865 resultados para Many-body problem.
Resumo:
Searching academic databases for records on ‘business failure’, ‘business distress’ or ‘bankruptcy’ yields a large body of studies on qualitative, empirical, theoretical and simulation aspects. It is a central part of this research to distil from this large quantity of potentially relevant reports and methodologies those which can both flag and predict business failure in the construction industry. An additional search term, such as, ‘construction’, ‘construction industry’ or ‘contractor’ yields a much smaller number of hits, many of which emphasize the construction industry’s distinctive characteristics. We scientists need first to understand the subject of investigation and the environment in which it lives. To do so, an analysis of existing successful and failed approaches to particular research questions is helpful before embarking on new territory. This guides the structure of the following report for we first review papers that specifically report on aspects of business failure in the construction industry followed by, (a) an overview of promising candidates borrowed from other disciplines and industries, and (b) a possible novel approach. An Australian (Queensland) perspective on the topic will also drive this investigation as most of the published research has been applied to the US and UK construction industries.
Resumo:
Construction is an information intensive industry in which the accuracy and timeliness of information is paramount. It observed that the main communication issue in construction is to provide a method to exchange data between the site operation, the site office and the head office. The information needs under consideration are time critical to assist in maintaining or improving the efficiency at the jobsite. Without appropriate computing support this may increase the difficulty of problem solving. Many researchers focus their research on the usage of mobile computing devices in the construction industry and they believe that mobile computers have the potential to solve some construction problems that leads to reduce overall productivity. However, to date very limited observation has been conducted in terms of the deployment of mobile computers for construction workers on-site. By providing field workers with accurate, reliable and timely information at the location where it is needed, it will support the effectiveness and efficiency at the job site. Bringing a new technology into construction industry is not only need a better understanding of the application, but also need a proper preparation of the allocation of the resources such as people, and investment. With this in mind, an accurate analysis is needed to provide clearly idea of the overall costs and benefits of the new technology. A cost benefit analysis is a method of evaluating the relative merits of a proposed investment project in order to achieve efficient allocation of resources. It is a way of identifying, portraying and assessing the factors which need to be considered in making rational economic choices. In principle, a cost benefit analysis is a rigorous, quantitative and data-intensive procedure, which requires identification all potential effects, categorisation of these effects as costs and benefits, quantitative estimation of the extent of each cost and benefit associated with an action, translation of these into a common metric such as dollars, discounting of future costs and benefits into the terms of a given year, and summary of all cost and benefit to see which is greater. Even though many cost benefit analysis methodologies are available for a general assessment, there is no specific methodology can be applied for analysing the cost and benefit of the application of mobile computing devices in the construction site. Hence, the proposed methodology in this document is predominantly adapted from Baker et al. (2000), Department of Finance (1995), and Office of Investment Management (2005). The methodology is divided into four main stages and then detailed into ten steps. The methodology is provided for the CRC CI 2002-057-C Project: Enabling Team Collaboration with Pervasive and Mobile Computing and can be seen in detail in Section 3.
Resumo:
Although upper body musculoskeletal disorders (MSDs) represent an increasingly important issue for university students, few if any studies have targeted the occupational therapy faculty. Given this dearth of information, it was considered necessary to investigate a cross-section of Australian occupational therapy students by means of an established questionnaire survey. Completed replies were obtained from 95.7%, 100% and 97.7% (n = 44, 55 and 48) of students in the first, second and fourth years of a large occupational therapy school in northern Queensland, Australia.---------- The 12-month period prevalence of MSDs was as follows: neck (67.4%), shoulder (46.3%) and upper back (39.5%). Three-quarters of all students (75.5%) reported an MSD occurring in at least one of these body regions. Over half (56.5%) reported an MSD over 2 days' duration in the past year. Almost 40% (39.5%) reported an MSD that had affected their daily life, while one-quarter (25.2%) needed some type of treatment.---------- Logistic regression indicated that students aged over 21 years were almost four times more likely to report shoulder-related MSD (OR 3.7, 95%CI: 1.4-10.2). Year of study in the occupational therapy course was another important MSD correlate, with adjusted odds ratios ranging from 3.3 at the upper back (OR 3.3, 95%CI: 1.2-9.6) to 10.9 at the neck (OR 10.9, 95%CI: 3.2-43.8). Computer usage also incurred a certain degree of risk, with students who spent over 5 hours per week on the computer having an increased risk of MSD at the neck (OR 5.0, 95%CI: 1.3-21.5) and shoulder (OR 4.7, 95%CI: 1.4-18.3).---------- Overall, this study suggests that Australian occupational therapy students have a large burden from MSDs in the upper body region, even more so than other student groups and some working populations. Since the distribution of MSD risk is not uniform among them, interventions to help reduce these conditions need to be carefully targeted. Further longitudinal investigations would also be useful in determining the mechanisms and contributory factors for MSDs among this unique student population.
Resumo:
Non-motorized public transport (NMPT), especially three-wheeler cycle rickshaws, has a long history in East Asia; and has long been a major transport planning issue. Policy measures to restrict or eliminate NMPT have already been implemented in many developing cities with mixed success. However given the economic, social and cultural significance of NMPT, its environmental benefits, and the magnitude of its role in sustaining the mobility needs of citizens, it is timely to reconsider the future role of NMPT. Rather than pursuing policies to eliminate NMPT, a better approach may be to integrate motorized and non-motorized vehicles as complementary rather than competitive forces. With this backdrop and given the international significance of the problem, this paper examines the current role and significance of NMPT using Dhaka as a case study, and sets a research agenda for the future of NMPT in a sustainable transport system.
