892 resultados para Engineering Asset Management
Resumo:
This paper proposes a method for power flow control between utility and microgrid through back-to-back converters, which facilitates desired real and reactive power flow between utility and microgrid. In the proposed control strategy, the system can run in two different modes depending on the power requirement in the microgrid. In mode-1, specified amount of real and reactive power are shared between the utility and the microgrid through the back-to-back converters. Mode-2 is invoked when the power that can be supplied by the DGs in the microgrid reaches its maximum limit. In such a case, the rest of the power demand of the microgrid has to be supplied by the utility. An arrangement between DGs in the microgrid is proposed to achieve load sharing in both grid connected and islanded modes. The back-to-back converters also provide total frequency isolation between the utility and the microgrid. It is shown that the voltage or frequency fluctuation in the utility side has no impact on voltage or power in microgrid side. Proper relay-breaker operation coordination is proposed during fault along with the blocking of the back-to-back converters for seamless resynchronization. Both impedance and motor type loads are considered to verify the system stability. The impact of dc side voltage fluctuation of the DGs and DG tripping on power sharing is also investigated. The efficacy of the proposed control ar-rangement has been validated through simulation for various operating conditions. The model of the microgrid power system is simulated in PSCAD.
Resumo:
The following paper presents an evaluation of airborne sensors for use in vegetation management in powerline corridors. Three integral stages in the management process are addressed including, the detection of trees, relative positioning with respect to the nearest powerline and vegetation height estimation. Image data, including multi-spectral and high resolution, are analyzed along with LiDAR data captured from fixed wing aircraft. Ground truth data is then used to establish the accuracy and reliability of each sensor thus providing a quantitative comparison of sensor options. Tree detection was achieved through crown delineation using a Pulse-Coupled Neural Network (PCNN) and morphologic reconstruction applied to multi-spectral imagery. Through testing it was shown to achieve a detection rate of 96%, while the accuracy in segmenting groups of trees and single trees correctly was shown to be 75%. Relative positioning using LiDAR achieved a RMSE of 1.4m and 2.1m for cross track distance and along track position respectively, while Direct Georeferencing achieved RMSE of 3.1m in both instances. The estimation of pole and tree heights measured with LiDAR had a RMSE of 0.4m and 0.9m respectively, while Stereo Matching achieved 1.5m and 2.9m. Overall a small number of poles were missed with detection rates of 98% and 95% for LiDAR and Stereo Matching.
Resumo:
This paper has two main sections, the first of which presents a summarized review of the literature concerning previous studies on the implementation of ISO 9000 quality management systems (QMSs) both in global construction companies as well as in Indonesian construction firms, and the perceived correlation between organisational culture and QMS practices in the construction sector. The first section of the paper contributes to the development of the second section, which presents details of the research project being undertaken. Based on the fundamental questions that led to the development of the main research objectives, suitable research methods have been developed in order to meet these objectives. Primary data will be collected by use of a mixed methods approach, i.e., questionnaire surveys and focus group discussions/interviews in order to obtain opinions from respondents drawn from targeted ISO construction firms. Most of the data expected to be obtained will be in future be analyzed using statistical software then the findings will be discussed in order to ultimately develop a culture-based QMS framework.
Resumo:
The case study of Lusoponte illustrates the concession awarded by the Portuguese Government to finance, design, build and operate two bridges over the Tagus in Lisbon, Portugal. It includes an overview of the project's background and an analysis of the main risk categories stating both the actual risks encountered and the mitigation measures adopted. Throughout the project a great attention was given to whole life cycle costs, and gains in efficiency and cost control. Among the lessons that can be learned from both the public and private sector is that a complete risk management analysis must include not only the technical factors but also a realistic assessment of environmental and social risks. These were the risks that were somewhat overseen and that caused the main problems to the project's development.
