975 resultados para cost planning


Relevância:

20.00% 20.00%

Publicador:

Resumo:

As a result of the more distributed nature of organisations and the inherently increasing complexity of their business processes, a significant effort is required for the specification and verification of those processes. The composition of the activities into a business process that accomplishes a specific organisational goal has primarily been a manual task. Automated planning is a branch of artificial intelligence (AI) in which activities are selected and organised by anticipating their expected outcomes with the aim of achieving some goal. As such, automated planning would seem to be a natural fit to the BPM domain to automate the specification of control flow. A number of attempts have been made to apply automated planning to the business process and service composition domain in different stages of the BPM lifecycle. However, a unified adoption of these techniques throughout the BPM lifecycle is missing. As such, we propose a new intention-centric BPM paradigm, which aims on minimising the specification effort by exploiting automated planning techniques to achieve a pre-stated goal. This paper provides a vision on the future possibilities of enhancing BPM using automated planning. A research agenda is presented, which provides an overview of the opportunities and challenges for the exploitation of automated planning in BPM.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the structural health monitoring (SHM) field, long-term continuous vibration-based monitoring is becoming increasingly popular as this could keep track of the health status of structures during their service lives. However, implementing such a system is not always feasible due to on-going conflicts between budget constraints and the need of sophisticated systems to monitor real-world structures under their demanding in-service conditions. To address this problem, this paper presents a comprehensive development of a cost-effective and flexible vibration DAQ system for long-term continuous SHM of a newly constructed institutional complex with a special focus on the main building. First, selections of sensor type and sensor positions are scrutinized to overcome adversities such as low-frequency and low-level vibration measurements. In order to economically tackle the sparse measurement problem, a cost-optimized Ethernet-based peripheral DAQ model is first adopted to form the system skeleton. A combination of a high-resolution timing coordination method based on the TCP/IP command communication medium and a periodic system resynchronization strategy is then proposed to synchronize data from multiple distributed DAQ units. The results of both experimental evaluations and experimental–numerical verifications show that the proposed DAQ system in general and the data synchronization solution in particular work well and they can provide a promising cost-effective and flexible alternative for use in real-world SHM projects. Finally, the paper demonstrates simple but effective ways to make use of the developed monitoring system for long-term continuous structural health evaluation as well as to use the instrumented building herein as a multi-purpose benchmark structure for studying not only practical SHM problems but also synchronization related issues.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Observing the working procedure of construction workers is an effective means of maintaining the safety performance of a construction project. It is also difficult to achieve due to a high worker-to-safety-officer ratio. There is an imminent need for the development of a tool to assist in the real-time monitoring of workers, in order to reduce the number of construction accidents. The development and application of a real time locating system (RTLS) based on the Chirp Spread Spectrum (CSS) technique is described in this paper for tracking the real-time position of workers on construction sites. Experiments and tests were carried out both on- and off-site to verify the accuracy of static and dynamic targets by the system, indicating an average error of within one metre. Experiments were also carried out to verify the ability of the system to identify workers’ unsafe behaviours. Wireless data transfer was used to simplify the deployment of the system. The system was deployed in a public residential construction project and proved to be quick and simple to use. The cost of the developed system is also reported to be reasonable (around 1800USD) in this study and is much cheaper than the cost of other RTLS. In addition, the CCS technique is shown to provide an economical solution with reasonable accuracy compared with other positioning systems, such as ultra wideband. The study verifies the potential of the CCS technique to provide an effective and economical aid in the improvement of safety management in the construction industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

