891 resultados para Construction and demolition waste
Resumo:
The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports by Latham (1994, Constructing the Team, HMSO, London) and Egan (1998, Rethinking Construction, HMSO, London). A major problem for construction companies is the lack of project predictability. One method of increasing predictability and delivering increased customer value is through the systematic management of construction processes. However, the industry has no methodological mechanism to assess process capability and prioritise process improvements. Standardized Process Improvement for Construction Enterprises (SPICE) is a research project that is attempting to develop a stepwise process improvement framework for the construction industry, utilizing experience from the software industry, and in particular the Capability Maturity Model (CMM), which has resulted in significant productivity improvements in the software industry. This paper introduces SPICE concepts and presents the results from two case studies conducted on design and build projects. These studies have provided further in-sight into the relevance and accuracy of the framework, as well as its value for the construction sector.
Resumo:
Organizational issues are inhibiting the implementation and strategic use of information technologies (IT) in the construction sector. This paper focuses on these issues and explores processes by which emerging technologies can be introduced into construction organizations. The paper is based on a case study, conducted in a major house building company that was implementing a virtual reality (VR) system for internal design review in the regional offices. Interviews were conducted with different members of the organization to explore the introduction process and the use of the system. The case study findings provide insight into the process of change, the constraints that inhibit IT implementation and the relationship between new technology and work patterns within construction organizations. They suggest that (1) user-developer communications are critical for the successful implementation of non-diffused innovations in the construction industry; and (2) successful uptake of IT requires both strategic decision-making by top management and decision-making by technical managers.
Resumo:
The paper provides details of the size and scope of construction research carried out in a number of architecture, civil engineering and building related departments in British universities. After considering the level of funding, the type of research projects undertaken and the resulting outputs, especially how these benefit industry, the paper focuses on the careers of academics and researchers and the way in which research is organized at university, departmental and team levels. Finally, the paper suggests that whilst the construction research community in universities has many strengths, there is a danger that in responding to recent opportunities it may overreach itself. The end result may be disappointing for all parties involved. Some of the factors which would contribute to an effective approach to the development of links between universities and industry are discussed.
Resumo:
Foundation construction process has been an important key point in a successful construction engineering. The frequency of using diaphragm wall construction method among many deep excavation construction methods in Taiwan is the highest in the world. The traditional view of managing diaphragm wall unit in the sequencing of construction activities is to establish each phase of the sequencing of construction activities by heuristics. However, it conflicts final phase of engineering construction with unit construction and effects planning construction time. In order to avoid this kind of situation, we use management of science in the study of diaphragm wall unit construction to formulate multi-objective combinational optimization problem. Because the characteristic (belong to NP-Complete problem) of problem mathematic model is multi-objective and combining explosive, it is advised that using the 2-type Self-Learning Neural Network (SLNN) to solve the N=12, 24, 36 of diaphragm wall unit in the sequencing of construction activities program problem. In order to compare the liability of the results, this study will use random researching method in comparison with the SLNN. It is found that the testing result of SLNN is superior to random researching method in whether solution-quality or Solving-efficiency.
Resumo:
reign real estate capital was a major source of financing domestic property market office construction in Central Europe after the fall of the Berlin Wall in 1989. During the 1990s, over 800 office buildings were either newly constructed or refurbished in Budapest, Prague and Warsaw. The primary focus of this analysis is explaining the spatial construction and redevelopment patterns of the post-1989 office buildings in these cities. Secondarily, we analyze the correlation of foreign direct investment flows to annual construction of office buildings. We seek to explain the location of new or refurbished office buildings in the central business district (CBD) or in non-CBD locations in terms of the effect of time, size of property and other variables, and test whether there is a positive correlation relationship of foreign direct investment flows and new office construction or refurbishment. Integrating relevant foreign direct investment (FDI), economic geography and property theories in the research, the authors attempt to bridge existing gaps in the literature.
