906 resultados para Project Management Maturity Model
Resumo:
Continuing Professional Development (CPD) is seen as a vital part of a professional engineer’s career, by professional engineering institutions as well as individual engineers. Factors such as ever-changing workforce requirements and rapid technological change have resulted in engineers no longer being able to rely just on the skills they learnt at university or can pick up on the job; they must undergo a structured professional development with clear objectives to develop further professional knowledge, values and skills. This paper presents a course developed for students undertaking a Master of Engineering or Master of Project Management at the University of Queensland. This course was specifically designed to help students plan their continuing professional development, while developing professional skills such as communication, ethical reasoning, critical judgement and the need for sustainable development. The course utilised a work integrated learning pedagogy applied within a formal learning environment, and followed the competency based chartered membership program of Engineers Australia, the peak professional body of engineers in Australia. The course was developed and analysed using an action learning approach. The main research question was “Can extra teaching and learning activities be developed that will simulate workplace learning?” The students continually assessed and reflected upon their current competencies, skills and abilities, and planed for the future attainment of specific competencies which they identified as important to their future careers. Various evaluation methods, including surveys before and after the course, were used to evaluate the action learning intervention. It was found that the assessment developed for the course was one of the most important factors, not only in driving student learning, as is widely accepted, but also in changing the students’ understandings and acceptance of the need for continuous professional development. The students also felt that the knowledge, values and skills they developed would be beneficial for their future careers, as they were developed within the context of their own professional development, rather than to just get through the course. © 2005, American Society for Engineering Education
Resumo:
As process management projects have increased in size due to globalised and company-wide initiatives, a corresponding growth in the size of process modeling projects can be observed. Despite advances in languages, tools and methodologies, several aspects of these projects have been largely ignored by the academic community. This paper makes a first contribution to a potential research agenda in this field by defining the characteristics of large-scale process modeling projects and proposing a framework of related issues. These issues are derived from a semi -structured interview and six focus groups conducted in Australia, Germany and the USA with enterprise and modeling software vendors and customers. The focus groups confirm the existence of unresolved problems in business process modeling projects. The outcomes provide a research agenda which directs researchers into further studies in global process management, process model decomposition and the overall governance of process modeling projects. It is expected that this research agenda will provide guidance to researchers and practitioners by focusing on areas of high theoretical and practical relevance.
Resumo:
As transformações e modificações ocorridas no mercado, nas políticas e na economia do Brasil possuem um histórico e um trajeto muitas vezes desconhecidos e pouco divulgados pelos meios responsáveis a este fim. A parceria em gestão entre o público e o privado tem estado cada vez mais presente nas sociedades onde o Estado tem adotado políticas de intervenção moderada. As políticas econômicas liberais, o insistente incentivo ao empreendedorismo e à livre iniciativa, os processos de desburocratização, as parcerias e acordos políticos levados à prática, constituem e formam as principais bases de sustentação do cenário econômico contemporâneo. Aliado a isto, a economia sob a égide estratégica da expansão contínua de riquezas tem produzido no Brasil a sondagem e aproveitamento de nichos de mercado, outrora despercebidos. Em decorrência destes fatos, observa-se nas últimas décadas um crescimento progressivo factual no setor de lazer e entretenimento, a partir do planejamento e criação de dezenas de organizações e empresas objetivando a exploração destas atividades. A contextualização do tema gestão em parceria se dará a partir do estudo e análise de uma experiência prática de gerenciamento em modelo de Permissão implementada no parque Cidade da Criança em São Bernardo do Campo, região do Grande ABC Paulista. Neste meio tempo, surge a chance de identificar padrões de ações gerenciais e formas de planejamento organizacional que sinalizem aspectos, características e capacidades que fundamentem a viabilidade funcional ou não desta parceria em cenário prático e real.
Resumo:
There are several studies on managing risks in information technology (IT) projects. Most of the studies identify and prioritise risks through empirical research in order to suggest mitigating measures. Although they are important to clients for future projects, these studies fail to provide any framework for risk management from IT developers' perspective. Although a few studies introduced a framework of risk management in IT projects, most of them are presented from clients' perspectives and very little effort has been made to integrate this with the project management cycle. As IT developers absorb a considerable amount of risk, an integrated framework for managing risks in IT projects from developers' perspective is needed in order to ensure success in IT projects. The main objective of the paper is to develop a risk management framework for IT projects from the developers' perspective. This study uses a combined qualitative and quantitative technique with the active involvement of stakeholders in order to identify, analyse and respond to risks. The entire methodology has been explained using a case study on an information technology project in a public sector organisation in Barbados.
Resumo:
Although the various tools and techniques of quality management are routinely deployed in order to improve healthcare quality, an integrated approach is lacking, which combines the customer focus to identify quality issues, analytical techniques for prioritising improvement measures and a project management approach to plan, implement and evaluate the improvement projects. This study develops an innovative framework using Quality Function Deployment (QFD) and a logical framework in order to address this issue, and demonstrates its effectiveness using a case study on the intensive care unit of a hospital.
