972 resultados para RESTORATION
Resumo:
In this paper are described the results of a research project that had the objective of developing construction procedures for restoring load transfer in existing jointed concrete pavements and of evaluating the effectiveness of the restoration methods. A total of 28 test sections with various load transfer devices were placed. The devices include split pipe, figure eight, vee, double vee, and dowel bars. Patching materials used on the project included three types of fast-setting grouts, three brands of polymer concrete, and plain portland cement concrete. The number and spacing of the devices and dowel bars were also variables in the project. Dowel bars and double vee devices were used on the major portion of the project. Performance evaluations were based on deflection tests conducted with a 20,000-lb axle load. Horizontal joint movement measurements and visual observations were also made. The short-term performance data indicate good results with the dowel bar installations regardless of patching materials. The sections with split pipe, figure eight, and vee devices failed in bond during the first winter cycle. The results with the double vee sections indicate the importance of the patching material to the success or failure of the load transfer system: some sections are performing well and other sections are performing poorly with double vee devices. Horizontal joint movement measurements indicate that neither the dowel bars nor the double vee devices are restricting joint movement.
Resumo:
Trench maintenance problems are caused by improper backfill placement and construction procedures. This report is part of a multiphase research project that aims to improve long-term performance of utility cut restoration trenches. The goal of this research is to improve pavement patch life and reduce maintenance of the repaired areas. The objectives were to use field-testing data, laboratory-testing data, and long-term monitoring (elevation survey and falling weight deflectometer testing) to suggest and modify recommendations from Phase I and to identify the principles of trench subsurface settlement and load distribution in utility cut restoration areas by using instrumented trenches. The objectives were accomplished by monitoring local agency utility construction from Phase I, constructing and monitoring the recommended trenches from Phase I, and instrumenting trenches to monitor changes in temperature, pressure, moisture content, and settlement as a function of time to determine the influences of seasonal changes on the utility cut performance.
Resumo:
Erythropoietin (rHuEPO) has proven to be effective in the treatment of anemia of chronic renal failure (CRF). Despite improving the quality of life, peak oxygen uptake after rHuEPO therapy is not improved as much as the increase in hemoglobin concentration ([Hb)] would predict. We hypothesized that this discrepancy is due to failure of O2 transport rates to rise in a manner proportional to [Hb]. To test this, eight patients with CRF undergoing regular hemodialysis were studied pre- and post-rHuEPO ([Hb] = 7.5 +/- 1.0 vs. 12.5 +/- 1.0 g x dl-1) using a standard incremental cycle exercise protocol. A group of 12 healthy sedentary subjects of similar age and anthropometric characteristics served as controls. Arterial and femoral venous blood gas data were obtained and coupled with simultaneous measurements of femoral venous blood flow (Qleg) by thermodilution to obtain O2 delivery and oxygen uptake (VO2). Despite a 68% increase in [Hb], peak VO2 increased by only 33%. This could be explained largely by reduced peak leg blood flow, limiting the gain in O2 delivery to 37%. At peak VO2, after rHuEPO, O2 supply limitation of maximal VO2 was found to occur, permitting the calculation of a value for muscle O2 conductance from capillary to mitochondria (DO2). While DO2 was slightly improved after rHuEPO, it was only 67% of that of sedentary control subjects. This kept maximal oxygen extraction at only 70%. Two important conclusions can be reached from this study. First, the increase in [Hb] produced by rHuEPO is accompanied by a significant reduction in peak blood flow to exercising muscle, which limits the gain in oxygen transport. Second, even after restoration of [Hb], O2 conductance from the muscle capillary to the mitochondria remains considerably below normal.
Resumo:
This article presents a modification of intraoperative external fixation for mandibular reconstruction with free tissue flaps. This technique is indicated when preregistration of the reconstruction plate is not possible due to transmandibular tumor extension. Once standard external fixation has been carried out and prior to segmental mandibulectomy, additional pins are fixed to the connecting rod that delineate the mandibular contour in three-dimensional (3D) space. Following mandibulectomy, these pins allow accurate contouring of the reconstruction plate and improved restoration of mandibular contour, projection, and dental occlusion. A step-by-step description of the technique using models and intraoperative photos is presented. This method of mandibular reconstruction is a simple and time-effective alternative to intraoperative computer navigation and 3D modeling in select cases of oral carcinoma where tumor infiltration of the outer mandibular cortex precludes prebending of the reconstruction plates.