Resumo:
Over the past decade there have been a large number of significant innovations in manufacturing which have resulted in more flexible and cost efficient methods and higher quality products, as manufacturers have set about upgrading their processes, systems and performance. This study compares the use of technologies and improvement programs between OECD and Non-OECD countries, and also between small and large firms, and examines differences in the use and outcomes across the economies and different sized firms. The empirical analysis provides an opportunity to test whether the ‘capabilities’ or strengths of a firm can be linked to these activities and examines if developing economies are using technology or management programs such as quality management and business process re-engineering to catch up to manufacturers in developed economies. The analysis utilises data from the second International Manufacturing Strategy Survey (IMSS), which encompasses 703 firms in 23 countries.
Resumo:
Purpose : Effective flow of data and communication at every stage of a construction project is essential for achieving required coordination and collaboration between the project participants, leading to successful management of the projects. In present scenario, when project participants are geographically separated, adoption of information communication technology (ICT) enables such effective communication. Thus, the purpose of this paper is to focus on ICT adoption for building project management.---------- Design/methodology/approach : It is difficult to quantitatively evaluate the benefits of ICT adoption in the multiple enterprise scenario of building project management. It requires qualitative analysis based on the perceptions of the construction professionals. The paper utilizes interpretive structural modeling (ISM) technique to assess importance of perceived benefits and their driving power and dependence on other benefits.---------- Findings : The developed ISM model shows that all the categories of benefits, i.e. benefits related to projects, team management, technology, and organization are inter-related and cannot be achieved in isolation. But, organization- and technology-related benefits have high-driving power and these are “strategic benefits” for the project team organizations. Thus, organizations are required to give more attention on strategically increasing these benefits from application of ICT. Originality/value – This analysis provides a road map to managers or project management organizations to decide that if they are planning ICT adoption for achieving certain benefits then which are the other driving benefits that should be achieved prior to that and also which are the dependent benefits that would be achieved by default.
Resumo:
Building project management requires effective coordination and collaboration between multiple project members. It can be achieved through real time communication flow between all. In present scenario, it can be achieved through adoption of Information and Communication Technologies (ICT). Construction industry primarily comprises small and medium enterprises (SMEs). Also, ICT adoption has been slow in the industry.---------- Research is required to assess the factors that affect ICT adoption at the three levels of industry, organization and people, with focus on SMEs. This paper discusses a component of the research undertaken to study these factors and issues in the context of Indian construction industry. A questionnaire survey was conducted and through quantitative data analysis the extent of adoption of formal Project Management processes, ICT adoption for these processes and factors including perception based factors affecting ICT adoption were studied. Results of data analysis includes identification of issues that require action at the three study levels.---------- The results can be generalized for other countries with due considerations, specifically for countries where the construction industry is similar to Indian construction industry in terms of working methodologies or for large countries.
Resumo:
Timberland is seen as a long-term investment which has recently received increased institutional investor attention in many countries and potentially provides added value in a mixed-asset portfolio. Using the National Council of Real Estate Investment Fiduciaries (NCREIF) timberland series, this paper analyses the risk-adjusted performance and portfolio diversification benefits of timberland in the United States over the period of 1987-2007. U.S. timberland is seen to have been a strongly performed asset class with significant portfolio diversification benefits over this period; with a significant portfolio role separate to that of real estate. However, recent years have seen reduced risk-adjusted returns, with some loss of portfolio diversification benefits of timberland with stocks and real estate. Global drivers are likely to see increased future demand for timberland investment.
Resumo:
Lifecycle funds offered by retirement plan providers allocate aggressively to risky asset classes when the employee participants are young, gradually switching to more conservative asset classes as they grow older and approach retirement. This approach focuses on maximizing growth of the accumulation fund in the initial years and preserving its value in the later years. The authors simulate terminal wealth outcomes based on conventional lifecycle asset allocation rules as well as on contrarian strategies that reverse the direction of asset switching. The evidence suggests that the growth in portfolio size over time significantly impacts the asset allocation decision. Due to the portfolio size effect that is observed by the authors, the terminal value of accumulation in retirement accounts is influenced more by the asset allocation strategy adopted in later years relative to that adopted in early years. By mechanistically switching to conservative assets in the later years of a plan, lifecycle strategies sacrifice significant growth opportunity and prove counterproductive to the participant's wealth accumulation objective. The authors' conclude that this sacrifice does not seem to be compensated adequately in terms of reducing the risk of potentially adverse outcomes.