Resumo:
Purpose – The purpose of this paper is to help managers to successfully plan, implement, and operate enterprise resource planning (ERP) projects using a risk management framework. Design/methodology/approach – This paper adopted a combined literature review and case study method. Using literature review, the paper first identified major issues of managing ERP projects and develops a risk management framework for managing those issues. The proposed risk management framework was then applied to a ERP implementation project of a UK-based energy services group and its effectiveness for managing ERP projects implementation had been demonstrated. Additionally, the risk factors as identified from the case application are compared with the risk factors from the previous researches so as to suggest mitigating measures. Findings – All the risk factors are categorized into planning, implementation and operations phases along with project processes, organizational transformation and information technology (IT) perspectives. Project implementation phase is the most vulnerable to failure. The case study results reveal that the effect of other projects on on-going ERP project, management of overall IT architecture and non-availability of resources for organizational transformation are most critical from likelihood and impact perspectives. Managing risk across various phases of project and equal emphasize to effective project management, organizational transformation and IT adoption are the key to success in ERP implementation. Practical implications – The risk factors, which were identified using literature review and the case study, have great significance as mitigating measures of those risks may result successful implementation of ERP projects in the industry. Additionally, proposed risk management framework could be customized to implement ERP projects elsewhere. Originality/value – ERP projects are risky as they are capital intensive, technically complex, and call for organizational transformation. There are both success and failure stories. However, both researchers and practitioners agree, that if it can be implemented and operated successfully and benefits should be achievable. Although there are many studies on ERP implementation, little has been discussed on managing risks of ERP projects. Therefore, this paper bridges the gap.
Resumo:
The process framework comprises three phases, as follows: scope the supply chain/network; identify the options for supply system architecture and select supply system architecture. It facilitates a structured approach that analyses the supply chain/network contextual characteristics, in order to ensure alignment with the appropriate supply system architecture. The process framework was derived from comprehensive literature review and archival case study analysis. The review led to the classification of supply system architectures according to their orientation, whether integrated; partially integrated; co-ordinated or independent. The classification was combined with the characteristics that influence the selection of supply system architecture to encapsulate the conceptual framework. It builds upon existing frameworks and methodologies by focusing on structured procedure; supporting project management; facilitating participation and clarifying point of entry. The process framework was initially tested in three case study applications from the food, automobile and hand tool industries. A variety of industrial settings was chosen to illustrate transferability. The case study applications indicate that the process framework is a valid approach to the problem; however, further testing is required. In particular, the use of group support system technologies to support the process and the steps involving the participation of software vendors need further testing. However, the process framework can be followed due to the clarity of its presentation. It considers the issue of timing by including alternative decision-making techniques, dependent on the constraints. It is useful for ensuring a sound business case is developed, with supporting documentation and analysis that identifies the strategic and functional requirements of supply system architecture.
Resumo:
In 2007 the UK Office of Government Commerce was mandated to carry out Procurement Capability Reviews (PCR) across the 16 top spending UK Government Departments. Since then, this programme has evolved into a self assessment based approach which is markedly different from the original approach. Will the move from a centre-led strategic review of procurement capability to a department-led model based on self assessment continue to strengthen and improve procurement capability across Central Civil Government? OGC is currently working with UK Government Departments to carry out their PCRs using a self-assessment tool which incorporates qualitative and quantitative measures. Results are generated based on a capability maturity model. The results are assured independently. OGC expectations are that tangible and measurable capability improvements will be realised when departments embed the self-assessment model and implement the findings as part of a continuous improvement regime. This paper is a case study, using some relevant literature to reflect on past and possible future development of the PCR self assessment scheme.
Resumo:
The purpose of this research has been to investigate the extent to which Lean techniques have been applied to indirect or White Collar activities within manufacturing operations. The work has been based on a systematic review of the literature and six UK based case studies. Both are described in the paper. The findings from this work include, for example, that there are few reports off the application of Lean in this context. The more substantive papers focus on NPI and Project Management, where as, Support and ‘Front Office’ activities are covered only briefly in ‘trade journal’ articles. These do demonstrate that Lean techniques can be applied successfully to non-production related activities, and there are significant opportunities for work in this area. However, the definition of Lean is evolving and practitioners do not share a common understanding of terminology. This may undermine their accuracy when reporting the application of Lean techniques.
Resumo:
Purpose – This paper reports the study of key success factors (KSFs) in the project management of the implementation of strategic manufacturing initiatives (SMIs). Design/methodology/approach – In order to gather the experience and knowledge of many industries, from different geographic locations, in a broad range of types and sizes of SMIs, a questionnaire-based survey of practitioners worldwide was selected as the most appropriate research method among those available. Findings – The identification of those tasks and activities that must be done well in order to succeed in the implementation of a SMI in practice. Practical implications – Practitioners focusing their attention on the KSFs identified are more likely to succeed. Once these factors have been identified, the value of benchmarking project management methodologies then comes from drawing attention to those tasks that are key to the success of the implementation of SMIs. Originality/value – The paper presents new thinking by bringing project management into the operations strategy implementation literature as an important mediating factor for success. In this context the factors that are required for successful implementation are identified.
Resumo:
World-wide efforts have been made to adopt BIM (Building Information Modelling) to improve the efficiency of construction project management processes lively. BIM means a shared digitized expression which provides a reliable source to make an informed decision over a physical or a functional character across all construction sectors including design, civil engineering and plant construction. The Korean Public Procurement Service mandates to use BIM for over 50 billion won public construction projects from 2012, and this will be extended to every project initiated by the Korean Public Procurement Service from 2016. This paper aims not only to investigate potential barriers which can be faced at the initial stage of BIM adoption, but also to explore possible solutions against them. For doing this, the BIM utilization strategies and action plans by US and UK public sectors which adopt BIM earlier than Korea were analysed. Based on the results of comparative analysis between US and UK, the proper guideline for BIM adoption in Korea will be suggested.