Resumo:
The objective of this study was to obtain female inbred lines from sunflower (Helianthus annuus) hybrids. A methodology based on altering inbred lines carrying the fertility restorer gene (Rf) obtained from self pollinating hybrids into inbred lines with normal cytoplasm without the Rf gene was described. Further, derived male-sterile inbred lines were developed. The methodology was successfully used to obtain female inbreds from sunflower commercial hybrids. Although more time and labor consuming than the conventional female inbred line extraction methods, this methodology is advantageous in exploiting superior germplasms (commercial hybrids), which prompted us to develop practical procedures to allow its routinely use.
Resumo:
Postprint (published version)
Resumo:
OBJECTIVES: The aim of this systematic review is to evaluate, analysing the dental literature, whether: * Patients on intravenous (IV) or oral bisphosphonates (BPs) can receive oral implant therapy and what could be the risk of developing bisphosphonate-related osteonecrosis of the jaw (BRONJ)? * Osseointegrated implants could be affected by BP therapy. MATERIAL AND METHODS: A Medline search was conducted and all publications fulfilling the inclusion and exclusion criteria from 1966 until December 2008 were included in the review. Moreover, the Cochrane Data Base of Systematic Reviews, and the Cochrane Central Register of Controlled Trials and EMBASE (from 1980 to December 2008) were searched for English-language articles published between 1966 and 2008. Literature search was completed by a hand research accessing the references cited in all identified publications. RESULTS: The literature search rendered only one prospective and three retrospective studies. The prospective controlled non-randomized clinical study followed patients with and without BP medication up to 36 months after implant therapy. The patients in the experimental group had been on oral BPs before implant therapy for periods ranging between 1 and 4 years. None of the patients developed BRONJ and implant outcome was not affected by the BP medication. The three selected retrospective studies (two case-controls and one case series) yielded very similar results. All have followed patients on oral BPs after implant therapy, with follow-up ranging between 2 and 4 years. BRONJ was never reported and implant survival rates ranged between 95% and 100%. The literature search on BRONJ including guidelines and recommendations found 59 papers, from which six were retrieved. Among the guidelines, there is a consensus on contraindicating implants in cancer patients under IV-BPs and not contraindicating dental implants in patients under oral-BPs for osteoporosis. CONCLUSIONS: From the analysis of the one prospective and the three retrospective series (217 patients), the placement of an implant may be considered a safe procedure in patients taking oral BPs for <5 years with regard to the occurrence of BRONJ since in these studies no BRONJ has been reported. Moreover, the intake of oral-BPs did not influence short-term (1-4 years) implant survival rates.
Resumo:
The objective of this work was to investigate the relationship between changes in the plant community and changes in soil physical properties and water availability, during a succession from alfalfa (Medicago sativa L.) to natural vegetation on the Loess Plateau, China. Data from a succession sere spanning 32 years were collated, and vegetative indexes were compared to changes related to soil bulk density and soil water storage. The alfalfa yield increased for approximately 7 years, then it declined and the alfalfa was replaced by a natural community dominated by Stipa bungeana that began to thrive about 10 years after alfalfa seeding. Soil bulk density increased over time, but the deterioration of the alfalfa was mainly ascribed to a severe reduction in soil water storage, which was lowest around the time when degradation commenced. The results indicated that water consumption by alfalfa could be reduced by reducing plant density. The analysis of the data also suggested that soil water recharge could be facilitated by rotating the alfalfa with other crops, natural vegetation, or bare soil.
Resumo:
BACKGROUND/AIM: We have reported that neonatal treatment with monosodium L-glutamate (MSG), which causes damage to the arcuate nucleus, leads to severe hyperleptinemia and reduced adrenal leptin receptor (ob-Rb) expression in adulthood. As a result, rats given MSG neonatally display corticoadrenal leptin-resistance, a defect that is overridden by normalization of corticoadrenal hyperfunction. The aim of the present study was to determine whether negative energy conditions could correct corticoadrenal cell dysfunction in rats given MSG neonatally. METHODS: Normal (CTR) and MSG-treated female rats were subjected to food removal for 1-5 days, or prolonged (24-61 days) food restriction (FR). Plasma levels of several biomarkers and in vitro corticoadrenal function were evaluated following starvation or FR. RESULTS: Fasting for 1-5 days reduced plasma leptin levels in CTR and MSG rats, compared to levels in the respective groups fed ad libitum(p < 0.05), but adrenal leptin-resistance was unchanged. With prolonged FR, isolated adrenal cells from MSG rats became sensitive to leptin, which lowered ACTH-induced glucocorticoid release. This restoration of leptin response was associated with normalization of adrenal ob-Rb gene expression. CONCLUSION: Dietary restriction in some leptin-resistant obese phenotypes may normalize adrenocortical function.
