997 resultados para hospital projects
Resumo:
Objective: To determine the pooled effect of exposure to one of 11 specialist palliative care teams providing services in patients’ homes.Design: Pooled analysis of a retrospective cohort study.Setting: Ontario, Canada.Participants: 3109 patients who received care from specialist palliative care teams in 2009-11 (exposed) matched by propensity score to 3109 patients who received usual care (unexposed).Intervention: The palliative care teams studied served different geographies and varied in team composition and size but had the same core team members and role: a core group of palliative care physicians, nurses, and family physicians who provide integrated palliative care to patients in their homes. The teams’ role was to manage symptoms, provide education and care, coordinate services, and be available without interruption regardless of time or day.Main outcome measures: Patients (a) being in hospital in the last two weeks of life; (b) having an emergency department visit in the last two weeks of life; or (c) dying in hospital.Results: In both exposed and unexposed groups, about 80% had cancer and 78% received end of life homecare services for the same average duration. Across all palliative care teams, 970 (31.2%) of the exposed group were in hospital and 896 (28.9%) had an emergency department visit in the last two weeks of life respectively, compared with 1219 (39.3%) and 1070 (34.5%) of the unexposed group (P<0.001). The pooled relative risks of being in hospital and having an emergency department visit in late life comparing exposed versus unexposed were 0.68 (95% confidence interval 0.61 to 0.76) and 0.77 (0.69 to 0.86) respectively. Fewer exposed than unexposed patients died in hospital (503 (16.2%) v 887 (28.6%), P<0.001), and the pooled relative risk of dying in hospital was 0.46 (0.40 to 0.52).Conclusions: Community based specialist palliative care teams, despite variation in team composition and geographies, were effective at reducing acute care use and hospital deaths at the end of life.
Resumo:
The cycle of the academic year impacts on efforts to refine and improve major group design-build-test (DBT) projects since the time to run and evaluate projects is generally a full calendar year. By definition these major projects have a high degree of complexity since they act as the vehicle for the application of a range of technical knowledge and skills. There is also often an extensive list of desired learning outcomes which extends to include professional skills and attributes such as communication and team working. It is contended that student project definition and operation, like any other designed product, requires a number of iterations to achieve optimisation. The problem however is that if this cycle takes four or more years then by the time a project’s operational structure is fine tuned it is quite possible that the project theme is no longer relevant. The majority of the students will also inevitably experience a sub-optimal project experience over the 5 year development period. It would be much better if the ratio were flipped so that in 1 year an optimised project definition could be achieved which had sufficient longevity that it could run in the same efficient manner for 4 further years. An increased number of parallel investigators would also enable more varied and adventurous project concepts to be examined than a single institution could undertake alone in the same time frame.
This work-in-progress paper describes a parallel processing methodology for the accelerated definition of new student DBT project concepts. This methodology has been devised and implemented by a number of CDIO partner institutions in the UK & Ireland region. An agreed project theme was operated in parallel in one academic year with the objective of replacing a multi-year iterative cycle. Additionally the close collaboration and peer learning derived from the interaction between the coordinating academics facilitated the development of faculty teaching skills in line with CDIO standard 10.
Resumo:
The purpose of this research is to identify and assess the opportunities and challenges of implementing a Site Waste Management Plan (SWMP) on projects irrespective of size. In the UK, construction and demolition waste accounts for a third of all UK waste. There are a number of factors that influence the implementation of SWMPs. In order to identify and analyse these factors, 4 unstructured interviews were carried out and a sample of 56 participants completed a questionnaire survey. The scope of the study was limited to UK
construction industry professionals. The analysis revealed that more needs to be done if the industry is to meet government targets of reduction in construction related waste going to landfill. In addition, although SWMP may not yet be legally required on all construction projects, clients and contractors need to realise
the benefits to cut costs and implement best practice by adopting a SWMP. The benefits of implementing a SWMP will not only help to achieve this but also gain significant cost savings on projects and is also extremely beneficial to the environment. This study presents evidence that contractors need to do more to reduce waste and draws a clear link between waste reduction and the implementation of SWMPs. The findings are useful in the ongoing efforts to encourage the industry to find smarter, more efficient and less
damaging ways to operate
Resumo:
Risk management in software engineering has become a recognized project management practice but it seems that not all companies are systematically applying it. At the same time, agile methods have become popular, partly because proponents claim that agile methods implicitly reduce risks due
to, for example, more frequent and earlier feedback, shorter periods of development time and easier prediction of cost. Therefore, there is a need to investigate how risk management can be usable in iterative and evolutionary software development processes. This paper investigates the gathering of empirical data on risk management from the project environment and presents
a novel approach to manage risk in agile projects. Our approach is based on a prototype tool, Agile Risk Tool (ART). This tool reduces human effort in risk management by using software agents to identify, assess and monitor risk, based on input and data collected from the project environment and by applying
some designated rules. As validation, groups of student project data were used to provide evidence of the efficacy of this approach. We demonstrate the approach and the feasibility of using a lightweight risk management tool to alert, assess and monitor risk with reduced human effort.
Resumo:
Prior research on NGO accountability argued that in the process of upward accountability to donors NGOs’ accountability towards beneficiaries had been compromised. With a focus on beneficiary accountability this paper undertakes a comparative examination of a donor funded project and a non-donor funded project. The study has been carried out in the context of a large Bangladeshi NGO with international operations. While the above conclusion on NGO accountability generally holds our study shows a somewhat different picture. Drawing on a comprehensive set of empirical evidence from various sources such as documentary analysis, interviews, focus groups and observations we show that beneficiary accountability can be better in donor funded projects as compared to non-donor funded projects. We theorise the circumstances under which it can happen. This finding has significant implications for the policy makers and donors in the context of recent drive for the self-sustainability of NGOs and its impact on the crucial issue of beneficiary accountability.
Resumo:
This article examines hospital provision in Ireland during the early twentieth century. It examines attempts by the newly independent Irish Free State to reform and de-stigmatise medical relief in former workhouse infirmaries. Such reforms were designed to move away from nineteenth century welfare regimes which were underpinned by principles of deterrence. The reform initiated in independent Ireland - the first attempted break-up of the New Poor Law in Great Britain or Ireland - was partly successful. Many of the newly named County and District Hospitals provided solely for medical cases and managed to dissociate such health care provision from the relief of poverty. However, some hospitals continued to act as multifunctional institutions and provided for various categories including the sick, the aged and infirm, 'unmarried mothers' and 'harmless lunatics'. Such institutions often remained associated with the relief of poverty. This article also examines patient fee-payment and outlines how fresh terms of entitlement and means-testing were established. Such developments were even more pronounced in voluntary hospitals where the majority of patients made a financial contribution to their treatment. The article argues that the ability to pay at times determined the type of provision, either voluntary or rate-aided, available to the sick. However, it concludes that the clinical condition of patients often determined whether they entered a more prestigious voluntary hospital or the former workhouse. Although this article concentrates on two Irish case studies, County Kerry and Cork City; it is conceptualised within wider developments with particular reference to the British context.
Resumo:
The aim of this article is to consider the value of qualitative research to inform nurse education and policy for the hospitalized child and young person (CYP). The theoretical issues and tensions inherent in qualitative research with children and young people’s nursing are presented in conjunction with a discussion and analysis of how the epistemological and ontological concepts underpin and guide research. It is then followed by an exploration of their influence on enabling nurses to understand the CYP’s perspective, before finally leading to an analysis of the impact on the development of policy and research.