914 resultados para Limited power supply
Resumo:
Summary. On 11 March 2011, a devastating earthquake struck Japan and caused a major nuclear accident at the Fukushima Daiichi nuclear plant. The disaster confirmed that nuclear reactors must be protected even against accidents that have been assessed as highly unlikely. It also revealed a well-known catalogue of problems: faulty design, insufficient back-up systems, human error, inadequate contingency plans, and poor communications. The catastrophe triggered the rapid launch of a major re-examination of nuclear reactor security in Europe. It also stopped in its tracks what had appeared to be a ‘nuclear renaissance’, both in Europe and globally, especially in the emerging countries. Under the accumulated pressure of rising demand and climate warming, many new nuclear projects had been proposed. Since 2011 there has been more ambivalence, especially in Europe. Some Member States have even decided to abandon the nuclear sector altogether. This Egmont Paper aims to examine the reactions of the EU regarding nuclear safety since 2011. Firstly, a general description of the nuclear sector in Europe is provided. The nuclear production of electricity currently employs around 500,000 people, including those working in the supply chain. It generates approximately €70 billion per year. It provides roughly 30% of the electricity consumed in the EU. At the end of 2013, there were 131 nuclear power reactors active in the EU, located in 14 countries. Four new reactors are under construction in France, Slovakia and Finland. Secondly, this paper will present the Euratom legal framework regarding nuclear safety. The European Atomic Energy Community (EAEC or Euratom) Treaty was signed in 1957, and somewhat obscured by the European Economic Community (EEC) Treaty. It was a more classical treaty, establishing institutions with limited powers. Its development remained relatively modest until the Chernobyl catastrophe, which provoked many initiatives. The most important was the final adoption of the Nuclear Safety Directive 2009/71. Thirdly, the general symbiosis between Euratom and the International Atomic Energy Agency (IAEA) will be explained. Fourthly, the paper analyses the initiatives taken by the EU in the wake of the Fukushima catastrophe. These initiatives are centred around the famous ‘stress tests’. Fifthly, the most important legal change brought about by this event was the revision of Directive 2009/71. Directive 2014/87 has been adopted quite rapidly, and has deepened in various ways the role of the EU in nuclear safety. It has reinforced the role and effective independence of the national regulatory authorities. It has enhanced transparency on nuclear safety matters. It has strengthened principles, and introduced new general nuclear safety objectives and requirements, addressing specific technical issues across the entire life cycle of nuclear installations, and in particular, nuclear power plants. It has extended monitoring and the exchange of experiences by establishing a European system of peer reviews. Finally, it has established a mechanism for developing EU-wide harmonized nuclear safety guidelines. In spite of these various improvements, Directive 2014/87 Euratom still reflects the ambiguity of the Euratom system in general, and especially in the field of nuclear safety. The use of nuclear energy remains controversial among Member States. Some of them remain adamantly in favour, others against or ambivalent. The intervention of the EAEC institutions remains sensitive. The use of the traditional Community method remains limited. The peer review method remains a very peculiar mechanism that deserves more attention.
Resumo:
The outlook for natural gas demand is often considered bright, especially for gas used to generate electricity. This is because gas is the cleanest of all fossil fuels. The carbon intensity of modern gas-fired power stations is less than 50% that of modern coal plants. Moreover, gas-fired units are well-suited to follow rapid swings in supply and demand due to their flexibility. In the future, these balancing tasks will become more and more important given the intermittent character of the supply of wind and solar power. Gas seems to hold out the promise of being a key pillar of the energy transition and the perfect partner of renewables. Given the EU’s long-term climate policy goals, however, there is strong evidence that demand for gas for purposes of power generation peaked as early as 2010.
Resumo:
Bibliography: p. 151-166
Resumo:
Cover title.
Resumo:
"November 1981."
Resumo:
Mode of access: Internet.
Resumo:
Includes bibliographies.
Resumo:
Mode of access: Internet.
Resumo:
Ten of the essays included in this volume first appeared in the Encyclopaedia britannica, the Times, the Morning post, the National review, the Nineteenth century and after, the Cornhill magazine, and the Naval annual ... The paper on "Naval strategy and tactics at the time of Trafalgar" was read at the Institute of naval architects, and that on "The supply and communications of a fleet" at the Hong-Kong United service institution.
Resumo:
"AR/ES/79-28"
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
"December 2008"--Colophon.
Resumo:
Thesis (Master's)--University of Washington, 2016-06
Resumo:
Purpose: Although manufacturers of bicycle power monitoring devices SRM and Power Tap (PT) claim accuracy to within 2.5%, there are limited scientific data available in support. The purpose of this investigation was to assess the accuracy of SRM and PT under different conditions. Methods: First, 19 SRM were calibrated, raced for 11 months, and retested using a dynamic CALRIG (50-1000 W at 100 rpm). Second, using the same procedure, five PT were repeat tested on alternate days. Third, the most accurate SRM and PT were tested for the influence of cadence (60, 80, 100, 120 rpm), temperature (8 and 21degreesC) and time (1 h at similar to300 W) on accuracy. Finally, the same SRM and PT were downloaded and compared after random cadence and gear surges using the CALRIG and on a training ride. Results: The mean error scores for SRM and PT factory calibration over a range of 50-1000 W were 2.3 +/- 4.9% and -2.5 +/- 0.5%, respectively. A second set of trials provided stable results for 15 calibrated SRM after 11 months (-0.8 +/- 1.7%), and follow-up testing of all PT units confirmed these findings (-2.7 +/- 0.1%). Accuracy for SRM and PT was not largely influenced by time and cadence; however. power output readings were noticeably influenced by temperature (5.2% for SRM and 8.4% for PT). During field trials, SRM average and max power were 4.8% and 7.3% lower, respectively, compared with PT. Conclusions: When operated according to manufacturers instructions, both SRM and PT offer the coach, athlete, and sport scientist the ability to accurately monitor power output in the lab and the field. Calibration procedures matching performance tests (duration, power, cadence, and temperature) are, however, advised as the error associated with each unit may vary.