884 resultados para city centre development, overcrowding, project management, site management, space


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Field experiments were conducted to quantify the natural levels of post-dispersal seed predation of arable weed species in spring barley and to identify the main groups of seed predators. Four arable weed species were investigated that were of high biodiversity value, yet of low to moderate competitive ability with the crop. These were Chenopodium album, Sinapis arvensis, Stellaria media and Polygonum aviculare. Exclusion treatments were used to allow selective access to dishes of seeds by different predator groups. Seed predation was highest early in the season, followed by a gradual decline in predation over the summer for all species. All species were taken by invertebrates. The activity of two phytophagous carabid genera showed significant correlations with seed predation levels. However, in general carabid activity was not related to seed predation and this is discussed in terms of the mainly polyphagous nature of many Carabid species that utilized the seed resource early in the season, but then switched to carnivory as prey populations increased. The potential relevance of post-dispersal seed predation to the development of weed management systems that maximize biological control through conservation and optimize herbicide use, is discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Field experiments were conducted to quantify the natural levels of post-dispersal seed predation of arable weed species in spring barley and to identify the main groups of seed predators. Four arable weed species were investigated that were of high biodiversity value, yet of low to moderate competitive ability with the crop. These were Chenopodium album, Sinapis arvensis, Stellaria media and Polygonum aviculare. Exclusion treatments were used to allow selective access to dishes of seeds by different predator groups. Seed predation was highest early in the season, followed by a gradual decline in predation over the summer for all species. All species were taken by invertebrates. The activity of two phytophagous carabid genera showed significant correlations with seed predation levels. However, in general carabid activity was not related to seed predation and this is discussed in terms of the mainly polyphagous nature of many Carabid species that utilized the seed resource early in the season, but then switched to carnivory as prey populations increased. The potential relevance of post-dispersal seed predation to the development of weed management systems that maximize biological control through conservation and optimize herbicide use, is discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper introduces the findings of a recent study on the use of information technology (IT) among the quantity surveying (QS) organisations in Hong Kong. The study was conducted through a structured questionnaire survey among 18 QS organisations registered in Hong Kong, representing around 53% of the total number of organisations in the profession. The data set generated from this study provided rich information about what information technology the QS profession used, what the perceived benefits and barriers experienced by the users in the industry were. The survey concluded that although IT had been widely used in QS organisations in Hong Kong, it is mainly used to support various individual tasks of the QS services at a basic level, rather than to streamline the production of QS services as a whole through automation. Most of the respondents agreed that IT plays an important role in the QS profession but they had not fully taken advantage of IT to improve their competitive edge in the market. They usually adopted a more passive “wait and see” approach. In addition, very few QS organisations in Hong Kong have a comprehensive policy in promoting the use of IT within the organisations. It is recommended that the QS profession must recognise the importance of IT and take appropriate actions to meet the challenges of ever-changing and competitive market place.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Identification of cost-determinant variables and evaluation of their degree of influence play an essential role in building reliable cost models and enhance the competitive edge of quantity surveyors as well as contracting organisations. Sixty-seven variables affecting pre-tender construction cost estimates are identified through literature and interviews. These factors are grouped into six categories and a comparison analysis of their impact is conducted. Priority ranking of cost-influencing factors is carried out using a questionnaire survey commissioned amongst quantity surveyors based in the UK. Findings of this survey indicate that there is a strong agreement between quantity surveyors in ranking cost-influencing factors of construction projects. Comparisons between the outcomes of this research and other related studies are presented.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project managers in the construction industry increasingly seek to learn from other industrial sectors. Knowledge sharing between different contexts is thus viewed as an essential source of competitive advantage. It is important therefore for project managers from all sectors to address and develop appropriate methods of knowledge sharing. However, too often it is assumed that knowledge freely exists and can be captured and shared between contexts. Such assumptions belie complexities and problems awaiting the unsuspecting knowledge-sharing protagonist. Knowledge per se is a problematic esoteric concept that does not lend itself easily to codification. Specifically tacit knowledge possessed by individuals, presents particular methodological issues for those considering harnessing its utility in return for competitive advantage. The notion that knowledge is also embedded in specific social contexts compounds this complexity. It is argued that knowledge is highly individualistic and concomitant with the various surrounding contexts within which it is shaped and enacted. Indeed, these contexts are also shaped as a consequence of knowledge adding further complexity to the problem domain. Current methods of knowledge capture, transfer and, sharing fall short of addressing these problematic issues. Research is presented that addresses these problems and proposes an alternative method of knowledge sharing. Drawing on data and observations collected from its application, the findings clearly demonstrate the crucial role of re-contextualisation, social interaction and dialectic debate in understanding knowledge sharing.