My impression is that explicit data on the cost-effectiveness of different health care services are not valued highly by US policy makers. An example is a recent decision to approve ipilimumab for the treatment of metastatic melanoma. The extra health benefit over standard treatment is 2.1 months in previously untreated patients and the cost is $120,000 for 4 doses. This is poor value for money. Had $120,000 been allocated to an intensive lifestyle modification programme for diabetes risk (Diabet Med. 2004 Nov;21(11):1229-36) then 67 years of life or 800 months could have been returned. A massive increase in health benefits for the same costs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a novel path planning method for minimizing the energy consumption of an autonomous underwater vehicle subjected to time varying ocean disturbances and forecast model uncertainty. The algorithm determines 4-Dimensional path candidates using Nonlinear Robust Model Predictive Control (NRMPC) and solutions optimised using A*-like algorithms. Vehicle performance limits are incorporated into the algorithm with disturbances represented as spatial and temporally varying ocean currents with a bounded uncertainty in their predictions. The proposed algorithm is demonstrated through simulations using a 4-Dimensional, spatially distributed time-series predictive ocean current model. Results show the combined NRMPC and A* approach is capable of generating energy-efficient paths which are resistant to both dynamic disturbances and ocean model uncertainty.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose of this paper One way in which the tendering process can be further improved is by reviewing and clarifying the high costs that participants face during the course of the tendering phase. The study aims to provide project teams working in construction tender preparation a clear picture of what to expect when tendering for infrastructure projects. Design/methodology/approach Firstly, a review of current literature on tendering in infrastructure projects is conducted to identify the associated costs affecting traditional and PPP procurements as well as the potential measures contributing to tendering cost-reduction. A theoretical framework and its corresponding research hypotheses, which are based on the literature reviewed, are then proposed. An industry-wide questionnaire survey is currently under design to solicit industry practitioners’ views on tendering costs and the associated tendering cost-reduction measures. The data collected in the survey will subject to statistical analysis to test the proposed research hypotheses, which will be reported in a forthcoming paper. Findings and value The direct and indirect costs in public-private procurement have been identified and have been categorised into internal and external costs arising from working on tender submissions. A theoretical framework, mainly composed of five mechanisms of cost reduction, has been proposed and will be tested in a forthcoming industry-wide questionnaire survey. Originality/value of paper The findings are expected to lead to a transparent tendering process in infrastructure procurement, in which there is increased engagement from the private sector as well as an increase in competitive tendering.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This book represents a landmark effort to probe and analyze the theory and empirics of designing water disaster management policies. It consists of seven chapters that examine, in-depth and comprehensively, issues that are central to crafting effective policies for water disaster management. The authors use historical surveys, institutional analysis, econometric investigations, empirical case studies, and conceptual-theoretical discussions to clarify and illuminate the complex policy process. The specific topics studied in this book include a review and analysis of key policy areas and research priority areas associated with water disaster management, community participation in disaster risk reduction, the economics and politics of ‘green’ flood control, probabilistic flood forecasting for flood risk management, polycentric governance and flood risk management, drought management with the aid of dynamic inter-generational preferences, and how social resilience can inform SA/SIA for adaptive planning for climate change in vulnerable areas. A unique feature of this book is its analysis of the causes and consequences of water disasters and efforts to address them successfully through policy-rich, cross-disciplinary and transnational papers. This book is designed to help enrich the sparse discourse on water disaster management policies and galvanize water professionals to craft creative solutions to tackle water disasters efficiently, equitably, and sustainably. This book should also be of considerable use to disaster management professionals, in general, and natural resource policy analysts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The field of prognostics has attracted significant interest from the research community in recent times. Prognostics enables the prediction of failures in machines resulting in benefits to plant operators such as shorter downtimes, higher operation reliability, reduced operations and maintenance cost, and more effective maintenance and logistics planning. Prognostic systems have been successfully deployed for the monitoring of relatively simple rotating machines. However, machines and associated systems today are increasingly complex. As such, there is an urgent need to develop prognostic techniques for such complex systems operating in the real world. This review paper focuses on prognostic techniques that can be applied to rotating machinery operating under non-linear and non-stationary conditions. The general concept of these techniques, the pros and cons of applying these methods, as well as their applications in the research field are discussed. Finally, the opportunities and challenges in implementing prognostic systems and developing effective techniques for monitoring machines operating under non-stationary and non-linear conditions are also discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