Resumo:
Silver Lake is located in an 18,053-acre watershed. The watershed is intensively farmed with almost all of the wetlands being previously drained or degraded over the last 50 years. Silver Lake is listed on the State of Iowa’s impaired water bodies list due to sediment and high nutrient level. Silver Lake is also known be in the bottom 25 percentile of Iowa’s lakes due Secchi disk readings and Chlorophyll a level. Farming in the watershed is the principle concern and cause for many of the problems occurring in Silver Lake currently with 78% of the watershed being intensively farmed. There are two major drainage ditches that have been used to drain the major wetlands and sloughs that, at one time, filtered the water and slowed it down before it reached Silver Lake. With these two major drainage ditches, water is able to reach the lake much faster and unfiltered than it once did historically. The loss of 255 restorable wetland basins to row crop production has caused serious problems in Silver Lake. These wetland basins once slowed and filtered water as it moved through the watershed. With their loss over the last 50 years that traditional drainage no longer occurs. We propose to create a Wetland Reserve Program incentive project to make WRP a more attractive option to landowners within the watershed. The incentive will be based on the amount of sediment delivery reduction to the lake, therefore paying a greater payment for a greater benefit to the lake. The expected result of this project is the restoration of over 250 acres of wetland basins with an associated 650 acres of upland buffers. The benefit for these wetlands and buffers would be reduced sediment, reduced nutrients, and slowed waters to the lake.
Resumo:
The Central Park Lake Watershed Assessment and Management Plan identified four categories where improvements are needed to remove the 23 acre lake from the impaired waters list. These include the wastewater system, runoff from surrounding lands, in-lake nutrient re-suspension and runoff from hard surfaces within the park. The lake is currently impaired for bacteria, algae and pH. Through outcomes of the Watershed Assessment and Management Plan, this proposal includes for abandonment and reclamation of the single cell wastewater lagoon site, replacement with three conventional septic systems and construction of two wetlands. One of the wetlands is located on the same site as the reclaimed lagoon and the other is located to intercept sediment and trap nutrients transported by tile lines. The prescribed wastewater system improvements are based on assessment by grab samples test by the State Hygienic Lab, development of a Preliminary Engineering Report, soil analysis and communication with IDNR wastewater officials. The two wetland sites were assessed by officials from IDALS and the Jones County SWCD. This project is part of $1.7 million lake restoration effort to reclaim the 47 year old lake. The lake has a positive economic impact of more than $7.6 million annually and supports an average annual visitation of 58,145, according to the Iowa Lakes Valuation Project, conducted by Iowa State University.
Resumo:
Storm Lake, the state's fourth largest natural lake, has been the centerpiece of significant economic development, including a resort, water park, and state marina. While there have been considerable improvements to the lake's water quality through a major on-going lake restoration program and watershed project, the Little Storm Lake area still needs to be addressed. Little Storm Lake is a 190 acre area on the nmihwest side of Storm Lake. The water level in both areas is based on the dam height located on the southeast corner of Storm Lake. Approximately 70% of the water from the watershed flows through Little Storm Lake. Little Storm Lake originally had the ability to remove much of the sediment and nutrients from incoming waters. However, due to degradation, proper wetland function has been compromised. Under normal hydrologic conditions Little Storm Lake has the potential to function as a sediment trap for Storm Lake, but tllis capacity is overwhelmed during high flows. Little Storm Lake is at or near its sediment trapping capacity, which results in higher sediment transport into Storm Lake. Resuspension of sediments due to wind and other in-lake dynamics, such as rough fish, further exacerbate the total turbidity from suspended sediment and results in movement of sediment from Little Storm Lake into Storm Lake. This project includes a fish barrier and water retention structure between Little Storm Lake and Storm Lake and the construction of a pumping station and associated equipment. The project involves periodic dewatering of Little Storm Lake during years of favorable climatological conditions to consolidate the sediments and revegetate the area. Construction of the fish banier would aid restoration efforts by preventing rough fish from destroying the vegetation and would decrease recruitment of rough fish by limiting their spawning area. In the future, if the diminished trapping capacity of Little Storm Lake still results in sediment moving into Storm Lake, a dredging project would be initiated to deepen Little Storm Lake.
