890 resultados para dinuclear system model
Resumo:
Readily accepted knowledge regarding crash causation is consistently omitted from efforts to model and subsequently understand motor vehicle crash occurrence and their contributing factors. For instance, distracted and impaired driving accounts for a significant proportion of crash occurrence, yet is rarely modeled explicitly. In addition, spatially allocated influences such as local law enforcement efforts, proximity to bars and schools, and roadside chronic distractions (advertising, pedestrians, etc.) play a role in contributing to crash occurrence and yet are routinely absent from crash models. By and large, these well-established omitted effects are simply assumed to contribute to model error, with predominant focus on modeling the engineering and operational effects of transportation facilities (e.g. AADT, number of lanes, speed limits, width of lanes, etc.) The typical analytical approach—with a variety of statistical enhancements—has been to model crashes that occur at system locations as negative binomial (NB) distributed events that arise from a singular, underlying crash generating process. These models and their statistical kin dominate the literature; however, it is argued in this paper that these models fail to capture the underlying complexity of motor vehicle crash causes, and thus thwart deeper insights regarding crash causation and prevention. This paper first describes hypothetical scenarios that collectively illustrate why current models mislead highway safety researchers and engineers. It is argued that current model shortcomings are significant, and will lead to poor decision-making. Exploiting our current state of knowledge of crash causation, crash counts are postulated to arise from three processes: observed network features, unobserved spatial effects, and ‘apparent’ random influences that reflect largely behavioral influences of drivers. It is argued; furthermore, that these three processes in theory can be modeled separately to gain deeper insight into crash causes, and that the model represents a more realistic depiction of reality than the state of practice NB regression. An admittedly imperfect empirical model that mixes three independent crash occurrence processes is shown to outperform the classical NB model. The questioning of current modeling assumptions and implications of the latent mixture model to current practice are the most important contributions of this paper, with an initial but rather vulnerable attempt to model the latent mixtures as a secondary contribution.
Resumo:
Capacity probability models of generating units are commonly used in many power system reliability studies, at hierarchical level one (HLI). Analytical modelling of a generating system with many units or generating units with many derated states in a system, can result in an extensive number of states in the capacity model. Limitations on available memory and computational time of present computer facilities can pose difficulties for assessment of such systems in many studies. A cluster procedure using the nearest centroid sorting method was used for IEEE-RTS load model. The application proved to be very effective in producing a highly similar model with substantially fewer states. This paper presents an extended application of the clustering method to include capacity probability representation. A series of sensitivity studies are illustrated using IEEE-RTS generating system and load models. The loss of load and energy expectations (LOLE, LOEE), are used as indicators to evaluate the application
Resumo:
The advanced programmatic risk analysis and management model (APRAM) is one of the recently developed methods that can be used for risk analysis and management purposes considering schedule, cost, and quality risks simultaneously. However, this model considers those failure risks that occur only over the design and construction phases of a project’s life cycle. While it can be sufficient for some projects for which the required cost during the operating life is much less than the budget required over the construction period, it should be modified in relation to infrastructure projects because the associated costs during the operating life cycle are significant. In this paper, a modified APRAM is proposed, which can consider potential risks that might occur over the entire life cycle of the project, including technical and managerial failure risks. Therefore, the modified model can be used as an efficient decision-support tool for construction managers in the housing industry in which various alternatives might be technically available. The modified method is demonstrated by using a real building project, and this demonstration shows that it can be employed efficiently by construction managers. The Delphi method was applied in order to figure out the failure events and their associated probabilities. The results show that although the initial cost of a cold-formed steel structural system is higher than a conventional construction system, the former’s failure cost is much lower than the latter’s
Resumo:
