979 resultados para UASB reactors
Resumo:
"July 1957."
Resumo:
Work performed at the Physics Division, Oak Ridge National Laboratory, Oak Ridge, Tennessee.
Resumo:
"Reactors - Power (TID-4500, 13th Edition)."
Resumo:
"TID-5327; Engineering."
Resumo:
"Work done under AEC Contract: AT911-1)-GEN-8."
Resumo:
"Covering work by M. Macomber, W.W. West, J.G. Carroll, and R.O. Bolt."
Resumo:
"August 1960."
Resumo:
"April 1961."
Resumo:
AEC Report No. TID-6506 Pt. 1, 2nd ed.
Resumo:
"Prepared by the Civilian Reactors, Evaluations and Planning Branch, Division of Reactor Development and Consultants."
Resumo:
Cummulative indexes issued.
Resumo:
"Metals, Ceramics, and Materials (TID-4500, 41st Ed.)."
Resumo:
Shipping list number: 2011-0290-P (pt. 1), 2011-0295-P (pt. 2), 2011-0289-P (pt. 3), 2011-0325-P (pt. 4), 2012-0066-P (pt. 5), 2012-0308-P (pt. 6), 2012-0320-P (pt. 7), 2012-0014-P (pt. 8), 2011-0356-P (pt. 9).
Resumo:
"Contract No. AT-(40-1)-2483, U. S. Atomic Energy Commission."
Resumo:
"May 1, 1962."