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Gaining or maintaining a “contractor's” competitive advantage is not easy as it is determined by a large number of factors. Identification of critical success factors (CSFs) allows one to reduce the vast number of factors to some manageable few but vital ones. Based on the CSFs, contractors' limited resources such as money and manpower can be allocated and aligned appropriately for yielding a maximum outcome of overall competitiveness. This paper describes the CSFs identified from a survey study carried out in Mainland China. The ranking analysis of the survey results shows that 35 factors are rated as critical for determining the competitiveness of a contractor. Factor analysis reveals that the 35 CSFs identified can be grouped into eight clusters, namely, project management skills, organization structure, resources, competitive strategy, relationships, bidding, marketing, and technology. The CSFs in this study provide a vehicle for guiding a contractor in managing its resources in order to improve competitive advantage. The study also provides insights into the management of competitiveness for contractors that are operating in the particular context of the Chinese construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Little attention has been focussed on a precise definition and evaluation mechanism for project management risk specifically related to contractors. When bidding, contractors traditionally price risks using unsystematic approaches. The high business failure rate our industry records may indicate that the current unsystematic mechanisms contractors use for building up contingencies may be inadequate. The reluctance of some contractors to include a price for risk in their tenders when bidding for work competitively may also not be a useful approach. Here, instead, we first define the meaning of contractor contingency, and then we develop a facile quantitative technique that contractors can use to estimate a price for project risk. This model will help contractors analyse their exposure to project risks; and help them express the risk in monetary terms for management action. When bidding for work, they can decide how to allocate contingencies strategically in a way that balances risk and reward.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The principle aim of this research is to elucidate the factors driving the total rate of return of non-listed funds using a panel data analytical framework. In line with previous results, we find that core funds exhibit lower yet more stable returns than value-added and, in particular, opportunistic funds, both cross-sectionally and over time. After taking into account overall market exposure, as measured by weighted market returns, the excess returns of value-added and opportunity funds are likely to stem from: high leverage, high exposure to development, active asset management and investment in specialized property sectors. A random effects estimation of the panel data model largely confirms the findings obtained from the fixed effects model. Again, the country and sector property effect shows the strongest significance in explaining total returns. The stock market variable is negative which hints at switching effects between competing asset classes. For opportunity funds, on average, the returns attributable to gearing are three times higher than those for value added funds and over five times higher than for core funds. Overall, there is relatively strong evidence indicating that country and sector allocation, style, gearing and fund size combinations impact on the performance of unlisted real estate funds.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Industrial projects are often complex and burdened with time pressures and a lack of information. The term 'soft-project' used here stands for projects where the ‘what’ and/or the ‘how’ is uncertain, which is often the experience in projects involving software intensive systems developments. This thesis intertwines the disciplines of project management and requirements engineering in a goal-oriented application of the maxim ‘keep all objectives satisfied’. It thus proposes a method for appraising projects. In this method, a goal-oriented analysis establishes a framework with which expert judgements are collected so as to construct a confidence profile in regard to the feasibility and adequacy of the project's planned outputs. It is hoped that this appraisal method will contribute to the activities of project ‘shaping’ and aligning stakeholders’ expectations whilst helping project managers appreciate what parts of their project can be progressed and what parts should be held pending further analysis. This thesis offers the following original contribution: an appreciation of appraisal in the project context; a goal-oriented confidence profiling technique; and: a technique to produce goal-refinement diagrams – referred to as Goal Sketching. Collectively these amount to a method for the ‘Goal Refinement Appraisal of Soft-Projects’ (GRASP). The validity of the GRASP method is shown for two projects. In the first it is used for shaping a business investigation project. This is done in real-time in the project. The second case is a retrospective study of an enterprise IT project. This case tests the effectiveness of forecasting project difficulty from an initial confidence profile.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Multi-factor approaches to analysis of real estate returns have, since the pioneering work of Chan, Hendershott and Sanders (1990), emphasised a macro-variables approach in preference to the latent factor approach that formed the original basis of the arbitrage pricing theory. With increasing use of high frequency data and trading strategies and with a growing emphasis on the risks of extreme events, the macro-variable procedure has some deficiencies. This paper explores a third way, with the use of an alternative to the standard principal components approach – independent components analysis (ICA). ICA seeks higher moment independence and maximises in relation to a chosen risk parameter. We apply an ICA based on kurtosis maximisation to weekly US REIT data using a kurtosis maximising algorithm. The results show that ICA is successful in capturing the kurtosis characteristics of REIT returns, offering possibilities for the development of risk management strategies that are sensitive to extreme events and tail distributions.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction planning plays a fundamental role in construction project management that requires team working among planners from a diverse range of disciplines and in geographically dispersed working situations. Model-based four-dimensional (4D) computer-aided design (CAD) groupware, though considered a possible approach to supporting collaborative planning, is still short of effective collaborative mechanisms for teamwork due to methodological, technological and social challenges. Targeting this problem, this paper proposes a model-based groupware solution to enable a group of multidisciplinary planners to perform real-time collaborative 4D planning across the Internet. In the light of the interactive definition method, and its computer-supported collaborative work (CSCW) design analysis, the paper discusses the realization of interactive collaborative mechanisms from software architecture, application mode, and data exchange protocol. These mechanisms have been integrated into a groupware solution, which was validated by a planning team in a truly geographically dispersed condition. Analysis of the validation results revealed that the proposed solution is feasible for real-time collaborative 4D planning to gain a robust construction plan through collaborative teamwork. The realization of this solution triggers further considerations about its enhancement for wider groupware applications.