872 resultados para Plan de Ordenamiento


Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pre 1913 plan showing the Grand Central Hotel and Santorium Co. Ltd. on St. Paul Street, St. Catharines, Ont.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The original Master Plan of 1964 called for the campus to stretch out 1 1/4 miles across the escarpment with arts buildings west of the tower and science buildings to the east. This plan laid out the development of Brock for the next 10 or 11 years by which time enrollment was expected to be near 8000 students.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Master Plan Phase 2. Map of the original 1964 master plan showing the planned campus layout and distances from the centre of campus (ie. the Tower).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Master Plan Phase 2. This overhead map of the original 1964 Master Plan shows the planned campus layout along the escarpment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

1969-70 floor plan for the old Glenridge Campus located at Glenridge and Lockhart. For a more detailed copy, please contact the archives.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Municipalities that engage in recreation planning have the potential to use their resources more effectively. However, successful planning means getting the plan off the shelf and implemented. This study investigated the factors that influenced municipal recreation plan implementation in three municipalities. Interviews were conducted with eleven key informants (recreation directors, planning consultants, a city councillor, and members of plan steering committees). The findings of this study suggested that because the implementation of recreation plans occurs in a highly political environment, recreation professionals will need effective strategies to get their plans implemented and that implementation can be facilitated by developing or expanding strategies that: (l) build the power of the recreation department within the municipal government structure; (2) build support for recreation within the local community; and (3) build the political and organizational capacity in the recreation department.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

1 map :|bdigital, JPEG file

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Survey map and description of the land at the cut of the Chippewa or Welland River. Created by The Welland Canal Company. Included is a drawing of the land along with brief surveyors notes. Noteable features include; bridge, Welland River, road, Stone house, J. Cummings Esq. house, military line, military land, Old Fort, old military draw bridge. Surveyor notes are seen in pencil on the map.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Plan and profile of discharge tunnel along Niagara River. The horizontal scale is 1 inch = 100 feet, the vertical scale is 1 inch = 40 feet. The drawing is dated November 7, 1902.