877 resultados para Building, Communication, ICT, Protocol, Smart-Medium Enterprise
Resumo:
The construction industry has incurred a considerable amount of waste as a result of poor logistics supply chain network management. Therefore, managing logistics in the construction industry is critical. An effective logistic system ensures delivery of the right products and services to the right players at the right time while minimising costs and rewarding all sectors based on value added to the supply chain. This paper reports on an on-going research study on the concept of context-aware services delivery in the construction project supply chain logistics. As part of the emerging wireless technologies, an Intelligent Wireless Web (IWW) using context-aware computing capability represents the next generation ICT application to construction-logistics management. This intelligent system has the potential of serving and improving the construction logistics through access to context-specific data, information and services. Existing mobile communication deployments in the construction industry rely on static modes of information delivery and do not take into account the worker’s changing context and dynamic project conditions. The major problems in these applications are lack of context-specificity in the distribution of information, services and other project resources, and lack of cohesion with the existing desktop based ICT infrastructure. The research works focus on identifying the context dimension such as user context, environmental context and project context, selection of technologies to capture context-parameters such wireless sensors and RFID, selection of supporting technologies such as wireless communication, Semantic Web, Web Services, agents, etc. The process of integration of Context-Aware Computing and Web-Services to facilitate the creation of intelligent collaboration environment for managing construction logistics will take into account all the necessary critical parameters such as storage, transportation, distribution, assembly, etc. within off and on-site project.
Resumo:
A wireless sensor network (WSN) is a group of sensors linked by wireless medium to perform distributed sensing tasks. WSNs have attracted a wide interest from academia and industry alike due to their diversity of applications, including home automation, smart environment, and emergency services, in various buildings. The primary goal of a WSN is to collect data sensed by sensors. These data are characteristic of being heavily noisy, exhibiting temporal and spatial correlation. In order to extract useful information from such data, as this paper will demonstrate, people need to utilise various techniques to analyse the data. Data mining is a process in which a wide spectrum of data analysis methods is used. It is applied in the paper to analyse data collected from WSNs monitoring an indoor environment in a building. A case study is given to demonstrate how data mining can be used to optimise the use of the office space in a building.
Resumo:
This paper proposes a conceptual model of a context-aware group support system (GSS) to assist local council employees to perform collaborative tasks in conjunction with inter- and intra-organisational stakeholders. Most discussions about e-government focus on the use of ICT to improve the relationship between government and citizen, not on the relationship between government and employees. This paper seeks to expose the unique culture of UK local councils and to show how a GSS could support local government employer and employee needs.
Resumo:
People's interaction with the indoor environment plays a significant role in energy consumption in buildings. Mismatching and delaying occupants' feedback on the indoor environment to the building energy management system is the major barrier to the efficient energy management of buildings. There is an increasing trend towards the application of digital technology to support control systems in order to achieve energy efficiency in buildings. This article introduces a holistic, integrated, building energy management model called `smart sensor, optimum decision and intelligent control' (SMODIC). The model takes into account occupants' responses to the indoor environments in the control system. The model of optimal decision-making based on multiple criteria of indoor environments has been integrated into the whole system. The SMODIC model combines information technology and people centric concepts to achieve energy savings in buildings.
Resumo:
There is a growing concern in reducing greenhouse gas emissions all over the world. The U.K. has set 34% target reduction of emission before 2020 and 80% before 2050 compared to 1990 recently in Post Copenhagen Report on Climate Change. In practise, Life Cycle Cost (LCC) and Life Cycle Assessment (LCA) tools have been introduced to construction industry in order to achieve this such as. However, there is clear a disconnection between costs and environmental impacts over the life cycle of a built asset when using these two tools. Besides, the changes in Information and Communication Technologies (ICTs) lead to a change in the way information is represented, in particular, information is being fed more easily and distributed more quickly to different stakeholders by the use of tool such as the Building Information Modelling (BIM), with little consideration on incorporating LCC and LCA and their maximised usage within the BIM environment. The aim of this paper is to propose the development of a model-based LCC and LCA tool in order to provide sustainable building design decisions for clients, architects and quantity surveyors, by then an optimal investment decision can be made by studying the trade-off between costs and environmental impacts. An application framework is also proposed finally as the future work that shows how the proposed model can be incorporated into the BIM environment in practise.
Resumo:
Considers the application of value management during the briefing and outline design stages of building developments.
Resumo:
The aim of this paper is to present a case study of the adoption of Information and Communication Technologies (ICT) among 6000 small businesses within a locality of Greater Manchester, England. The paper presents an analysis of factors affecting adoption and discusses the wider implications for achieving the European vision of regional 'digital ecosystems".
Resumo:
This paper proposes a practical approach to the enhancement of Quality of Service (QoS) routing by means of providing alternative or repair paths in the event of a breakage of a working path. The proposed scheme guarantees that every Protected Node (PN) is connected to a multi-repair path such that no further failure or breakage of single or double repair paths can cause any simultaneous loss of connectivity between an ingress node and an egress node. Links to be protected in an MPLS network are predefined and a Label Switched path (LSP) request involves the establishment of a working path. The use of multi-protection paths permits the formation of numerous protection paths allowing greater flexibility. Our analysis examined several methods including single, double and multi-repair routes and the prioritization of signals along the protected paths to improve the Quality of Service (QoS), throughput, reduce the cost of the protection path placement, delay, congestion and collision. Results obtained indicated that creating multi-repair paths and prioritizing packets reduces delay and increases throughput in which case the delays at the ingress/egress LSPs were low compared to when the signals had not been classified. Therefore the proposed scheme provided a means to improve the QoS in path restoration in MPLS using available network resources. Prioritizing the packets in the data plane has revealed that the amount of traffic transmitted using a medium and low priority Label Switch Paths (LSPs) does not have any impact on the explicit rate of the high priority LSP in which case the problem of a knock-on effect is eliminated.
