890 resultados para project cost engineering
Resumo:
Chemical engineering education is challenged around the world by demands and rapid changes encompassing a wide range of technical and social drivers. Graduates must be prepared for practice in increasingly diverse workplace environments in which generic or transferable attributes such as communication and teamwork together with technical excellence are mandated by prospective employers and society at large. If academe is to successfully deliver on these graduate attributes, effective curriculum design needs to include appropriate educational processes as well as course content. Conventional teacher centred approaches, stand-alone courses and retro-fitted remedial modules have not delivered the desired outcomes. Development of the broader spectrum of attributes is more likely when students are engaged with realistic and relevant experiences that demand the integration and practice of these attributes in contexts that the students find meaningful. This paper describes and evaluates The University of Queensland's Project Centred Curriculum in Chemical Engineering (PCC), a programme-wide approach to meeting these requirements. PCC strategically integrates project-based learning with more traditional instruction. Data collected shows improved levels of student attainment of generic skills with institutional and nationally benchmarked indicators showing significant increases in student perceptions of teaching quality, and overall satisfaction with the undergraduate experience. Endorsements from Australian academic, professional and industry bodies also support the approach as more effectively aligning engineering education with professional practice requirements.
Resumo:
An integrated anaerobic-aerobic treatment system of sulphate-laden wastewater was proposed here to achieve low sludge production, low energy consumption and effective sulphide control. Before integrating the whole system, the feasibility of autotrophic denitrification utilising dissolved sulphide produced during anaerobic treatment of sulphate rich wastewater was studied here. An upflow anaerobic sludge blanket reactor was operated to treat sulphate-rich synthetic wastewater (TOC = 100 mg/L and sulphate = 500 mg/L) and its effluent with dissolved sulphide and external nitrate solution were fed into an anoxic biofilter. The anaerobic reactor was able to remove 77-85% of TOC at HRT of 3 h and produce 70-90 mg S/L sulphide in dissolved form for the subsequent denitrification. The performance of anoxic reactor was stable, and the anoxic reactor could remove 30 mg N/L nitrate at HRT of 2 h through autotrophic denitrification. Furthermore, sulphur balance for the anoxic filter showed that more than 90% of the removed sulphide was actually oxidised into sulphate, thereby there was no accumulation of sulphur particles in the filter bed. The net sludge productions were approximately 0.15 to 0.18 g VSS/g COD in the anaerobic reactor and 0.22 to 0.31 g VSS/g NO3--N in the anoxic reactor. The findings in this study will be helpful in developing the integrated treatment system to achieve low-cost excess sludge minimisation.
Resumo:
For second-hand products sold with warranty, the expected warranty cost for an item to the manufacturer, depends on (i) the age and/or usage as well as the maintenance history for the item and (ii) the terms of the warranty policy. The paper develops probabilistic models to compute the expected warranty cost to the manufacturer when the items are sold with free replacement or pro rata warranties. (C) 2000 Elsevier Science Ltd. All rights reserved.
Resumo:
One of the challenges for software engineering is collecting meaningful data from industrial projects. Software process improvement depends on measurement to provide baseline status and confirming evidence of the effect of process changes. Without data, any conclusions rely on intuition and guessing. The Team Software ProcessSM (TSPSM) provides a powerful framework for data collection and analysis, in addition to its primary goal as a basis for highly effective software development. In this paper, we describe the experiences of, and benefits realized by, a team using the TSP for the first time. By reviewing how this particular team collected and used data, we show features of the TSP that make it a powerful foundation for software process improvement.
Resumo:
Like any other natural resources, hydro resources that are capable of generating electricity at cheaper cost give rise to economic rent. Nepal possesses huge amount of such cheaper hydro resources which is far in excess of the domestic demand. The existing rents levied by the governments are not found to address the potential value of resources. In this study hydro rent is calculated for two types of hydropower projects: (i) domestic demand oriented project and (ii) large and export oriented project. In doing so, the study uses the concept of hydro rent as a measure of cost savings achievable by the use of hydro resources over the least cost alternatives. The WASP-III+ optimisation software developed by IAEA has been used to derive two least cost generation expansion plans i.e. one with and the other without the nominated hydro resource. The difference in the costs of two plans gives the rent of the hydro resource.
Resumo:
Global Software Development (GSD) is an emerging distributive software engineering practice, in which a higher communication overhead due to temporal and geographical separation among developers is traded with gains in reduced development cost, improved flexibility and mobility for developers, increased access to skilled resource-pools and convenience of customer involvements. However, due to its distributive nature, GSD faces many fresh challenges in aspects relating to project coordination, awareness, collaborative coding and effective communication. New software engineering methodologies and processes are required to address these issues. Research has shown that, with adequate support tools, Distributed Extreme Programming (DXP) – a distributive variant of an agile methodology – Extreme Programming (XP) can be both efficient and beneficial to GDS projects. In this paper, we present the design and realization of a collaborative environment, called Moomba, which assists a distributed team in both instantiation and execution of a DXP process in GSD projects.
Resumo:
This paper describes and analyses an innovative engineering management course that applies a project management framework in the context of a feasibility study for a prospective research project. The aim is to have students learn aspects of management that will be relevant from the outset of their professional career while simultaneously having immediate value in helping them to manage a research project and capstone design project in their senior year. An integral part of this innovation was the development of a web-based project management tool. While the main objectives of the new course design were achieved, a number of important lessons were learned that would guide the further development and continuous improvement of this course. The most critical of these is the need to achieve the optimum balance in the mind of the students between doing the project and critically analyzing the processes used to accomplish the work.
Resumo:
We present the design rationale and basic workings of a low-cost, easy-to-use power system simulator developed to support investigations into human interface design for a hydropower plant. The power system simulator is based on three important components: models of power system components, a data repository, and human interface elements. Dynamic Data Exchange (DDE) allows simulator components to communicate with each other within the simulator. To construct the modules of the simulator we have combined the advantages of commercial software such as Matlab/Simulink, ActiveX Control, Visual Basic and Excel and integrated them in the simulator. An important advantage of our approach is that further components of the simulator now can be developed independently. An initial assessment of the simulator indicates it is fit for intended purpose.
Resumo:
CO2 Geosequestration is seen by many worldwide scientists and engineers as a leading prospective solution to the global warming problem arising from excessive CO2 and other greenhouse gas emissions. CO2 geosequestration in coal seams has two important strategic benefits: the process has an extremely low risk of leakage, due to the adsorbed state of the CO2 and the known reservoir context of essentially-zero leakage into which it is be injected; the second benefit arises from the valuable by-product, clean burning coalbed methane gas. This paper presents the authors’ experience, knowledge and perspective on what coal properties and engineering processes would favour implementing a demonstration or commercial CO2 storage-in-coal project, in Queensland, Australia. As such, it may be considered a template for screening studies to select the optimum coal seam reservoir, and for preliminary studies in designing the injection system and predicting production response to the technology. The paper concludes by examining the current knowledge gaps of CO2 geosequestration in coal, identifying further basic and applied research topics.