Resumo:
The city of Elliott has had an increase in nitrate levels in their community water supply located in the Coe Creek Watershed. They have been working with the IDNR Source Water Protection (SWP) Programs to conduct site investigations and have formed a SWP Planning Team. This Team has been reviewing the investigation findings, formed an action plan and studied different Best Management Practices (BMPs). After considering the BMPs the SWP Team made a recommendation to the Elliott City Council which included native grass seeding and a shallow water wetland. The Team also held an informational meeting for the citizens of Elliott. The goal of this meeting was to inform and educate the public of the Team findings and BMPs. The Elliott City Council approved the restoration of a shallow wetland with a native grass buffer. This whole project is 27 acres and includes a shallow water wetland with native grass buffer. This would be a long term method to reduce nitrates in the city wells. Elliott is partnering with the Natural Resources Conservation Service, Montgomery County Soil and Water Conservation District, Pheasants Forever, the Montgomery County Conservation Board, US Fish and Wildlife Service and the Montgomery County Board of Supervisors in the restoration of the shallow water wetland and native grass buffer.
Resumo:
The Lost Island Lake watershed is located in the prairie pothole region, a region dotted with glacial wetlands and shallow lakes. At 1,180 acres, Lost Island Lake is the state's fifth largest natural lake and its watershed is comprised of nearly 1,000 acres of wetland habitat, including Iowa 's largest natural wetland – Barringer Slough. Unfortunately, Lost Island and its associated wetlands are not functioning to their fullest ecological and water quality potential. In 2002 and 2004, Lost Island Lake was categorized as '·impaired'" on Iowa's Impaired Waters List. Frequent algal blooms and suspended solids drastically increase turbidity levels resulting in its impairment. To investigate these concerns, a two-year study and resulting Water Quality Improvement Plan were completed. The water quality study identified an overabundance of non-native common carp (Cyprinus carpio) in the lake and its surrounding wetlands as a primary cause of impairment. The goal of the Lost Island Lake Watershed Enhancement Project is to restore ecological health to Lost Island Lake and its intricate watershed resulting in improved water quality and a diverse native plant and wildlife community. The purpose of this grant is to obtain funding for the construction of two combination fish barriers and water control structures placed at key locations in the watershed within the Blue Wing Marsh complex. Construction of the fish barriers and water control structures would aid restoration efforts by preventing spawning common carp from entering wetlands in the watershed and establishing the ability to manage water levels in large wetland areas. Water level management is crucial in wetland health and exotic fish control. These two structures are part of a larger construction project that involves a total of four combination fish barriers and water control structures and one additional fish barrier. The entire Lost Island Lake Watershed Enhancement Project is a multi-year project, but the construction phase for the fish barriers and water control structures will be completed before December 31, 2011.
Resumo:
Phase 2 of the Saylor Creek Improvement Project is focused on channel restoration. The existing stream channel is generally incised, running through areas primarily covered with heavy trees, brush and weeds. The ravine ranges from 6 to 20 feet deep through the corridor with very steep slopes in several areas. In two areas storm outlets are undercut or suspended above the channel. Tall undercut, eroded banks exist along several of the outside bends. Sediment deposition on the inside bends limits the cross-section of the channel, increasing flow velocity and forcing this faster flow toward the eroded outside bank. A wide array of practices will need to be implemented to address channel erosion. Improvements will be specifically tailored to address problems observed at each bend. The result will be a channel with a more natural appearance, and reduced use of hard armor and revetment. Some sections will require minimal grading with removal of underbrush for improved maintenance access and more sun exposure, better allowing deep rooted plants and flowers to establish to provide further erosion protection. Straight sections with steep banks will require grading to pull back slopes, increasing the creek's capacity to convey storm flows at slower velocities. Sections with sharp bends will require slope pull back and armor protection. A constructed wetland will collect and treat runoff from a small sub-watershed, before being discharged into the main tributary.