long-term value orientation. These results are sensitive to different specifications, and additional results suggest that firms' idiosyncratic risk (total risk) is relevant to explain the focus on short-term outcomes (short-termism) across firms. The main contribution of this paper is to offer empirical evidence for the relevance of accounting numbers in both valuation and contractual theories in an emergent market.
Resumo:
Dealing with ancient manuscript or old printed texts often constitutes a difficult task, especially to philologists and editors, for two main reasons: the precarious state of preservation of the documents and the uncertainty regarding their origin, authenticity and authorship. These problems are aggravated by spurious versions, due to the publication of truncated works, poorly supervised miscellanies and non-authorised editions. Sir Robert Sidney’s literary text constitutes an exception amidst such vicissitudes, once the original corpus is wholly contained in a notebook exhibiting the organisation and unity conceived by the author himself. Today, there is no evidence that any loose poems, either autograph or copied by amanuenses, were in circulation among members of the Elizabethan court society. The notebook was kept in private collections for four centuries, which probably explains why it was so well preserved. In fact, only in 1984 would P.J. Croft’s fine edition bring the youngest Sidney’s Poems into light. In this work, I approach Croft’s perceptive, accurate philological study that eventually rescued from oblivion a remarkable piece both of the Elizabethan lyric poetry and of the English Renaissance, and, at the same time, look into Robert Sidney’s peculiar, careful and original formatting of his own autograph manuscript.
Resumo:
The intensive use of semiconductor devices enabled the development of a repetitive high-voltage pulse-generator topology from the dc voltage-multiplier (VM) concept. The proposed circuit is based on an odd VM-type circuit, where a number of dc capacitors share a common connection with different voltage ratings in each one, and the output voltage comes from a single capacitor. Standard VM rectifier and coupling diodes are used for charging the energy-storing capacitors, from an ac power supply, and two additional on/off semiconductors in each stage, to switch from the typical charging VM mode to a pulse mode with the dc energy-storing capacitors connected in series with the load. Results from a 2-kV experimental prototype with three stages, delivering a 10-mu s pulse with a 5-kHz repetition rate into a resistive load, are discussed. Additionally, the proposed circuit is compared against the solid-state Marx generator topology for the same peak input and output voltages.
Resumo:
A newly developed solid-state repetitive high-voltage (HV) pulse modulator topology created from the mature concept of the d.c. voltage multiplier (VM) is described. The proposed circuit is based in a voltage multiplier type circuit, where a number of d.c. capacitors share a common connection with different voltage rating in each one. Hence, besides the standard VM rectifier and coupling diodes, two solid-state on/off switches are used, in each stage, to switch from the typical charging VM mode to a pulse mode with the d.c. capacitors connected in series with the load. Due to the on/off semiconductor configuration, in half-bridge structures, the maximum voltage blocked by each one is the d.c. capacitor voltage in each stage. A 2 kV prototype is described and the results are compared with PSPICE simulations.
Resumo:
Tese de Doutoramento em Biologia apresentada à Faculdade de Ciências da Universidade do Porto, 2015.
Resumo:
Recent literature has proved that many classical pricing models (Black and Scholes, Heston, etc.) and risk measures (V aR, CV aR, etc.) may lead to “pathological meaningless situations”, since traders can build sequences of portfolios whose risk leveltends to −infinity and whose expected return tends to +infinity, i.e., (risk = −infinity, return = +infinity). Such a sequence of strategies may be called “good deal”. This paper focuses on the risk measures V aR and CV aR and analyzes this caveat in a discrete time complete pricing model. Under quite general conditions the explicit expression of a good deal is given, and its sensitivity with respect to some possible measurement errors is provided too. We point out that a critical property is the absence of short sales. In such a case we first construct a “shadow riskless asset” (SRA) without short sales and then the good deal is given by borrowing more and more money so as to invest in the SRA. It is also shown that the SRA is interested by itself, even if there are short selling restrictions.
Resumo:
Instituto Politécnico do Porto. Instituto Superior de Contabilidade e Administração do Porto
Resumo:
Dissertação para obtenção do Grau de Mestre em Contabilidade e Finanças Orientador: Mestre Paulino Manuel Leite da Silva
Resumo:
The introduction of wind power generation in several countries around the world, including in European countries, where energy policy directives have encouraged the use of renewables, led to several changes in market and power systems operation. The intensive integration of these sources has led to situations in which the demand is lower than the available renewable resources. In these situations a part of the available generation is wasted if not used for storage or to supply additional demand. This paper proposes a real time demand response methodology based on changing the electricity price for the consumers expecting an increase in the demand in the periods in which that demand is lower than the available renewable generation. The consumers response to the changes in electricity price is characterized by their price elasticity of demand considered distinct for each consumer type. The proposed methodology is applied to the Portuguese power system, in the context of the Iberian electricity market (MIBEL). The renewable-based producers are considered as special producers, with special tariffs, and so it is important to use the energy available as it will be paid anyway. In this context, consumers are entities actively participating in the operation of the market.