Resumo:
Real-World Data Mining Applications generally do not end up with the creation of the models. The use of the model is the final purpose especially in prediction tasks. The problem arises when the model is built based on much more information than that the user can provide in using the model. As a result, the performance of model reduces drastically due to many missing attributes values. This paper develops a new learning system framework, called as User Query Based Learning System (UQBLS), for building data mining models best suitable for users use. We demonstrate its deployment in a real-world application of the lifetime prediction of metallic components in buildings
Resumo:
Research into cyberbullying in Australia has been slow. This is partly because rigorous research takes time, both to conduct, to analyse and to publish. In addition, Australian governments and other decision makers did not realise that cyberbullying was happening until there was greater media attention to the problem in the last few years. This meant that there was no serious research money allocated to cyberbullying research in Australia until about two years ago. In addition, initial research has mainly looked at how many students have been cyberbullied and what were the consequences. As far as I know there is only one large research project which is looking at what programs actually work to prevent and/or intervene in cyberbullying in Australia and that will take time to ascertain. However, our society wants quick fixes and they want a quick fix for cyberbullying.
Resumo:
Climate change and human activity are subjecting the environment to unprecedented rates of change. Monitoring these changes is an immense task that demands new levels of automated monitoring and analysis. We propose the use of acoustics as a proxy for the time consuming auditing of fauna, especially for determining the presence/absence of species. Acoustic monitoring is deceptively simple; seemingly all that is required is a sound recorder. However there are many major challenges if acoustics are to be used for large scale monitoring of ecosystems. Key issues are scalability and automation. This paper discusses our approach to this important research problem. Our work is being undertaken in collaboration with ecologists interested both in identifying particular species and in general ecosystem health.
Resumo:
Top screw pullout occurs when the screw is under too much axial force to remain secure in the vertebral body. In vitro biomechanical pullout tests are commonly done to find the maximum fixation strength of anterior vertebral body screws. Typically, pullout tests are done instantaneously where the screw is inserted and then pulled out immediately after insertion. However, bone is a viscoelastic material so it shows a time dependent stress and strain response. Because of this property, it was hypothesised that creep occurs in the vertebral trabecular bone due to the stress caused by the screw. The objective of this study was therefore to determine whether the axial pullout strength of anterior vertebral body screws used for scoliosis correction surgery changes with time after insertion. This study found that there is a possible relationship between pullout strength and time; however more testing is required as the sample numbers were quite small. The design of the screw is made with the knowledge of the strength it must obtain. This is important to prevent such occurrences as top screw pullout. If the pullout strength is indeed decreased due to creep, the design of the screw may need to be changed to withstand greater forces.
Resumo:
Construction organisations comprise geographically dispersed virtually-linked suborganisations that work together to realise projects. They increasingly do so using information and communication technology (ICT) to communicate, coordinate their activities and to solve complex problems. One salient problem they face is how to effectively use requisite ICT tools. One important tool at their disposal is the self-help group, a body of people that organically spring up to solve shared problems. The more recognised term for this organisational form is a community of practice (COP). COPs generate knowledge networks that enhance and sustain competitive advantage and they are also used to help COP members actually use ICT tools. Etienne Wenger defines communities of practice as “groups of people informally bound together by shared expertise and passion for a joint enterprise” (Wenger and Snyder 2000, p139). This ‘chicken-or-egg’ issue about needing a COP to use the tools that are needed to effective broaden COPs (beyond co-located these groups) led us to explore how best to improve the process of ICT diffusion through construction organisations— primarily using people supported by technology that improves knowledge sharing. We present insights gained from recent PhD research results in this area. A semistructured interview approach was used to collect data from ICT strategists and users in the three large Australian construction organisations that are among the 10 or so first tier companies by annual dollar turnover in Australia. The interviewees were categorised into five organisational levels: IT strategist, implementer, project or engineering manager, site engineer and foreman. The focus of the study was on the organisation and the way that it implements ICT diffusion of a groupware ICT diffusion initiative. Several types of COP networks from the three Australian cases are identified: withinorganisation COP; institutional, implementer or technical support; project manager/engineer focussed; and collegial support. Also, there are cross-organisational COPs that organically emerge as a result of people sharing an interest or experience in something significant. Firstly, an institutional network is defined as a strategic group, interested in development of technology innovation within an organisation. This COP principally links business process domain experts with an ICT strategist.
Resumo:
We investigate Multiple-Input and Multiple-Output Orthogonal Frequency Division Multiplexing (MIMO-OFDM) systems behavior in indoor populated environments that have line-of-site (LoS) between transmitter and receiver arrays. The in-house built MIMO-OFDM packet transmission demonstrator, equipped with four transmitters and four receivers, has been utilized to perform channel measurements at 5.2 GHz. Measurements have been performed using 0 to 3 pedestrians with different antenna arrays (2 £ 2, 3 £ 3 and 4 £ 4). The maximum average capacity for the 2x2 deterministic Fixed SNR scenario is 8.5 dB compared to the 4x4 deterministic scenario that has a maximum average capacity of 16.2 dB, thus an increment of 8 dB in average capacity has been measured when the array size increases from 2x2 to 4x4. In addition a regular variation has been observed for Random scenarios compared to the deterministic scenarios. An incremental trend in average channel capacity for both deterministic and random pedestrian movements has been observed with increasing number of pedestrian and antennas. In deterministic scenarios, the variations in average channel capacity are more noticeable than for the random scenarios due to a more prolonged and controlled body-shadowing effect. Moreover due to the frequent Los blocking and fixed transmission power a slight decrement have been observed in the spread between the maximum and minimum capacity with random fixed Tx power scenario.