Resumo:
This paper re-examines the relative importance of sector and regional effects in determining property returns. Using the largest property database currently available in the world, we decompose the returns on individual properties into a national effect, common to all properties, and a number of sector and regional factors. However, unlike previous studies, we categorise the individual property data into an ever-increasing number of property-types and regions, from a simple 3-by-3 classification, up to a 10 by 63 sector/region classification. In this way we can test the impact that a finer classification has on the sector and regional effects. We confirm the earlier findings of previous studies that sector-specific effects have a greater influence on property returns than regional effects. We also find that the impact of the sector effect is robust across different classifications of sectors and regions. Nonetheless, the more refined sector and regional partitions uncover some interesting sector and regional differences, which were obscured in previous studies. All of which has important implications for property portfolio construction and analysis.
Resumo:
The current research agenda for construction process improvement is heavily influenced by the rhetoric of business process re-engineering (BPR). In contrast to the wider literature on BPR, there is little evidence of critical thought within the construction management research community. A postmodernist interpretation is advocated whereby the reality of management practice is defined by the dominant management discourse. The persuasiveness of BPR rhetoric is analysed with particular reference to the way in which it plays on the insecurity of modern managers. Despite the lip service given to ‘empowerment’ and ‘teamwork’, the dominant theme of the re-engineering movement is that of technocratic totalitarianism. From a critical perspective, it is suggested that BPR is imposed on construction organizations to ensure continued control by the industry's dominant power groups. Whilst industry leaders are fond of calling for ‘attitudinal and cultural improvement’, the language of the accepted research agenda continually reinforces the industry's dominant culture of ‘control and command’. Therefore, current research directions in process improvement perpetuate existing attitudes rather than facilitating cultural change. The concept of lean construction is seen to be the latest manifestation of this phenomenon.
Resumo:
While the construction industry is frequently encouraged to learn from other business sectors, the difficulties of transferring knowledge from one context to another are rarely acknowledged. The problematic nature of knowledge is addressed with particular emphasis on the concept of contextual embeddedness. From this point of view, the process of 'knowledge transfer' depends upon a prolonged process of socialization between actors from both the 'receiving' and 'sending' contexts networking. It is contended that a significant conceptual chasm exists between the exhortations of industry leaders to learn from other sectors and the theoretical complexities associated with knowledge transfer. An ongoing research project is described that seeks to facilitate knowledge sharing between construction and aerospace. A novel approach to knowledge sharing based upon soft systems methodology (SSM) (Mode 2) is described and justified. Initial findings from the first cycle of the research are discussed and used to highlight the importance of context in the implementation of supply chain management.
Resumo:
Global temperatures are expected to rise by between 1.1 and 6.4oC this century, depending, to a large extent, on the amount of carbon we emit to the atmosphere from now onwards. This warming is expected to have very negative effects on many peoples and ecosystems and, therefore, minimising our carbon emissions is a priority. Buildings are estimated to be responsible for around 50% of carbon emissions in the UK. Potential reductions involve both operational emissions, produced during use, and embodied emissions, produced during manufacture of materials and components, and during construction, refurbishments and demolition. To date the major effort has focused on reducing the, apparently, larger operational element, which is more readily quantifiable and reduction measures are relatively straightforward to identify and implement. Various studies have compared the magnitude of embodied and operational emissions, but have shown considerable variation in the relative values. This illustrates the difficulties in quantifying embodied, as it requires a detailed knowledge of the processes involved in the different life cycle phases, and requires the use of consistent system boundaries. However, other studies have established the interaction between operational and embodied, which demonstrates the importance of considering both elements together in order to maximise potential reductions. This is borne out in statements from both the Intergovernmental Panel on Climate Change and The Low Carbon Construction Innovation and Growth Team of the UK Government. In terms of meeting the 2020 and 2050 timeframes for carbon reductions it appears to be equally, if not more, important to consider early embodied carbon reductions, rather than just future operational reductions. Future decarbonisation of energy supply and more efficient lighting and M&E equipment installed in future refits is likely to significantly reduce operational emissions, lending further weight to this argument. A method of discounting to evaluate the present value of future carbon emissions would allow more realistic comparisons to be made on the relative importance of the embodied and operational elements. This paper describes the results of case studies on carbon emissions over the whole lifecycle of three buildings in the UK, compares four available software packages for determining embodied carbon and suggests a method of carbon discounting to obtain present values for future emissions. These form the initial stages of a research project aimed at producing information on embodied carbon for different types of building, components and forms of construction, in a simplified form, which can be readily used by building designers in optimising building design in terms of minimising overall carbon emissions. Keywords: Embodied carbon; carbon emission; building; operational carbon.
