1000 resultados para Line
Resumo:
A photograph of men working to weld the railway line at Baie Comeau. The caption reads, "Welding railway line as rails joined immediately behind the temporary staff house".
Resumo:
A photograph with the caption "Railway line, on trestle, immediately behind millsite".
Resumo:
A listing of the pilots competing in the All Women's International Air Race, 1953.
Resumo:
Clipping from a Town Council meeting at which estimates of the costs of Railway Line no. 1 and Line no. 2 were submitted by the office of Port Dalhousie and Thorold Railway. The estimate was submitted by S.D. Woodruff and George Rykert, president. There is also a disclaimer in which Calvin Phelps claims to have resigned as director of the Port Dalhousie and Thorold Railway when he discovered that the company had no intention to adhere to the original plan for building and running the road, Aug. 1854.
Resumo:
Memorandum of material furnished for superstructure on the line of the Port Dalhousie Thorold Railway by contract. This document includes: Bills of timber, memorandums of planking, fencing, ties, track laying, masonry and bolts and spikes. There are also diagrams of culverts. One of the pages is loose and the outer pages are somewhat discoloured (32 pages, handwritten and bound with ribbon, n.d.
Resumo:
Letter of estimate sent to S.D. Woodruff for the total cost of construction and equipment of the extension of the line to Port Colborne [this is unsigned]. There is an envelope with this letter that suggests that it is from Mr. Shanly, Mar. 12, 1857.
Resumo:
Chart of estimate of cost of Port Dalhousie and Thorold Railway extension Line no. 1 signed by Mr. Shanly, Mar. 12, 1857.
Resumo:
Chart of the estimated cost of Line no. 1, n.d.
Resumo:
Report sent to the President and Director of the Port Dalhousie and Thorold Railway stating that the location of the line extension of the railway is completed. The distance from Thorold Station to Port Colborne is 20 miles. The estimate provides for construction of a permanent structure across the Chippewa and Welland River. Estimates for building a first class road, culverts and bridges will be of permanent and durable masonry. This includes estimates for various station buildings such as a warehouse in Port Colborne and a warehouse in Port Dalhousie. Surveys and plans are ready and will be registered this week. This is signed by S.D. Woodruff (2 copies) [one appears to be a rough copy] (The rough copy is 5 pages, handwritten and the other copy is 6 pages, handwritten), Apr. 8, 1857.
Resumo:
Memorandum of ditching on the line of the Port Dalhousie and Thorold Railway between Port Dalhousie and St. Catharines (1 page, handwritten), n.d.
Resumo:
The New Continental Line Atchison, Topeka and Santa Fe Railroad West and Southwest schedule. The schedule is slightly torn. This does not affect the text, Sept. 4, 1881.
Resumo:
“Frisco Line” St. Louis and San Francisco Railway the direct line through St. Louis schedule, Jan. 9, 1882.
Resumo:
Iron Mountain Route Railway schedule: the great through line St. Louis, Arkansas and Texas to the Hot Springs of Arkansas.
Resumo:
The new California Line via Atchison, Topeka and Santa Fe Railroad and Southern Pacific Railroad. This schedule is torn. This does not affect text, n.d.
Resumo:
Unsigned letter to Charles Stuart, clerk of the municipality of the township of Thorold regarding the proposed line of macadamized road from Hurst’s Bridge to Port Robinson (1 ¼ pages, handwritten), May 9, 1855.