1000 resultados para Uk
Resumo:
As a consequence of increased levels of flooding, largely attributable to urbanization of watersheds (and perhaps climate change, more frequent extreme rainfall events are occurring and threatening existing critical infrastructure. Many of which are short-span bridges over relatively small waterways (e.g., small rivers, streams and canals). Whilst these short-span bridges were designed, often many years ago, to pass relatively minor the then standard return-period floods, in recenttimes the failure incidence of such short-span bridges has been noticeably increasing. This is suggestive of insufficient hydraulic capacity or alternative failure mechanism not envisaged at the time of design e.g. foundation scour or undermining. This paper presen ts, and draws lessons, from bridge failures in Ireland and the USA. For example, in November 2009, the UK and Ireland were subjected to extraordinarily severe weather conditions for several days. The resulting flooding led to the collapse of three UK bridges that were generally 19th century masonry arch bridges, withrelatively shallow foundations. Parallel failure events have been observed in the USA. To date, knowledge of the combined effect of waterway erosion, bridge submergence, and geotechnical collapse has not been adequately studied. Recent research carried out considered the hydraulic analysis of short span bridges under flood conditions, but no consideration was given towards the likely damage to these structures due to erosive coupling of hydraulic and geotechnical factors. Some work has been done to predict the discharge downstream of an inundated arch, focusing onpredicting afflux, as opposed to bridge scour, under both pressurized and free-surface flows, but no ! predictive equation for scour under pressurized conditions was ever considered. The case studies this paper presents will be augmented by the initial findings from the laboratory experiments investigating the effects of surcharged flow and subsequent scour within the vicinity of single span arch bridges. Velocities profiles will be shown within the vicinity of the arch, in addition to the depth of consequent scour, for a series of flows and model spans. The data will be presented and correlated to the most recent predictive equations for submerged contraction and abutment scour. The accuracy of these equations is examined, and the findings used as a basis for developing further studies in relation to short span bridges.
Resumo:
Purpose
– Utilising concepts drawn from the governmentality literature, the purpose of this paper is to examine the adoption of International Financial Reporting Standards (IFRSs) in the UK’s devolved administrations of Northern Ireland, Scotland and Wales in order to assess why they were adopted and how their introduction has been governed.
Design/methodology/approach
– This research applies a combination of three different approaches, namely: a content analysis; an anonymous online questionnaire; and semi-structured interviews.
Findings
– These include: the transition has had minimal impact upon policy setting and the information produced to aid budgeting and decision making; IFRSs are not entirely appropriate for the public sector; the time, cost and effort involved outweighed the benefits; public sector accounting has become overly-complicated; and the transition is not perceived as part of a wider privatisation programmeResearch limitations/implications
– As this study focuses upon the three UK devolved administrations, the findings may not be applicable in a wider setting.
Practical/implications
– Public sector change must be adequately resourced, carefully planned, with appropriate systems, trained staff and interdisciplinary project teams; accounting change should be based on value for money; and a single, coherent financial regime for the way in which government uses budgets, presents estimates to Parliament and publishes its resource accounts should be implemented.
Originality/value
– This study highlights that accounting change is not just a technical issue and, while it can facilitate a more business-like environment and enhance accountability, all those affected by the changes may not have the requisite skills to fully utilise the (new) information available.
Resumo:
Cadmium and lead were determined in fruit and vegetable produce (~1300 samples) collected from a field and market basket study of locally grown produce from the South-West of Britain (Devon and Cornwall). These were compared with similarly locally grown produce from the North-East of Britain (Aberdeenshire). The concentrations of cadmium and lead in the market basket produce were compared to the maximum levels (ML) set by the European Union (EU). For cadmium 0.2% of the samples exceeded the ML, and 0.6% of the samples exceeded the ML for lead. The location of cadmium and lead in potatoes was performed using laser ablation ICP-MS. All tested samples exhibited higher lead concentrations, and most exhibited increased concentrations of cadmium in the potato skin compared to the flesh. The concentrations of cadmium and lead found in fruits and vegetables sampled during this study do not increase concern about risk to human health.
