889 resultados para Wireless power transmission
Resumo:
This work presents a methodology to analyze electric power systems transient stability for first swing using a neural network based on adaptive resonance theory (ART) architecture, called Euclidean ARTMAP neural network. The ART architectures present plasticity and stability characteristics, which are very important for the training and to execute the analysis in a fast way. The Euclidean ARTMAP version provides more accurate and faster solutions, when compared to the fuzzy ARTMAP configuration. Three steps are necessary for the network working, training, analysis and continuous training. The training step requires much effort (processing) while the analysis is effectuated almost without computational effort. The proposed network allows approaching several topologies of the electric system at the same time; therefore it is an alternative for real time transient stability of electric power systems. To illustrate the proposed neural network an application is presented for a multi-machine electric power systems composed of 10 synchronous machines, 45 buses and 73 transmission lines. (C) 2010 Elsevier B.V. All rights reserved.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Continuation methods have been long used in P-V curve tracing due to their efficiency in the resolution of ill-conditioned cases, with close to singular Jacobian matrices, such as the maximum loading point of power systems. Several parameterization techniques have been proposed to avoid matrix singularity and successfully solve those cases. This paper presents a simple geometric parameterization technique to overcome the singularity of the Jacobian matrix by the addition of a line equations located at the plane determined by a bus voltage magnitude and the loading factor. This technique enlarges the set of voltage variables that can be used to whole P-V curve tracing, without ill-conditioning problems and no need of parameter changes. Simulation results, obtained for large realistic Brazilian and American power systems, show that the robustness and efficiency of the conventional power flow are not only preserved but also improved.
Resumo:
This work presents the application of the Decentralized Modal Control method for pole placement in multimachine power systems utilizing FACTS (Flexible AC Transmission Systems), STATCOM (Static Synchronous Compensator) and UPFC (Unified Power Flow Controller) devices. For this, these devices are equipped with supplementary damping controllers, denominated POD ( Power Oscillation Damping), achieving a coordinated project with local controllers (Power System Stabilizers - PSS). Comparative analysis on the function of damping of the FACTS, STATCOM and UPFC is performed using the New England System that has 10 generators, 39 buses and 46 transmission lines. (c) 2011 Elsevier Ltd. All rights reserved.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
A combinatorial mathematical model in tandem with a metaheuristic technique for solving transmission network expansion planning (TNEP) using an AC model associated with reactive power planning (RPP) is presented in this paper. AC-TNEP is handled through a prior DC model while additional lines as well as VAr-plants are used as reinforcements to cope with real network requirements. The solution of the reinforcement stage can be obtained by assuming all reactive demands are supplied locally to achieve a solution for AC-TNEP and by neglecting the local reactive sources, a reactive power planning (RPP) will be managed to find the minimum required reactive power sources. Binary GA as well as a real genetic algorithm (RCA) are employed as metaheuristic optimization techniques for solving this combinatorial TNEP as well as the RPP problem. High quality results related with lower investment costs through case studies on test systems show the usefulness of the proposal when working directly with the AC model in transmission network expansion planning, instead of relaxed models. (C) 2010 Elsevier B.V. All rights reserved.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
This article shows a transmission line model for simulation of fast and slow transients, applied to symmetrical or asymmetrical configurations. A transmission line model is developed based on lumped elements representation and state-space techniques. The proposed methodology represents a practical procedure to model three-phase transmission lines directly in time domain, without the explicit or implicit use of inverse transforms. In three-phase representation, analysis modal techniques are applied to decouple the phases in their respective propagation modes, using a correction procedure to set a real and constant matrix for untransposed lines with or without vertical symmetry plane. The proposed methodology takes into account the frequency-dependent parameters of the line and in order to include this effect in the state matrices, a fitting procedure is applied. To verify the accuracy of the proposed state-space model in frequency domain, a simple methodology is described based on line distributed parameters and transfer function associated with input/output signals of the lumped parameters representation. In addition, this article proposes the use of a fast and robust integration procedure to solve the state equations, enabling transient and steady-state simulations. The results obtained by the proposed methodology are compared with several established transmission line models in EMTP, taking into account an asymmetrical three-phase transmission line. The principal contribution of the proposed methodology is to handle a steady fundamental signal mixed with fast and slow transients, including impulsive and oscillatory behavior, by a practical procedure applied directly in time domain for symmetrical or asymmetrical representations. (C) 2011 Elsevier Ltd. All rights reserved.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
We present a bilevel model for transmission expansion planning within a market environment, where producers and consumers trade freely electric energy through a pool. The target of the transmission planner, modeled through the upper-level problem, is to minimize network investment cost while facilitating energy trading. This upper-level problem is constrained by a collection of lower-level market clearing problems representing pool trading, and whose individual objective functions correspond to social welfare. Using the duality theory the proposed bilevel model is recast as a mixed-integer linear programming problem, which is solvable using branch-and-cut solvers. Detailed results from an illustrative example and a case study are presented and discussed. Finally, some relevant conclusions are drawn.
Resumo:
Single real transformation matrices are tested as phase-mode transformation matrices of typical symmetrical systems with double three-phase and two parallel double three-phase transmission lines. These single real transformation matrices are achieved from eigenvector matrices of the mentioned systems and they are based on Clarke's matrix. Using linear combinations of the Clarke's matrix elements, the techniques applied to the single three-phase lines are extended to systems with 6 or 12 phase conductors. For transposed double three-phase lines, phase Z and Y matrices are changed into diagonal matrices in mode domain. Considering non-transposed cases of double three-phase lines, the results are not exact and the error analyses are performed using the exact eigenvalues. In case of two parallel double three-phase lines, the exact single real transformation matrix has not been obtained yet. Searching for this exact matrix, the analyses are based on a single homopolar reference. For all analyses in this paper, the homopolar mode is used as the only homopolar reference for all phase conductors of the studied system. (C) 2008 Elsevier B.V. All rights reserved.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
This article analyzes the electrical parameters of a 3-phase transmission line using a 280-m-high steel tower that has been proposed for the Amazon transmission system in Brazil. The height of the line conductors and the distance between them are intrinsically related to the longitudinal and transverse parameters of the line. Hence, an accurate study is carried out in order to show the electrical variations between a transmission line using the new technology and a conventional 3-phase 440-kV line, considering a wide range of frequencies and variable soil resistivity. First, a brief review of the fundamental theory of line parameters is presented. In addition, by using a digital line model, simulations are carried out in the time domain to analyze possible and critical over-voltage transients on the proposed line representation.