Waste management and minimisation is considered to be an important issue for achieving sustainability in the construction industry. Retrofit projects generate less waste than demolitions and new builds, but they possess unique features and require waste management approaches that are different to traditional new builds. With the increasing demand for more energy efficient and environmentally sustainable office spaces, the office building retrofit market is growing in capital cities around Australia with a high level of refurbishment needed for existing aging properties. Restricted site space and uncertain delivery process in these projects make it a major challenge to manage waste effectively. The labour-intensive nature of retrofit projects creates the need for the involvement of small and medium enterprises (SMEs) as subcontractors in on-site works. SMEs are familiar with on-site waste generation but are not as actively motivated and engaged in waste management activities as the stakeholders in other construction projects in the industry. SMEs’ responsibilities for waste management in office building retrofit projects need to be identified and adapted to the work delivery processes and the waste management system supported by project stakeholders. The existing literature provides an understanding of how to manage construction waste that is already generated and how to increase the waste recovery rate for office building retrofit projects. However, previous research has not developed theories or practical solutions that can guide project stakeholders to understand the specific waste generation process and effectively plan for and manage waste in ongoing project works. No appropriate method has been established for the potential role and capability of SMEs to manage and minimise waste from their subcontracting works. This research probes into the characteristics of office building retrofit project delivery with the aim to develop specific tools to manage waste and incorporate SMEs in this process in an appropriate and effective way. Based on an extensive literature review, the research firstly developed a questionnaire survey to identify the critical factors of on-site waste generation in office building retrofit projects. Semi-structured interviews were then utilised to validate the critical waste factors and establish the interrelationships between the factors. The interviews served another important function of identifying the current problems of waste management in the industry and the performance of SMEs in this area. Interviewees’ opinions on remedies to the problems were also collected. On the foundation of the findings from the questionnaire survey and semi-structured interviews, two waste planning and management strategies were identified for the dismantling phase and fit-out phase of office building retrofit projects, respectively. Two models were then established to organize SMEs’ waste management activities, including a work process-based integrated waste planning model for the dismantling phase and a system dynamics model for the fit-out phase. In order to apply the models in real practice, procedures were developed to guide SMEs’ work flow in on-site waste planning and management. In addition, a collaboration framework was established for SMEs and other project stakeholders for effective waste planning and management. Furthermore, an organisational engagement strategy was developed to improve SME waste management practices. Three case studies were conducted to validate and finalise the research deliverables. This research extends the current literature that mostly covers waste management plans in new build projects, by presenting the knowledge and understanding of addressing waste problems in retrofit projects. It provides practical tools and guidance for industry practitioners to effectively manage the waste generation processes in office building retrofit projects. It can also promote industry-level recognition of the role of SMEs and their performance in on-site waste management.
Resumo:
Power system restoration after a large area outage involves many factors, and the procedure is usually very complicated. A decision-making support system could then be developed so as to find the optimal black-start strategy. In order to evaluate candidate black-start strategies, some indices, usually both qualitative and quantitative, are employed. However, it may not be possible to directly synthesize these indices, and different extents of interactions may exist among these indices. In the existing black-start decision-making methods, qualitative and quantitative indices cannot be well synthesized, and the interactions among different indices are not taken into account. The vague set, an extended version of the well-developed fuzzy set, could be employed to deal with decision-making problems with interacting attributes. Given this background, the vague set is first employed in this work to represent the indices for facilitating the comparisons among them. Then, a concept of the vague-valued fuzzy measure is presented, and on that basis a mathematical model for black-start decision-making developed. Compared with the existing methods, the proposed method could deal with the interactions among indices and more reasonably represent the fuzzy information. Finally, an actual power system is served for demonstrating the basic features of the developed model and method.
Resumo:
Shadow nations face particular problems in constructing competitive film industries. Shadow nations refer to nations whose relative competitiveness suffers from easy product substitutability by products initiated, produced and distributed by powerful actors, such as media conglomerates located in Hollywood. The dominant literature has so far neglected the developing policy recommendations for dealing explicitly with the challenges of shadow nations. This paper aims to develop and apply a normative model for the development of film industries in shadow nations. The model integrates insights from innovation system studies and place branding. The developed model is applied to the Australian film industry as Australia represents a typical shadow nation within the film industry.