For design-build (DB) projects, owners normally use lump sum and Guaranteed Maximum Price (GMP) as the major contract payment provisions. However, there was a lack of empirical studies to compare the project performance within different contract types and investigate how different project characteristics affect the owners’ selection of contract arrangement. Project information from Design-build Institute of America (DBIA) database was collected to reveal the statistical relationship between different project characteristics and contract types and to compare project performance between lump sum and GMP contract. The results show that lump sum is still the most frequently used contract method for DB projects, especially in the public sector. However, projects using GMP contract are more likely to have less schedule delay and cost overrun as compared to those with lump sum contract. The chi-square tests of cross tabulations reveal that project type, owner type, and procurement method affect the selection of contract types significantly. Civil infrastructure rather than industrial engineering project tends to use lump sum more frequently; and qualification-oriented contractor selection process resorts to GMP more often compared with cost-oriented process. The findings of this research contribute to the current body of knowledge concerning the effect of associated project characteristics on contract type selection. Overall, the results of this study provide empirical evidence from real DB projects that can be used by owners to select appropriate contract types and eventually improve future project performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 2005, Ginger Myles and Hongxia Jin proposed a software watermarking scheme based on converting jump instructions or unconditional branch statements (UBSs) by calls to a fingerprint branch function (FBF) that computes the correct target address of the UBS as a function of the generated fingerprint and integrity check. If the program is tampered with, the fingerprint and integrity checks change and the target address will not be computed correctly. In this paper, we present an attack based on tracking stack pointer modifications to break the scheme and provide implementation details. The key element of the attack is to remove the fingerprint and integrity check generating code from the program after disassociating the target address from the fingerprint and integrity value. Using the debugging tools that give vast control to the attacker to track stack pointer operations, we perform both subtractive and watermark replacement attacks. The major steps in the attack are automated resulting in a fast and low-cost attack.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Individuals with limb amputation fitted with conventional socket-suspended prostheses often experience socket related discomfort leading to a significant decrease in quality of life.[1-14] Most of these concerns can be overcome with osseointegration, a direct skeletal fixation method where the prosthetic componentry are directly attached to the fixation, resulting in the redundancy of the traditional socket system. There are two stages of osseointegration; Stage one, a titanium implant is inserted into the marrow space of residual limb bone and Stage two, a titanium extension is attached to the fixture. This surgical procedure is currently blooming worldwide, particularly within Queensland. Whilst providing improvements in quality of life, this new method also has potential to minimise the cost required for an amputee to ambulate during daily living. Thus, the aim of this project was to compare the differences in mean cost of services, cost of componentry and labour hours when using osseointegration compared to traditional socket-based prostheses. Data were extracted from Queensland Artificial Limb Services (QALS) database to determine cost of services, type of services and labour hours required to maintain a prosthetic limb. Five trans-femoral amputee male participants (age 46.4±10.1 yrs; height 175.4±16.3 cm; mass 83.8±14.0 kg; time since second stage 22.0± 8.1 mths) met inclusion criteria which was patient had to be more than 12 months post stage two osseointegration procedure. The socket and osseointegration prosthesis variables examined were the mean hours of labour, mean cost of services and mean cost of prosthetic componentry. Statistical analyses were conducted using an ANOVA. The results identified that there were only significant differences in the number of labour hours (p = 0.005) and cost of services (p = 0.021) when comparing the socket and osseointegration prosthetic type. These results identified that the cost of componentry were comparable between the two methods.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Housing price inflation is a national concern given the serious decline in the number of low and middle income households able to purchase housing. In addition housing supply lags well behind demand. In Melbourne, urban consolidation policies explicitly seek intensification to promote housing supply but planning regulation is often criticised for being a significant cost driver for medium density housing. It is assumed that easing supply constraints will improve affordability. We suggest that laissez-faire planning exacerbates affordability issues because this approach fails to address the basic economic problem: the current inability of the market to efficiently match supply and demand in order to progress an orderly and de-risked development process. The role of “exchange” one of the four housing market sub-systems identified by Burke (2012) has until recently generally been ignored but our examination reveals significant economic transaction costs that manifest as development risks that impact on affordability. Fortunately these can be mitigated, but only if there is a more consumer driven supply response.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background Haemodialysis (HD) nursing is characterised by frequent, intense interactions with patients over long periods of time resulting in a unique nurse-patient relationship. Due to the life-limiting nature of end-stage renal failure, nurses are likely to have repeated exposures to the death of patients with whom they have formed relationships. Repeated exposure to patient death translates into frequent grief experiences. There is scant literature on the psychological impact of patient death for nurses working in the HD setting. Aims To explore HD nurses experiences of patient death and coping mechanisms used. Methods A sequential mixed method study investigating job satisfaction, stress and burnout found that HD nurses had high levels of stress and burnout. These results were explored in more detail during 8 semi-structured interviews with HD nurses. Interviews were audio-recorded, transcribed verbatim and subjected to thematic analysis. Results Three themes were identified that highlight the stress experienced by nurses when a haemodialysis patient dies. The first theme, “quazi-family” describes the close relationship which forms between nurses and patients. The “complicated grief” theme outlines the impact of death on HD nurses, and the final theme, “remembrance” explains some of the coping mechanisms used in the grieving process. Conclusion Nurses develop individual coping mechanisms to accommodate the grief and loss experienced when a “close” patient dies. The grieving process caused by the death of patient’s needs to be recognised by nurses and nurse managers as causing psychological stress and strain.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose Individuals who experience stroke have a higher likelihood of subsequent stroke events, making it imperative to plan for future medical care. In the event of a further serious health event, engaging in the process of advanced care planning (ACP) can help family members and health care professionals (HCPs) make medical decisions for individuals who have lost the capacity to do so. Few studies have explored the views and experiences of patients with stroke about discussing their wishes and preferences for future medical events, and the extent to which stroke HCPs engage in conversations around planning for such events. In this study, we sought to understand how the process of ACP unfolded between HCPs and patients post-stroke. Patients and methods Using grounded theory (GT) methodology, we engaged in direct observation of HCP and patient interactions on an acute stroke unit and two stroke rehabilitation units. Using semi-structured interviews, 14 patients and four HCPs were interviewed directly about the ACP process. Results We found that open and continual ACP conversations were not taking place, patients experienced an apparent lack of urgency to engage in ACP, and HCPs were uncomfortable initiating ACP conversations due to the sensitive nature of the topic. Conclusion In this study, we identified lack of engagement in ACP post-stroke, attributable to patient and HCP factors. This encourages us to look further into the process of ACP in order to develop open communication between the patient with stroke, their families, and stroke HCPs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Lessbrook Pty Ltd (in liq) v Whap; Stephen; Bowie; Kepa & Kepa [2014] QCA 63 the Queensland Court of Appeal dealt with significant questions of general application relating to the appointment of assessors to conduct an assessment of costs under the Uniform Civil Procedure Rules 1999 (Qld) (UCPR).