891 resultados para Construction and demolition waste
Resumo:
An overview of organization in the construction industry is identified from plans of work published in the UK. This provides a basis for identifying the essential steps through which any construction project must pass. It is shown that all construction projects pass through a set of stages of work, consisting of inception, feasibility, scheme design, detail design, contract formation, construction and commissioning. Although there may be changes to the sequence and importance of these stages, their identification helps in making judgements about organizational structure on construction projects.
Resumo:
The purpose of this document is to provide a single source of reference for every paper published in the journals directly related to research in Construction Management. It is indexed by author and keyword and contains the titles, authors, abstracts and keywords of every article from the following journals: • Building Research and Information (BRI) • Construction Management and Economics (CME) • Engineering, Construction and Architectural Management (ECAM) • Journal of Construction Procurement (JCP) • RICS Research Papers (RICS) The index entries give short forms of the bibliographical citations, rather than page numbers, to enable annual updates to the abstracts. Each annual update will carry cumulative indexes, so that only one index needs to be consulted.
Resumo:
We have favoured the variational (secular equation) method for the determination of the (ro-) vibrational energy levels of polyatomic molecules. We use predominantly the Watson Hamiltonian in normal coordinates and an associated given potential in the variational code 'Multimode'. The dominant cost is the construction and diagonalization of matrices of ever-increasing size. Here we address this problem, using pertubation theory to select dominant expansion terms within the Davidson-Liu iterative diagonalization method. Our chosen example is the twelve-mode molecule methanol, for which we have an ab initio representation of the potential which includes the internal rotational motion of the OH group relative to CH3. Our new algorithm allows us to obtain converged energy levels for matrices of dimensions in excess of 100 000.
Resumo:
This paper aims to introduce a knowledge-based managemental prototype entitled Eþ for environmental-conscious construction relied on an integration of current environmental management tools in construction area. The overall objective of developing the Eþ prototype is to facilitate selectively reusing the retrievable knowledge in construction engineering and management areas assembled from previous projects for the best practice in environmental-conscious construction. The methodologies adopted in previous and ongoing research related to the development of the Eþ belong to the operations research area and the information technology area, including literature review, questionnaire survey and interview, statistical analysis, system analysis and development, experimental research and simulation, and so on. The content presented in this paper includes an advanced Eþ prototype, a comprehensive review of environmental management tools integrated to the Eþ prototype, and an experimental case study of the implementation of the Eþ prototype. It is expected that the adoption and implementation of the Eþ prototype can effectively facilitate contractors to improve their environmental performance in the lifecycle of projectbased construction and to reduce adverse environmental impacts due to the deployment of various engineering and management processes at each construction stage.
Resumo:
The overall significance of the construction and building services sector internationally cannot be overemphasised. In the UK, the industry currently accounts for 10% gross domestic product (GDP) and employs 2 million people, which is more than 1 in 14 of the total workforce. However, regardless of its output (approximately £65 billion annually) there has been a steady decline in the number of trade entrants into the construction and building services sector. Consequently, the available ‘pool of labour’ is inadequately resourced; productivity is low; the existing labour force is overstressed; there is an increase in site deaths; and a long-term labour shortage is envisaged. Today, the evidence seems to suggest that multiskilling is a tentative redress for ameliorating the skills crisis in the construction and building sectors. A 43-year time-series of data on 23 manpower attributes was evaluated as part of this investigation. The developed linear regression models show that the concept of multiskilling obeys the ‘law of diminishing returns'. That is, a weak relation was found between construction output and a three or more combination of manpower attributes. An optimisation model is prescribed for traditional trades.
Resumo:
Competitive Dialogue (CD) is a new contract award procedure of the European Community (EC). It is set out in Article 29 of the 'Public Sector Directive' 2004/18/EC. Over the last decades, projects were becoming more and more complex, and the existing EC procedures were no longer suitable to procure those projects. The call for a new procedure resulted in CD. This paper describes how the Directive has been implemented into the laws of two member states: the UK and the Netherlands. In order to implement the Directive, both lawmakers have set up a new and distinct piece of legislation. In each case, large parts of the Directive’s content have been repeated ‘word for word’; only minor parts have been reworded and/or restructured. In the next part of the paper, the CD procedure is examined in different respects. First, an overview is given on the different EC contract award procedures (open, restricted, negotiated, CD) and awarding methods (lowest price and Most Economically Advantageous Tender, MEAT). Second, the applicability of CD is described: Among other limitations, CD can only be applied to public contracts for works, supplies, and services, and this scope of application is further restricted by the exclusion of certain contract types. One such exclusion concerns services concessions. This means that PPP contracts which are set up as services concessions cannot be awarded by CD. The last two parts of the paper pertain to the main features of the CD procedure – from ‘contract notice’ to ‘contract award’ – and the advantages and disadvantages of the procedure. One advantage is that the dialogue allows the complexity of the project to be disentangled and clarified. Other advantages are the stimulation of innovation and creativity. These advantages are set against the procedure’s disadvantages, which include high transaction costs and a perceived hindrance of innovation (due to an ambiguity between transparency and fair competition). It is concluded that all advantages and disadvantages are related to one of three elements: communication, competition, and/or structure of the procedure. Further research is needed to find out how these elements are related.
