888 resultados para Investment Calculation


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis examines the impact of foreign direct investment (FDI) on Vietnamese economy based on Partial Adjustment Model and time series data from 1976 to 2004. FDI is shown to have not only short run but also long run effect on gross domestic product (GDP) of Vietnam. However, elasticity of GDP with respect to FDI is small and it will take many years to fully manifest itself. The impact of trade openness on GDP has also been examined and it is shown to be stronger than that of FDI. The paper offers a number of explanations and discusses briefly suggestions in order to increase the contribution of FDI to Vietnam’s economic development.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper investigates the impact of inward FDI (Foreign Direct Investment) on international trade of China empirically on the country level by using panel data from 1984 to 2007. Two separate transformed models which are based on the gravity equation and refer to the econometric models of some previous studies, are used in this paper to estimate the effect of FDI inflows on exports and imports respectively. The estimation results confirmed the complementary relationship between FDI inflows and trade of China both on exports and imports, which has also been supported by previous empirical studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The cost of a road construction over its service life is a function of the design, quality of construction, maintenance strategies and maintenance operations. Unfortunately, designers often neglect a very important aspect which is the possibility to perform future maintenance activities. The focus is mainly on other aspects such as investment costs, traffic safety, aesthetic appearance, regional development and environmental effects. This licentiate thesis is a part of a Ph.D. project entitled “Road Design for lower maintenance costs” that aims to examine how the life-cycle costs can be optimized by selection of appropriate geometrical designs for the roads and their components. The result is expected to give a basis for a new method used in the road planning and design process using life-cycle cost analysis with particular emphasis on road maintenance. The project started with a review of literature with the intention to study conditions causing increased needs for road maintenance, the efforts made by the road authorities to satisfy those needs and the improvement potential by consideration of maintenance aspects during planning and design. An investigation was carried out to identify the problems which obstruct due consideration of maintenance aspects during the road planning and design process. This investigation focused mainly on the road planning and design process at the Swedish Road Administration. However, the road planning and design process in Denmark, Finland and Norway were also roughly evaluated to gain a broader knowledge about the research subject. The investigation was carried out in two phases: data collection and data analysis. Data was collected by semi-structured interviews with expert actors involved in planning, design and maintenance and by a review of design-related documents. Data analyses were carried out using a method called “Change Analysis”. This investigation revealed a complex combination of problems which result in inadequate consideration of maintenance aspects. Several urgent needs for changes to eliminate these problems were identified. Another study was carried out to develop a model for calculation of the repair costs for damages of different road barrier types and to analyse how factors such as road type, speed limits, barrier types, barrier placement, type of road section, alignment and seasonal effects affect the barrier damages and the associated repair costs. This study was carried out using a method called the “Case Study Research Method”. Data was collected from 1087 barrier repairs in two regional offices of the Swedish Road Administration, the Central Region and the Western Region. A table was established for both regions containing the repair cost per vehicle kilometre for different combinations of barrier types, road types and speed limits. This table can be used by the designers in the calculation of the life-cycle costs for different road barrier types.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The cost of a road construction over its service life is a function of design, quality of construction as well as maintenance strategies and operations. An optimal life-cycle cost for a road requires evaluations of the above mentioned components. Unfortunately, road designers often neglect a very important aspect, namely, the possibility to perform future maintenance activities. Focus is mainly directed towards other aspects such as investment costs, traffic safety, aesthetic appearance, regional development and environmental effects. This doctoral thesis presents the results of a research project aimed to increase consideration of road maintenance aspects in the planning and design process. The following subgoals were established: Identify the obstacles that prevent adequate consideration of future maintenance during the road planning and design process; and Examine optimisation of life-cycle costs as an approach towards increased efficiency during the road planning and design process. The research project started with a literature review aimed at evaluating the extent to which maintenance aspects are considered during road planning and design as an improvement potential for maintenance efficiency. Efforts made by road authorities to increase efficiency, especially maintenance efficiency, were evaluated. The results indicated that all the evaluated efforts had one thing in common, namely ignorance of the interrelationship between geometrical road design and maintenance as an effective tool to increase maintenance efficiency. Focus has mainly been on improving operating practises and maintenance procedures. This fact might also explain why some efforts to increase maintenance efficiency have been less successful. An investigation was conducted to identify the problems and difficulties, which obstruct due consideration of maintainability during the road planning and design process. A method called “Change Analysis” was used to analyse data collected during interviews with experts in road design and maintenance. The study indicated a complex combination of problems which result in inadequate consideration of maintenance aspects when planning and designing roads. The identified problems were classified into six categories: insufficient consulting, insufficient knowledge, regulations and specifications without consideration of maintenance aspects, insufficient planning and design activities, inadequate organisation and demands from other authorities. Several urgent needs for changes to eliminate these problems were identified. One of the problems identified in the above mentioned study as an obstacle for due consideration of maintenance aspects during road design was the absence of a model for calculating life-cycle costs for roads. Because of this lack of knowledge, the research project focused on implementing a new approach for calculating and analysing life-cycle costs for roads with emphasis on the relationship between road design and road maintainability. Road barriers were chosen as an example. The ambition is to develop this approach to cover other road components at a later stage. A study was conducted to quantify repair rates for barriers and associated repair costs as one of the major maintenance costs for road barriers. A method called “Case Study Research Method” was used to analyse the effect of several factors on barrier repairs costs, such as barrier type, road type, posted speed and seasonal effect. The analyses were based on documented data associated with 1625 repairs