Resumo:
Rapid urbanisation in China has resulted in great demands for energy, resources and pressure on the environment. The progress in China's development is considered in the context of energy efficiency in the built environment, including policy, technology and implementation. The key research challenges and opportunities are identified for delivering a low carbon built environment. The barriers include the existing traditional sequential design process, the lack of integrated approaches, and insufficient socio-technical knowledge. A proposed conceptual systemic model of an integrated approach identifies research opportunities. The organisation of research activities should be initiated, operated, and managed in a collaborative way among policy makers, professionals, researchers and stakeholders. More emphasis is needed on integrating social, economic and environmental impacts in the short, medium and long terms. An ideal opportunity exists for China to develop its own expertise, not merely in a technical sense but in terms of vision and intellectual leadership in order to flourish in global collaborations.
Resumo:
Gossip (or Epidemic) protocols have emerged as a communication and computation paradigm for large-scale networked systems. These protocols are based on randomised communication, which provides probabilistic guarantees on convergence speed and accuracy. They also provide robustness, scalability, computational and communication efficiency and high stability under disruption. This work presents a novel Gossip protocol named Symmetric Push-Sum Protocol for the computation of global aggregates (e.g., average) in decentralised and asynchronous systems. The proposed approach combines the simplicity of the push-based approach and the efficiency of the push-pull schemes. The push-pull schemes cannot be directly employed in asynchronous systems as they require synchronous paired communication operations to guarantee their accuracy. Although push schemes guarantee accuracy even with asynchronous communication, they suffer from a slower and unstable convergence. Symmetric Push- Sum Protocol does not require synchronous communication and achieves a convergence speed similar to the push-pull schemes, while keeping the accuracy stability of the push scheme. In the experimental analysis, we focus on computing the global average as an important class of node aggregation problems. The results have confirmed that the proposed method inherits the advantages of both other schemes and outperforms well-known state of the art protocols for decentralized Gossip-based aggregation.
Resumo:
Numerous Building Information Modelling (BIM) tools are well established and potentially beneficial in certain uses. However, issues of adoption and implementation persist, particularly for on-site use of BIM tools in the construction phase. We describe an empirical case-study of the implementation of an innovative ‘Site BIM’ system on a major hospital construction project. The main contractor on the project developed BIM-enabled tools to allow site workers using mobile tablet personal computers to access design information and to capture work quality and progress data on-site. Accounts show that ‘Site BIM’, while judged to be successful and actively supporting users, was delivered through an exploratory and emergent development process of informal prototyping. Technical IT skills were adopted into the construction project through personal relationships and arrangements rather than formal processes. Implementation was driven by construction project employees rather than controlled centrally by the corporate IT function.
Resumo:
How can organizations use digital infrastructure to realise physical outcomes? The design and construction of London Heathrow Terminal 5 is analysed to build new theoretical understanding of visualization and materialization practices in the transition from digital design to physical realisation. In the project studied, an integrated software solution is introduced as an infrastructure for delivery. The analyses articulate the work done to maintain this digital infrastructure and also to move designs beyond the closed world of the computer to a physical reality. In changing medium, engineers use heterogeneous trials to interrogate and address the limitations of an integrated digital model. The paper explains why such trials, which involve the reconciliation of digital and physical data through parallel and iterative forms of work, provide a robust practice for realizing goals that have physical outcomes. It argues that this practice is temporally different from, and at times in conflict with, building a comprehensive dataset within the digital medium. The paper concludes by discussing the implications for organizations that use digital infrastructures in seeking to accomplish goals in digital and physical media.
Resumo:
Although ensemble prediction systems (EPS) are increasingly promoted as the scientific state-of-the-art for operational flood forecasting, the communication, perception, and use of the resulting alerts have received much less attention. Using a variety of qualitative research methods, including direct user feedback at training workshops, participant observation during site visits to 25 forecasting centres across Europe, and in-depth interviews with 69 forecasters, civil protection officials, and policy makers involved in operational flood risk management in 17 European countries, this article discusses the perception, communication, and use of European Flood Alert System (EFAS) alerts in operational flood management. In particular, this article describes how the design of EFAS alerts has evolved in response to user feedback and desires for a hydrographic-like way of visualizing EFAS outputs. It also documents a variety of forecaster perceptions about the value and skill of EFAS forecasts and the best way of using them to inform operational decision making. EFAS flood alerts were generally welcomed by flood forecasters as a sort of ‘pre-alert’ to spur greater internal vigilance. In most cases, however, they did not lead, by themselves, to further preparatory action or to earlier warnings to the public or emergency services. Their hesitancy to act in response to medium-term, probabilistic alerts highlights some wider institutional obstacles to the hopes in the research community that EPS will be readily embraced by operational forecasters and lead to immediate improvements in flood incident management. The EFAS experience offers lessons for other hydrological services seeking to implement EPS operationally for flood forecasting and warning. Copyright © 2012 John Wiley & Sons, Ltd.