Resumo:
In an attempt to focus clients' minds on the importance of considering the construction and maintenance costs of a commercial office building (both as a factor in staff productivity and as a fraction of lifetime staff costs) there is an often-quoted ratio of costs of 1:5:200, where for every one pound spent on construction cost, five are spent on maintenance and building operating costs and 200 on staffing and business operating costs. This seems to stem from a paper published by the Royal Academy of Engineering, in which no data is given and no derivation or defence of the ratio appears. The accompanying belief that higher quality design and construction increases staff productivity, and simultaneously reduces maintenance costs, how ever laudable, appears unsupported by research, and carries all the hallmarks of an "urban myth". In tracking down data about real buildings, a more realistic ratio appears to depend on a huge variety of variables, as well as the definition of the number of "lifetime" years. The ill-defined origins of the original ratio (1:5:200) describing these variables have made replication impossible. However, by using published sources of data, we have found that for three office buildings, a more realistic ratio is 1:0.4:12. As there is nothing in the public domain about what comprised the original research that gave rise to 1:5:200, it is not possible to make a true comparison between these new calculations and the originals. Clients and construction professionals stand to be misled because the popularity and widespread use of the wrong ratio appears to be mis-informing important investment and policy decisions.
Resumo:
This Information Paper is the third in a four-part series that looks at the lessons learnt from the BRE Innovation Park concerning compliance with the Code for Sustainable Homes published in November 2006. It focuses on water use, harvesting, recycling and drainage. The other parts deal with: building fabric; energy sources, overheating and ventilation; architecture, construction and sourcing.
Resumo:
Purpose-Unplanned changes in construction projects are common and lead to disruptive effects such as project delays, cost overruns and quality deviations. Rework due to unplanned changes can cost 10-15 per cent of contract value. By managing these changes more effectively, these disruptive effects can be minimised. Previous research has approached this problem from an information-processing view. In this knowledge age, the purpose of this paper is to argue that effective change management can be brought about by better understanding the significant role of knowledge during change situations. Design/methodology/approach - Within this knowledge-based context, the question of how construction project teams manage knowledge during unplanned change in the construction phase within collaborative team settings is investigated through a selected case study sample within the UK construction industry. Findings- Case study findings conclude that different forms of knowledge are created and shared between project team members during change events which is very much socially constructed and centred on tacit knowledge and experience of project personnel. Originality/value- Building on the case study findings the paper finally offers a model that represents the role of knowledge during managing project change.
Resumo:
Individuals with Williams syndrome (WS) demonstrate impaired visuo-spatial abilities in comparison to their level of verbal ability. In particular, visuo-spatial construction is an area of relative weakness. It has been hypothesised that poor or atypical location coding abilities contribute strongly to the impaired abilities observed on construction and drawing tasks [Farran, E. K., & Jarrold, C. (2005). Evidence for unusual spatial location coding in Williams syndrome: An explanation for the local bias in visuo-spatial construction tasks? Brain and Cognition, 59, 159-172; Hoffman, J. E., Landau, B., & Pagani, B. (2003). Spatial breakdown in spatial construction: Evidence from eye fixations in children with Williams syndrome. Cognitive Psychology, 46, 260-301]. The current experiment investigated location memory in WS. Specifically, the precision of remembered locations was measured as well as the biases and strategies that were involved in remembering those locations. A developmental trajectory approach was employed; WS performance was assessed relative to the performance of typically developing (TD) children ranging from 4- to 8-year-old. Results showed differential strategy use in the WS and TD groups. WS performance was most similar to the level of a TD 4-year-old and was additionally impaired by the addition of physical category boundaries. Despite their low level of ability, the WS group produced a pattern of biases in performance which pointed towards evidence of a subdivision effect, as observed in TD older children and adults. In contrast, the TD children showed a different pattern of biases, which appears to be explained by a normalisation strategy. In summary, individuals with WS do not process locations in a typical manner. This may have a negative impact on their visuo-spatial construction and drawing abilities. (c) 2007 Elsevier Ltd. All rights reserved.