Resumo:
Power system operation and planning are facing increasing uncertainties especially with the deregulation process and increasing demand for power. Probabilistic power system stability assessment and probabilistic power system planning have been identified by EPRI as one of the important trends in power system operations and planning. Probabilistic small signal stability assessment studies the impact of system parameter uncertainties on system small disturbance stability characteristics. Researches in this area have covered many uncertainties factors such as controller parameter uncertainties and generation uncertainties. One of the most important factors in power system stability assessment is load dynamics. In this paper, composite load model is used to consider the uncertainties from load parameter uncertainties impact on system small signal stability characteristics. The results provide useful insight into the significant stability impact brought to the system by load dynamics. They can be used to help system operators in system operation and planning analysis.
Resumo:
This paper focuses on the implementation of the TS (Tagaki-Sugino) fuzzy controller for the active power and the DC capacitor voltage control of the Doubly Fed Induction Generator (DFIG) based wind generator. DFIG system is represented by a third-order model where electromagnetic transients of the stator are neglected. The effectiveness of the TS-fuzzy controller on the rotor speed oscillations and the DC capacitor voltage variations of the DFIG damping controller on converter ratings of the DFIG system is also investigated. The results of the time domain simulation studies are presented to elucidate the effectiveness of the TS-fuzzy controller compared with conventional PI controller in the DFIG system. The proposed TS-fuzzy controller can improve the fault ride through capability of DFIG compared to the conventional PI controller
Resumo:
Recent advances in the planning and delivery of radiotherapy treatments have resulted in improvements in the accuracy and precision with which therapeutic radiation can be administered. As the complexity of the treatments increases it becomes more difficult to predict the dose distribution in the patient accurately. Monte Carlo methods have the potential to improve the accuracy of the dose calculations and are increasingly being recognised as the “gold standard” for predicting dose deposition in the patient. In this study, software has been developed that enables the transfer of treatment plan information from the treatment planning system to a Monte Carlo dose calculation engine. A database of commissioned linear accelerator models (Elekta Precise and Varian 2100CD at various energies) has been developed using the EGSnrc/BEAMnrc Monte Carlo suite. Planned beam descriptions and CT images can be exported from the treatment planning system using the DICOM framework. The information in these files is combined with an appropriate linear accelerator model to allow the accurate calculation of the radiation field incident on a modelled patient geometry. The Monte Carlo dose calculation results are combined according to the monitor units specified in the exported plan. The result is a 3D dose distribution that could be used to verify treatment planning system calculations. The software, MCDTK (Monte Carlo Dicom ToolKit), has been developed in the Java programming language and produces BEAMnrc and DOSXYZnrc input files, ready for submission on a high-performance computing cluster. The code has been tested with the Eclipse (Varian Medical Systems), Oncentra MasterPlan (Nucletron B.V.) and Pinnacle3 (Philips Medical Systems) planning systems. In this study the software was validated against measurements in homogenous and heterogeneous phantoms. Monte Carlo models are commissioned through comparison with quality assurance measurements made using a large square field incident on a homogenous volume of water. This study aims to provide a valuable confirmation that Monte Carlo calculations match experimental measurements for complex fields and heterogeneous media.
Resumo:
RatSLAM is a navigation system based on the neural processes underlying navigation in the rodent brain, capable of operating with low resolution monocular image data. Seminal experiments using RatSLAM include mapping an entire suburb with a web camera and a long term robot delivery trial. This paper describes OpenRatSLAM, an open-source version of RatSLAM with bindings to the Robot Operating System framework to leverage advantages such as robot and sensor abstraction, networking, data playback, and visualization. OpenRatSLAM comprises connected ROS nodes to represent RatSLAM’s pose cells, experience map, and local view cells, as well as a fourth node that provides visual odometry estimates. The nodes are described with reference to the RatSLAM model and salient details of the ROS implementation such as topics, messages, parameters, class diagrams, sequence diagrams, and parameter tuning strategies. The performance of the system is demonstrated on three publicly available open-source datasets.