conducted in four different geographical regions in Sweden during 2006. A model for calculation of average repair costs per vehicle kilometres was created. Significant differences in the barrier repair costs were found between the studied barrier types. In another study, the injuries associated with road barrier collisions and the corresponding influencing factors were analysed. The analyses in this study were based on documented data from actual barrier collisions between 2005 and 2008 in Sweden. The result was used to calculate the cost for injuries associated with barrier collisions as a part of the socio-economic cost for road barriers. The results showed significant differences in the number of injuries associated with collisions with different barrier types. To calculate and analyse life-cycle costs for road barriers a new approach was developed based on a method called “Activity-based Life-cycle Costing”. By modelling uncertainties, the presented approach gives a possibility to identify and analyse factors crucial for optimising life-cycle costs. The study showed a great potential to increase road maintenance efficiency through road design. It also showed that road components with low investment costs might not be the best choice when including maintenance and socio-economic aspects. The difficulties and problems faced during the collection of data for calculating life-cycle costs for road barriers indicated a great need for improving current data collecting and archiving procedures. The research focused on Swedish road planning and design. However, the conclusions can be applied to other Nordic countries, where weather conditions and road design practices are similar. The general methodological approaches used in this research project may be applied also to other studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this thesis the solar part of a large grid-connected photovoltaic system design has been done. The main purpose was to size and optimize the system and to present figures helping to evaluate the prospective project rationality, which can potentially be constructed on a contaminated area in Falun. The methodology consisted in PV market study and component selection, site analysis and defining suitable area for solar installation; and system configuration optimization based on PVsyst simulations and Levelized Cost of Energy calculations. The procedure was mainly divided on two parts, preliminary and detailed sizing. In the first part the objective was complex, which included the investigation of the most profitable component combination and system optimization due to tilt and row distance. It was done by simulating systems with different components and orientations, which were sized for the same 100kW inverter in order to make a fair comparison. For each simulated result a simplified LCOE calculation procedure was applied. The main results of this part show that with the price of 0.43 €/Wp thin-film modules were the most cost effective solution for the case with a great advantage over crystalline type in terms of financial attractiveness. From the results of the preliminary study it was possible to select the optimal system configuration, which was used in the detailed sizing as a starting point. In this part the PVsyst simulations were run, which included full scale system design considering near shadings created by factory buildings. Additionally, more complex procedure of LCOE calculation has been used here considered insurances, maintenance, time value of money and possible cost reduction due to the system size. Two system options were proposed in final results; both cover the same area of 66000 m2. The first one represents an ordinary South faced design with 1.1 MW nominal power, which was optimized for the highest performance. According to PVsyst simulations, this system should produce 1108 MWh/year with the initial investment of 835,000 € and 0.056 €/kWh LCOE. The second option has an alternative East-West orientation, which allows to cover 80% of occupied ground and consequently have 6.6 MW PV nominal power. The system produces 5388 MWh/year costs about 4500,000 € and delivers electricity with the same price of 0.056 €/kWh. Even though the EW solution has 20% lower specific energy production, it benefits mainly from lower relative costs for inverters, mounting and annual maintenance expenses. After analyzing the performance results, among the two alternatives none of the systems showed a clear superiority so there was no optimal system proposed. Both, South and East-West solutions have own advantages and disadvantages in terms of energy production profile, configuration, installation and maintenance. Furthermore, the uncertainty due to cost figures assumptions restricted the results veracity.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study aims to investigate the relation between foreign direct investment (FDI) and per capita gross domestic product (GDP) in Pakistan. The study is based on a basic Cobb-Douglas production function. Population over age 15 to 64 is used as a proxy for labor in the investigation. The other variables used are gross capital formation, technological gap and a dummy variable measuring among other things political stability. We find positive correlation between GDP per capita in Pakistan and two variables, FDI and population over age 15 to 64. The GDP gap (gap between GDP of USA and GDP of Pakistan) is negatively correlated with GDP per capita as expected. Political instability, economic crisis, wars and polarization in the society have no significant impact on GDP per capita in the long run.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Institutions continue to face increasing pressure from faculty, students, and other concerned constituents to divest endowment holdings from perceived social injustices. In this report, investment officers and advisory committee members offer insight into institutional practices used to respond to these concerns through the adoption of socially responsible investment policies and other socially responsible investment options. Contacts offer recommendations on balancing the administration’s fiduciary responsibility to ensure maximum endowment returns with the social concerns of institutional constituents.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper investigates the impact of FDI on the productivity of Portuguese manufacturing sectors. Model specification is improved by considering the choice of the most appropriate interval of the technological gap for spillovers diffusion. We also allow for sectoral variation in the coefficients of the spillover effect; idiosyncratic sectoral factors are identified by means of a fixed effects model. Inter-sectoral positive spillover effects are examined. Significant spillovers require a proper technological differential between foreign and domestic producers and favourable sectoral characteristics. They may occur in modern industries in which the foreign firms have a clear, but not too sharp, edge on the domestic ones. Agglomeration effects are also one pertinent specific influence.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article studies the productive impact of infrastructure investment in Brazil. Public-capital expenditures in the country have decreased continuously over the last two decades, and this paper shows the significant impact this has had on infrastructure stocks. Cointegration analysis is used to investigate the long-run association between output and infrastructure, the results being then used to study the short-run dynamic of these variables. Whether in the short or long run, the productive impact of infrastructure was found to be relevant. Other group of simulations studies the impact of expanding capital expenditures through debt finance on debt to GDP ratio as well as on public cash áow and net worth.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador: