832 resultados para role-based access control
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
The effects of several doses of progesterone on FSH and LH concentrations were used to study the role of the gonadotropins on deviation in growth rates of the two largest follicles during the establishment of follicle dominance. Progesterone was given to pony mares at a daily dose rate of 0 mg (controls), 30 mg (low dose), 100 mg (intermediate dose), and 300 mg (high dose). All follicles ≥ 6 mm were ablated at Day 10 (Day 0 = ovulation) to initiate a new follicular wave; prostaglandin F(2α) was given to induce luteolysis, and progesterone was given from Days 10 to 24. The low dose did not significantly alter any of the ovarian or gonadotropin end points. The high dose reduced (P < 0.05) the ablation-induced FSH concentrations on Day 11. Maximum diameter of the largest follicle (17.2 ± 0.6 mm) and the second- largest follicle (15.5 ± 0.9 mm) in the high-dose group was less (P < 0.04) than the diameter of the second-largest follicle in the controls (20.0 ± 1.0 mm) at the beginning of deviation (Day 16.7 ± 0.4). Thus, the growth of the two largest follicles was reduced by the high dose, presumably through depression of FSH, so that the follicles did not attain a diameter characteristic of deviation in the controls. The intermediate dose did not affect FSH concentrations. However, the LH concentrations increased in the control, low, and intermediate groups, but then decreased (P < 0.05) in the intermediate group to pretreatment levels. The LH decrease in the intermediate group occurred 2 days before deviation in the controls. The maximum diameter of the largest follicle was less (P < 0.0001) in the intermediate group (27.3 ± 1.8 mm) than in the controls (38.9 ± 1.5 mm), but the maximum diameter of the second-largest follicle was not different between the two groups (19.0 ± 1.1 vs. 20.3 ± 1.0 mm). Thus, the onset of deviation, as assessed by the second-largest follicle, was not delayed by the decrease in LH. Diameter of the largest follicle by Day 18 in the intermediate group (23.1 ± 1.6 mm) was less (P < 0.05) than in the controls (28.0 ± 1.0 mm). These results suggest that circulating LH was not involved in the initiation of dominance (inhibition of other follicles by the largest follicle) but was required for the continued growth of the largest follicle after or concurrently with its initial expression of dominance.
Resumo:
The Brazilian Network for Continuous Monitoring of GPS - RBMC, since its foundation in December of 1996, has been playing an essential role for the maintenance and user access of the fundamental geodetic frame in the country,. It provides users with a direct link to the Brazilian Geodetic System - SGB. Its role has become more relevant with the increasing use of space navigation technology in the country. Recently, Brazil adopted a new geodetic system, SIRGAS2000, in February 2005, fully compatible with GNSS technology. The paper provides an overview of the recent modernization phases the RBMC network has undergone highlighting its future steps. From its current post-mission mode, the RBMC will evolve into a real-time network, providing real-time data and real-time correction to users. The network enhanced with modern GPS receivers and the addition of atomic clocks will be used to compute WADGPS-type corrections to be transmitted, in real time, to users in Brazil and surrounding areas. It is estimated that users will be able to achieve a horizontal accuracy around 0.5 m (1σ) in static and kinematic positioning and better for dual frequency users. The availability of the WADGPS service will allow users to tie to the new SIRGAS2000 system in a more rapid and transparent way for positioning and navigation applications. It should be emphasized that support to post-mission static positioning will continue to be provided to users interested in higher accuracy levels. In addition to this, a post-mission Precise Point Positioning (PPP) service will be provided based on the one currently provided by the Geodetic Survey Division of NRCan (CSRS-PPP). The modernization of the RBMC is under development based on a cooperation signed at the end of 2004 with the University of New Brunswick, supported by the Canadian International Development Agency and the Brazilian Cooperation Agency. The Geodetic Survey Division of NRCan is also participating in this modernization effort under the same project.
Resumo:
The Brazilian Network for Continuous Monitoring of GPS - RBMC, since its foundation in December of 1996, has been playing an essential role for the maintenance and user access of the fundamental geodetic frame in the country. It provides to users a direct link to the Brazilian Geodetic System. Its role has become more relevant with the increasing use of space navigation technology in the country. Recently, Brazil adopted a new geodetic frame, SIRGAS2000, in February 2005, fully compatible with GNSS technology. The paper provides an overview of the recent modernization phases the RBMC network has undergone highlighting its future steps. From its current post-mission mode, the RBMC will evolve into a real-time network, providing real-time data and real-time correction to users. The network enhanced with modern GPS receivers and the addition of atomic clocks will be used to compute WADGPS-type corrections to be transmitted, in real time, to users in Brazil and surrounding areas. It is estimated that users will be able to achieve a horizontal accuracy around 0.5 m (1 σ) in static and kinematic positioning and better for dual frequency users. The availability of the WADGPS service will allow users to tie to the new SIRGAS2000 frame in a more rapid and transparent way for positioning and navigation applications. It should be emphasized that support to post-mission static positioning, will continue to be provided to users interested in higher accuracy levels. In addition to this, a post-mission Precise Point Positioning (PPP) service will be provided based on the one currently provided by the Geodetic Survey Division of NRCan (CSRS-PPP). The modernization of the RBMC is under development based on a cooperation signed at the end of 2004 with the University of New Brunswick, supported by the Canadian International Development Agency and the Brazilian Cooperation Agency. The Geodetic Survey Division of NRCan is also participating in this modernization effort under the same project. © Springer-Verlag Berlin Heidelberg 2009.
Resumo:
The Brazilian Network for Continuous Monitoring of GNSS - RBMC is a national network of continuously operating reference GNSS stations. Since its establishment in December of 1996, it has been playing an essential role for the maintenance and user access of the fundamental geodetic frame in the country. In order to provide better services for RBMC, the Brazilian Institute of Geography and Statistics - IBGE and the National Institute of Colonization and Land Reform - INCRA are both partners involved in the National Geospatial Framework Project - PIGN. This paper provides an overview of the recent modernization phases the RBMC network has undergone highlighting its future steps. These steps involve the installation of new equipment, provide real time data from a group of core stations and compute real-time DGPS corrections, based on CDGPS (The real-time Canada-Wide DGPS Service) (The Real-Time Canada-Wide DGPS Service. http://www.cdgps.com/ 2009a). In addition to this, a post-mission Precise Point Positioning (PPP) service has been established based on the current Geodetic Survey Division of NRCan (CSRS-PPP) service. This service is operational since April 2009 and is in large use in the country. All activities mentioned before are based on a cooperation signed at the end of 2004 with the University of New Brunswick, supported by the Canadian International Development Agency and the Brazilian Cooperation Agency. The Geodetic Survey Division of NRCan is also participating in this modernization effort under the same project. This infrastructure of 66 GNSS stations, the real time, post processing services and the potentiality of providing Wide Area DGPS corrections in the future show that the RBMC system is comparable to those available in USA and Europe. © Springer-Verlag Berlin Heidelberg 2012.
Resumo:
Objective: This study aimed to analyze and compare the role of a water-based exercise program versus a combination of water and callisthenic exercises on postural control, functional independence, and freezing of gait (FOG) in patients with mild to moderate Parkinson disease.Methods: Twenty-five community-dwelling participants with idiopathic Parkinson disease were recruited. Of these, 9 participants took part in a water-based program of physical exercises and the other 16 participants took part in a combined program that consisted of callisthenic exercises plus an aquatic exercise session. Both programs were 16 weeks in duration. The clinical evaluation assessed the festination by means of the FOG score test; postural control was verified by means of the balance test of the short physical performance battery, and the Spanish validated version of the Unified Parkinson's Disease Rating Scale part 2 was used to assess functional independence. Participants were evaluated before and after 16 weeks of both proposed programs.Results: The results showed improvement in FOG for both groups, although a significant main effect was observed only in the patients who performed the callisthenic exercise plus an aquatic exercise program. Postural control did not show significant improvements after both proposed physical exercise programs as soon as functional autonomy. Our preliminary results suggest that training sessions with the combination of water plus callisthenic exercises may be a useful physical rehabilitation strategy for individuals with mild to moderate Parkinson disease who have FOG.