Resumo:
In recent years, some models have been proposed for the fault section estimation and state identification of unobserved protective relays (FSE-SIUPR) under the condition of incomplete state information of protective relays. In these models, the temporal alarm information from a faulted power system is not well explored although it is very helpful in compensating the incomplete state information of protective relays, quickly achieving definite fault diagnosis results and evaluating the operating status of protective relays and circuit breakers in complicated fault scenarios. In order to solve this problem, an integrated optimization mathematical model for the FSE-SIUPR, which takes full advantage of the temporal characteristics of alarm messages, is developed in the framework of the well-established temporal constraint network. With this model, the fault evolution procedure can be explained and some states of unobserved protective relays identified. The model is then solved by means of the Tabu search (TS) and finally verified by test results of fault scenarios in a practical power system.
Resumo:
Model-based testing (MBT) relies on models of a system under test and/or its environment to derive test cases for the system. This paper discusses the process of MBT and defines a taxonomy that covers the key aspects of MBT approaches. It is intended to help with understanding the characteristics, similarities and differences of those approaches, and with classifying the approach used in a particular MBT tool. To illustrate the taxonomy, a description of how three different examples of MBT tools fit into the taxonomy is provided.
Resumo:
Organizations from every industry sector seek to enhance their business performance and competitiveness through the deployment of contemporary information systems (IS), such as Enterprise Systems (ERP). Investments in ERP are complex and costly, attracting scrutiny and pressure to justify their cost. Thus, IS researchers highlight the need for systematic evaluation of information system success, or impact, which has resulted in the introduction of varied models for evaluating information systems. One of these systematic measurement approaches is the IS-Impact Model introduced by a team of researchers at Queensland University of technology (QUT) (Gable, Sedera, & Chan, 2008). The IS-Impact Model is conceptualized as a formative, multidimensional index that consists of four dimensions. Gable et al. (2008) define IS-Impact as "a measure at a point in time, of the stream of net benefits from the IS, to date and anticipated, as perceived by all key-user-groups" (p.381). The IT Evaluation Research Program (ITE-Program) at QUT has grown the IS-Impact Research Track with the central goal of conducting further studies to enhance and extend the IS-Impact Model. The overall goal of the IS-Impact research track at QUT is "to develop the most widely employed model for benchmarking information systems in organizations for the joint benefit of both research and practice" (Gable, 2009). In order to achieve that, the IS-Impact research track advocates programmatic research having the principles of tenacity, holism, and generalizability through extension research strategies. This study was conducted within the IS-Impact Research Track, to further generalize the IS-Impact Model by extending it to the Saudi Arabian context. According to Hofsted (2012), the national culture of Saudi Arabia is significantly different from the Australian national culture making the Saudi Arabian culture an interesting context for testing the external validity of the IS-Impact Model. The study re-visits the IS-Impact Model from the ground up. Rather than assume the existing instrument is valid in the new context, or simply assess its validity through quantitative data collection, the study takes a qualitative, inductive approach to re-assessing the necessity and completeness of existing dimensions and measures. This is done in two phases: Exploratory Phase and Confirmatory Phase. The exploratory phase addresses the first research question of the study "Is the IS-Impact Model complete and able to capture the impact of information systems in Saudi Arabian Organization?". The content analysis, used to analyze the Identification Survey data, indicated that 2 of the 37 measures of the IS-Impact Model are not applicable for the Saudi Arabian Context. Moreover, no new measures or dimensions were identified, evidencing the completeness and content validity of the IS-Impact Model. In addition, the Identification Survey data suggested several concepts related to IS-Impact, the most