Resumo:
Based on an online image archive documenting the construction and history of an early computing company, the fictional story of "Co-Operative Explanatory Capabilities in Organizational Design and Personnel Management” follows the development of an experimental approach to worker productivity into a religious cult. The project investigates the place of creativity in efficiency management and the operation of bureaucratic systems in a post-industrial work environment. The project has spawned a series of collages, featured on the Economic Thought Projects 7" collaboration with Gelbart, The Eleventh Voyage, as well as the film of Co-Operative Explanatory Capabilities in Organizational Design and Personnel Management, which has also been published as a short story in Vertigo of the Modern and on Sacrifice Press.
Resumo:
In order to achieve sustainability it is necessary to balance the interactions between the built and natural environment. Biodiversity plays an important part towards sustainability within the built environment, especially as the construction industry comes under increasing pressure to take ecological concerns into account. Bats constitute an important component of urban biodiversity and several species are now highly dependent on buildings, making them particularly vulnerable to anthropogenic and environmental changes. As many buildings suitable for use as bat roosts age, they often require re-roofing and traditional bituminous roofing felts are frequently being replaced with breathable roofing membranes (BRMs), which are designed to reduce condensation. Whilst the current position of bats is better in many respects than 30 years ago, new building regulations and modern materials, may substantially reduce the viability of existing roosts. At the same time building regulations require that materials be fit for purpose and with anecdotal evidence that both bats and BRMs may experience problems when the two interact, it is important to know what roost characteristics are essential for house dwelling bats and how these and BRMs may be affected. This paper reviews current literature and knowledge and considers the possible ways in which bats and BRMs may interact, how this could affect existing bat roosts within buildings and the implications for BRM service life predictions and warranties. It concludes that in order for the construction and conservation sectors to work together in solving this issue, a set of clear guidelines should be developed for use on a national level.
Resumo:
A detailed analysis of temporal and spatial trends in nitrogen (N) speciation and phosphorus (P) fractionation in the Wylye, a lowland Chalk sub-catchment of the Hampshire Avon, UK is presented, identifying the sources contributing to nutrient enrichment, and temporal variability in the fractionation of nutrients in transit from headwaters to lower reaches of the river. Samples were collected weekly from ten monitoring stations with daily sampling at three further sites over one year, and monthly inorganic N and total reactive P (TRP) concentrations at three of the ten weekly monitoring stations over a ten year period are also presented. The data indicate significant daily and seasonal variation in nutrient fractionation in the water column, resulting from plant uptake of dissolved organic and inorganic nutrient fractions in the summer months, increased delivery of both N and P from diffuse sources in the autumn to winter period and during high flow events, and lack of dilution of point source discharges to the Wylye from septic tank, small package Sewage Treatment Works (STW) and urban Waste Water Treatment Works (WwTW) during the summer low flow period. Weekly data show that contributing source areas vary along the river with headwater N and P strongly influenced by diffuse inorganic N and particulate P fluxes, and SRP and organic-rich point source contributions from STW and WwTW having a greater influence in the lower reaches. Long-term data show a decrease in TRP concentrations at all three monitoring stations, with the most pronounced decrease occurring downstream from Warminster WwTW, following the introduction of P stripping at the works in 2001. Inorganic N demonstrates no statistically significant change over the ten year period of record in the rural headwaters, but an increase in the lower reaches downstream from the WwTW which may be due to urban expansion in the lower catchment.