Resumo:
This paper summarises the work done on the distribution and reactivity of organic contaminants (simazine, atrazine, lindane, fluoranthene, pyrene, PCB 77, PCB 118) in the Humber Estuary and associated major rivers, as part of the LOIS programme. The preliminary flux calculations show that the most important contributors of selected organic contaminants were the rivers Trent (45% of simazine, 20% of atrazine), Aire (30% of simazine and 33% of atrazine), Don (36 and 37% of fluoranthene and pyrene) and Ouse (18% of fluoranthene and pyrene). For lindane and PCBs, the Aire and Ouse were the key sources. The water flow in all the rivers shows strong seasonal variations, as do the contaminant concentrations. As a result, the mean daily fluxes of these contaminants displayed a strong seasonality. Annual mean concentrations of simazine and atrazine decreased by more than 50% over the period 1994-1995 in most of the rivers, probably as a result of their restricted use in the UK. Mass balance calculations show that the Humber is a sink for atrazine, lindane, PCB 77 and PCB 118, although the degree of removal is generally much lower for atrazine and lindane than for PCB 77 and PCB 118. Mass balance results also show that the Humber can either be a source of fluoranthene and pyrene (in the suspended particulate phase), or a sink (in the dissolved phase), although overall the Humber acts as sink. The budget exercise represents an attempt to quantify the input and output of selected organic contaminants from catchment to ocean. However, due to limited data and assumptions involved in calculations, the estimates should be considered as an order of magnitude approximation. Further improvement both in resolution and accuracy is required.
Resumo:
The UK government introduced the Private Finance Initiative (PFI) and, latterly, the Local Improvement Finance Trust (LIFT) in an attempt to improve public service provision. As a variant of PFI, LIFT seeks to create a framework for the effective provision of primary care facilities. Like conventional PFI procurement, LIFT projects involve long-term contracts, complex multi-party interactions and thus create various risks to public sector clients. This paper investigates the advantages and disadvantages of LIFT with a focus on how this approach facilitates or impedes risk management from the public sector client perspective. Our paper concludes that LIFT has a potential for creating additional problems, including the further reduction of public sector control, conflicts of interest, the inappropriate use of enabling funds, and higher than market rental costs affecting the uptake of space in the buildings by local health care providers. However, there is also evidence that LIFT has facilitated new investment and that Primary Care Trusts (PCTs) have themselves started addressing some of the weaknesses of this procurement format through the bundling of projects and other forms of regional co-operation.
Resumo:
During the past twenty years, the UK has relied heavily on Public Private Partnerships (PPP) and especially the Private Finance Initiative in the procurement of infrastructure and services. Discussing the causes of the credit crunch and its effects on PPP, this paper notes that the provision of new public sector infrastructure and related services has been adversely affected by the impact of the credit crunch on Private Finance Initiatives (PFIs). These problems have arisen primarily from the unwillingness of commercial banks to replace collapsed PFI bond financing unless new PFI contracts reduce financial risks; which, in turn, is likely to increase the cost of these projects to the public sector. Additional financial strains have arisen for the UK government from the need to bail out collapsed PFI projects. Overall we find evidence that the UK commitment to PFI has not only increased immediate fiscal pressures on the UK when these have become least palatable, but has also created fiscal vulnerabilities at local and national levels which are likely to hamper the country’s ability to launch counter-cyclical responses to the ongoing crisis.
Resumo:
During the past two decades the UK has played a leading position in the development and application of Public Private Partnership (PPP) based infrastructure procurement through its Private Finance Initiative model. This model had been developed during the last years of the Major Government and expanded during the early years of the Blair Government. The banking and economic crisis of 2007-09 has created major challenges to the use of PPP in the UK, making the sustainability of past levels of PPP investment and the future direction of PPP based infrastructure procurement in that country uncertain. This chapter summarises key developments in UK PPP up to the crisis; reviews the economic issues that have led up to the crisis; discusses the immediate impact of the crisis on the UK PFI and PPP market together with the transition arrangements that were put into to place by the Brown government; and, lastly, looks at recent initiatives taken by Cameron’s Conservative-Liberal Coalition Government under the designation of Private Finance 2 (PF2).