prominent of which was "Computer Network Quality" (CNQ). The literature supported the existence of a theoretical link between IS-Impact and CNQ (CNQ is viewed as an antecedent of IS-Impact). With the primary goal of validating the IS-Impact model within its extended nomological network, CNQ was introduced to the research model. The Confirmatory Phase addresses the second research question of the study "Is the Extended IS-Impact Model Valid as a Hierarchical Multidimensional Formative Measurement Model?". The objective of the Confirmatory Phase was to test the validity of IS-Impact Model and CNQ Model. To achieve that, IS-Impact, CNQ, and IS-Satisfaction were operationalized in a survey instrument, and then the research model was assessed by employing the Partial Least Squares (PLS) approach. The CNQ model was validated as a formative model. Similarly, the IS-Impact Model was validated as a hierarchical multidimensional formative construct. However, the analysis indicated that one of the IS-Impact Model indicators was insignificant and can be removed from the model. Thus, the resulting Extended IS-Impact Model consists of 4 dimensions and 34 measures. Finally, the structural model was also assessed against two aspects: explanatory and predictive power. The analysis revealed that the path coefficient between CNQ and IS-Impact is significant with t-value= (4.826) and relatively strong with â = (0.426) with CNQ explaining 18% of the variance in IS-Impact. These results supported the hypothesis that CNQ is antecedent of IS-Impact. The study demonstrates that the quality of Computer Network affects the quality of the Enterprise System (ERP) and consequently the impacts of the system. Therefore, practitioners should pay attention to the Computer Network quality. Similarly, the path coefficient between IS-Impact and IS-Satisfaction was significant t-value = (17.79) and strong â = (0.744), with IS-Impact alone explaining 55% of the variance in Satisfaction, consistent with results of the original IS-Impact study (Gable et al., 2008). The research contributions include: (a) supporting the completeness and validity of IS-Impact Model as a Hierarchical Multi-dimensional Formative Measurement Model in the Saudi Arabian context, (b) operationalizing Computer Network Quality as conceptualized in the ITU-T Recommendation E.800 (ITU-T, 1993), (c) validating CNQ as a formative measurement model and as an antecedent of IS Impact, and (d) conceptualizing and validating IS-Satisfaction as a reflective measurement model and as an immediate consequence of IS Impact. The CNQ model provides a framework to perceptually measure Computer Network Quality from multiple perspectives. The CNQ model features an easy-to-understand, easy-to-use, and economical survey instrument.
Resumo:
A number of security models have been proposed for RFID systems. Recent studies show that current models tend to be limited in the number of properties they capture. Consequently, models are commonly unable to distinguish between protocols with regard to finer privacy properties. This paper proposes a privacy model that introduces previously unavailable expressions of privacy. Based on the well-studied notion of indistinguishability, the model also strives to be simpler, easier to use, and more intuitive compared to previous models.
Resumo:
An energy storage system (ESS) can provide ancillary services such as frequency regulation and reserves, as well as smooth the fluctuations of wind power outputs, and hence improve the security and economics of the power system concerned. The combined operation of a wind farm and an ESS has become a widely accepted operating mode. Hence, it appears necessary to consider this operating mode in transmission system expansion planning, and this is an issue to be systematically addressed in this work. Firstly, the relationship between the cost of the NaS based ESS and its discharging cycle life is analyzed. A strategy for the combined operation of a wind farm and an ESS is next presented, so as to have a good compromise between the operating cost of the ESS and the smoothing effect of the fluctuation of wind power outputs. Then, a transmission system expansion planning model is developed with the sum of the transmission investment costs, the investment and operating costs of ESSs and the punishment cost of lost wind energy as the objective function to be minimized. An improved particle swarm optimization algorithm is employed to solve the developed planning model. Finally, the essential features of the developed model and adopted algorithm are demonstrated by 18-bus and 46-bus test systems.