Resumo:
The use of distributed energy resources, based on natural intermittent power sources, like wind generation, in power systems imposes the development of new adequate operation management and control methodologies. A short-term Energy Resource Management (ERM) methodology performed in two phases is proposed in this paper. The first one addresses the day-ahead ERM scheduling and the second one deals with the five-minute ahead ERM scheduling. The ERM scheduling is a complex optimization problem due to the high quantity of variables and constraints. In this paper the main goal is to minimize the operation costs from the point of view of a virtual power player that manages the network and the existing resources. The optimization problem is solved by a deterministic mixedinteger non-linear programming approach. A case study considering a distribution network with 33 bus, 66 distributed generation, 32 loads with demand response contracts and 7 storage units and 1000 electric vehicles has been implemented in a simulator developed in the field of the presented work, in order to validate the proposed short-term ERM methodology considering the dynamic power system behavior.
Resumo:
This paper proposes an energy resources management methodology based on three distinct time horizons: day-ahead scheduling, hour-ahead scheduling, and real-time scheduling. In each scheduling process it is necessary the update of generation and consumption operation and of the storage and electric vehicles storage status. Besides the new operation condition, it is important more accurate forecast values of wind generation and of consumption using results of in short-term and very short-term methods. A case study considering a distribution network with intensive use of distributed generation and electric vehicles is presented.
Resumo:
The increasing importance given by environmental policies to the dissemination and use of wind power has led to its fast and large integration in power systems. In most cases, this integration has been done in an intensive way, causing several impacts and challenges in current and future power systems operation and planning. One of these challenges is dealing with the system conditions in which the available wind power is higher than the system demand. This is one of the possible applications of demand response, which is a very promising resource in the context of competitive environments that integrates even more amounts of distributed energy resources, as well as new players. The methodology proposed aims the maximization of the social welfare in a smart grid operated by a virtual power player that manages the available energy resources. When facing excessive wind power generation availability, real time pricing is applied in order to induce the increase of consumption so that wind curtailment is minimized. The proposed method is especially useful when actual and day-ahead wind forecast differ significantly. The proposed method has been computationally implemented in GAMS optimization tool and its application is illustrated in this paper using a real 937-bus distribution network with 20310 consumers and 548 distributed generators, some of them with must take contracts.
Resumo:
Sub-nanosecond bipolar high voltage pulses are a very important tool for food processing, medical treatment, waste water and exhaust gas processing. A Hybrid Modulator for sub-microsecond bipolar pulse generation, comprising an unipolar solid-state Marx generator connected to a load through a stack Blumlein system that produces bipolar pulses and further multiplies the pulse voltage amplitude, is presented. Experimental results from an assembled prototype show the generation of 1000 V amplitude bipolar pulses with 100 ns of pulse width and 1 kHz repetition rate.
Resumo:
Recent changes in power systems mainly due to the substantial increase of distributed generation and to the operation in competitive environments has created new challenges to operation and planning. In this context, Virtual Power Players (VPP) can aggregate a diversity of players, namely generators and consumers, and a diversity of energy resources, including electricity generation based on several technologies, storage and demand response. Demand response market implementation has been done in recent years. Several implementation models have been considered. An important characteristic of a demand response program is the trigger criterion. A program for which the event trigger depends on the Locational Marginal Price (LMP) used by the New England Independent System operator (ISO-NE) inspired the present paper. This paper proposes a methodology to support VPP demand response programs management. The proposed method has been computationally implemented and its application is illustrated using a 32 bus network with intensive use of distributed generation. Results concerning the evaluation of the impact of using demand response events are also presented.
Resumo:
In competitive electricity markets with deep concerns for the efficiency level, demand response programs gain considerable significance. As demand response levels have decreased after the introduction of competition in the power industry, new approaches are required to take full advantage of demand response opportunities. This paper presents DemSi, a demand response simulator that allows studying demand response actions and schemes in distribution networks. It undertakes the technical validation of the solution using realistic network simulation based on PSCAD. The use of DemSi by a retailer in a situation of energy shortage, is presented. Load reduction is obtained using a consumer based price elasticity approach supported by real time pricing. Non-linear programming is used to maximize the retailer’s profit, determining the optimal solution for each envisaged load reduction. The solution determines the price variations considering two different approaches, price variations determined for each individual consumer or for each consumer type, allowing to prove that the approach used does not significantly influence the retailer’s profit. The paper presents a case study in a 33 bus distribution network with 5 distinct consumer types. The obtained results and conclusions show the adequacy of the used methodology and its importance for supporting retailers’ decision making.