Resumo:
This paper introduces a new neurofuzzy model construction and parameter estimation algorithm from observed finite data sets, based on a Takagi and Sugeno (T-S) inference mechanism and a new extended Gram-Schmidt orthogonal decomposition algorithm, for the modeling of a priori unknown dynamical systems in the form of a set of fuzzy rules. The first contribution of the paper is the introduction of a one to one mapping between a fuzzy rule-base and a model matrix feature subspace using the T-S inference mechanism. This link enables the numerical properties associated with a rule-based matrix subspace, the relationships amongst these matrix subspaces, and the correlation between the output vector and a rule-base matrix subspace, to be investigated and extracted as rule-based knowledge to enhance model transparency. The matrix subspace spanned by a fuzzy rule is initially derived as the input regression matrix multiplied by a weighting matrix that consists of the corresponding fuzzy membership functions over the training data set. Model transparency is explored by the derivation of an equivalence between an A-optimality experimental design criterion of the weighting matrix and the average model output sensitivity to the fuzzy rule, so that rule-bases can be effectively measured by their identifiability via the A-optimality experimental design criterion. The A-optimality experimental design criterion of the weighting matrices of fuzzy rules is used to construct an initial model rule-base. An extended Gram-Schmidt algorithm is then developed to estimate the parameter vector for each rule. This new algorithm decomposes the model rule-bases via an orthogonal subspace decomposition approach, so as to enhance model transparency with the capability of interpreting the derived rule-base energy level. This new approach is computationally simpler than the conventional Gram-Schmidt algorithm for resolving high dimensional regression problems, whereby it is computationally desirable to decompose complex models into a few submodels rather than a single model with large number of input variables and the associated curse of dimensionality problem. Numerical examples are included to demonstrate the effectiveness of the proposed new algorithm.
Resumo:
A case study on the tendering process and cost/time performance of a public building project in Ghana is conducted. Competitive bids submitted by five contractors for the project, in which contractors were required to prepare their own quantities, were analyzed to compare differences in their pricing levels and risk/requirement perceptions. Queries sent to the consultants at the tender stage were also analyzed to identify the significant areas of concern to contractors in relation to the tender documentation. The five bidding prices were significantly different. The queries submitted for clarifications were significantly different, although a few were similar. Using a before-and-after experiment, the expected cost/time estimate at the start of the project was compared to the actual cost/time values, i.e. what happened in the actual construction phase. The analysis showed that the project exceeded its expected cost by 18% and its planned time by 210%. Variations and inadequate design were the major reasons. Following an exploration of these issues, an alternative tendering mechanism is recommended to clients. A shift away from the conventional approach of awarding work based on price, and serious consideration of alternative procurement routes can help clients in Ghana obtain better value for money on their projects.
Resumo:
While there is a strong moral case for corporate social responsibility (CSR), the business case for CSR is certainly not irrefutable. A better understanding of how to integrate CSR into business strategy is needed but with ever increasing momentum towards sustainability as a business driver, it is often difficult to untangle the rhetoric from reality in the CSR debate. Through an analysis of eight case studies of leading firms from throughout the construction supply chain who claim to engage in CSR, we explore how consulting and contracting firms in the construction and engineering industries integrate CSR into their business strategy. Findings point to an inherent caution of moving beyond compliance and to a risk-averse culture which adopts very narrow definitions of success. We conclude that until this culture changes or the industry is forced by clients or regulation to change, the idea of CSR will continue to mean achieving economic measures of success, with ecological goals a second regulated priority and social goals a distant third.
Resumo:
The Private Finance Initiative (PFI) is frequently portrayed as a vehicle for change for the UK construction sector. Significant change in the working practices of construction companies is predicted as new business models based on whole-life value creation emerge. This paper shifts the focus of discussion from projected ideals and possible developments to the current situation. More specifically, it focuses on the challenges that large firms participating in both PFI and traditional markets face. The analysis focuses on the relations between business units and on day-to-day challenges to greater long-term commitment, through life-service provision and increased integration between construction and service provision. The paper offers insights into the effects of PFI on construction practice and their implications for theorizing on organizational and strategic change. It suggests abandoning a simplistic model of the centralized, homogenous firm and instead capturing the dynamics of decentralized, large firms working in multiple markets on a variety of projects. This would assist in the provision of more realistic and fruitful models of how to realize the PFI vision.