Resumo:
New air traffic automated separation management concepts are constantly under investigation. Yet most of the automated separation management algorithms proposed over the last few decades have assumed either perfect communication or exact knowledge of all aircraft locations. In realistic environments, these idealized assumptions are not valid and any communication failure can potentially lead to disastrous outcomes. This paper examines the separation performance behavior of several popular algorithms during periods of information loss. This comparison is done through simulation studies. These simulation studies suggest that communication failure can cause the performance of these separation management algorithms to degrade significantly. This paper also describes some preliminary flight tests.
Resumo:
Before the Global Financial Crisis many providers of finance had growth mandates and actively pursued development finance deals as a way of gaining higher returns on funds with regular capital turnover and re-investment possible. This was able to be achieved through high gearing and low presales in a strong market. As asset prices fell, loan covenants breached and memories of the 1990’s returned, banks rapidly adjusted their risk appetite via retraction of gearing and expansion of presale requirements. Early signs of loosening in bank credit policy are emerging, however parties seeking development finance are faced with a severely reduced number of institutions from which to source funding. The few institutions that are lending are filtering out only the best credit risks by way of constrictive credit conditions including: low loan to value ratios, the corresponding requirement to contribute high levels of equity, lack of support in non-prime locations and the requirement for only borrowers with well established track records. In this risk averse and capital constrained environment, the ability of developers to proceed with real estate developments is still being constrained by their inability to obtain project finance. This paper will examine the pre and post GFC development finance environment. It will identify the key lending criteria relevant to real estate development finance and will detail the related changes to credit policies over this period. The associated impact to real estate development projects will be presented, highlighting the significant constraint to supply that the inability to obtain finance poses.
Resumo:
This paper proposes a novel automated separation management concept in which onboard decision support is integrated within a centralised air traffic separation management system. The onboard decision support system involves a decentralised separation manager that can overrule air traffic management instructions under certain circumstances. This approach allows the advantages of both centralised and decentralised concepts to be combined (and disadvantages of each separation management approach to be mitigated). Simulation studies are used to illustrate the potential benefits of the combined separation management concept.
Resumo:
Purpose – Building project management requires real time flow of information between all the project team members or the supply chain members. In the present scenario, when project participants are geographically separated, adoption of Information Communication Technology (ICT) enables such effective communication. But strategic adoption of ICT requires that all the supply chain members follow the accepted methods of communication or the communication protocols. The majority of the construction organizations are small and medium enterprises (SMEs). This research, therefore, proposes to focus on developing IT-enhanced communication protocols for building project management by SMEs. Design/methodology/approach – The research adopts a sequential mixed methods approach, where data collection and analysis are conducted in both the quantitative and qualitative phases of research. Findings – The protocols are proposed as a “Strategic Model for Enhancing ICT Diffusion in Building Projects”. The framework for the model is discussed at three levels of study, i.e industry, organization, and people. Practical implications – While the research was conducted in an Indian context, the research outcome is envisaged to be widely applicable in other countries with due considerations. Originality/value – The developed framework has implications for national level bodies and academic institutions, organizations, people or project managers and is applicable at the international level after due considerations.
Resumo:
Fishers are faced with multiple risks, including unpredictability of future catch rates, prices and costs. While the latter are largely beyond the control of fisheries managers, effective fisheries management should reduce uncertainty about future catches. Different management instruments are likely to have different impacts on the risk perception of fishers, and this should manifest itself in their implicit discount rate. Assuming licence and quota values represent the net present value of the flow of expected future profits, then a proxy for the implicit discount rate of vessels in a fishery can be derived by the ratio of the average level of profits to the average licence/quota value. From this, an indication of the risk perception can be derived, assuming higher discount rates reflect higher levels of systematic risk. In this paper, we apply the capital asset pricing model (CAPM) to determine the risk premium implicit in the discount rates for a range of Australian fisheries, and compare this with the set of management instruments in place. We test the assumption that rights based management instruments lower perceptions of risk in fisheries. We find little evidence to support this assumption. although the analysis was based on only limited data.