828 resultados para construction of imaginaries
Resumo:
Behaviour of two embedded piles subjected to passive loading due to construction of an embankment was modelled in this paper. The piles were installed at the berm section of an embankment in a later stage of its construction. The investigation was carried out using a combination of two- and three-dimensional analyses. The analysis results were compared with the field-measured values and they agreed well.
Resumo:
Taking a Media Anthropology’s approach to dynamics of mediated selfrepresentation in migratory contexts, this thesis starts by mapping radio initiatives produced by, for and/or with migrants in Portugal. To further explore dynamics of support of initial settlement in the country, community-making, cultural reproduction, and transnational connectivity - found both in the mapping stage and the minority media literature (e.g. Kosnick, 2007; Rigoni & Saitta, 2012; Silverstone & Georgiou, 2005) - a case study was selected: the station awarded with the first bilingual license in Portugal. The station in question caters largely to the British population presenting themselves as “expats” and residing in the Algarve. The ethnographic strategy to research it consisted of “following the radio” (Marcus, 1995) beyond the station and into the events and establishments it announces on air, so as to relate production and consumption realms. The leading research question asks how does locally produced radio play into “expats” processes of management of cultural identity – and what are the specificities of its role? Drawing on conceptualizations of lifestyle migration (Benson & O’Reilly, 2009), production of locality (Appadurai 1996) and the public sphere (Butsch, 2007; Calhoun & et al, 1992; Dahlgren, 2006), this thesis contributes to valuing radio as a productive gateway to research migrants’ construction of belonging, to inscribe a counterpoint in the field of minority media, and to debate conceptualizations of migratory categories and flows. Specifically, this thesis argues that the station fulfills similar roles to other minority radio initiatives but in ways that are specific to the population being catered to. Namely, unlike other minority stations, radio facilitates the process of transitioning between categories along on a continuum linking tourists and migrants. It also reflects and participates in strategies of reterritorialization that rest on functional and partial modes of incorporation. While contributing to sustain a translocality (Appadurai, 1996) it indexes and fosters a stance of connection that is symbolically and materially connected to the UK and other “neighborhoods” but is, simultaneously, oriented to engaging with the Algarve as “home”. Yet, besides reifying a British cultural identity, radio’s oral, repetitive and ephemeral discourse particularly trivializes the reproduction of an ambivalent stance of connection with place that is shared by other “expats”. This dynamic is related to migratory projects driven by social imaginaries fostered by international media that stimulate the search for idealized ways of living, which the radio associates with the Algarve. While recurrently localizing and validating the narrative projecting an idealized “good life”, radio amplifies dynamics among migrants that seem to reaffirm the migratory move as a good choice.
Resumo:
Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.