930 resultados para Power transmission planning
Resumo:
This report analyzes the basis of hydrogen and power integration strategies, by using water electrolysis processes as a means of flexible energy storage at large scales. It is a prospective study, where the scope is to describe the characteristics of current power systems (like the generation technologies, load curves and grid constraints), and define future scenarios of hydrogen for balancing the electrical grids, considering the efficiency, economy and easiness of operations. We focus in the "Spanish case", which is a good example for planning the transition from a power system holding large reserve capacities, high penetration of renewable energies and limited interconnections, to a more sustainable energy system being capable to optimize the volumes, the regulation modes, the utilization ratios and the impacts of the installations. Thus, we explore a novel aspect of the "hydrogen economy" which is based in the potentials of existing power systems and the properties of hydrogen as energy carrier, by considering the electricity generation and demand globally and determining the optimal size and operation of the hydrogen production processes along the country; e.g. the cost production of hydrogen becomes viable for a base-load scenario with 58 TWh/year of power surplus at 0.025 V/kWh, and large number electrolyzer plants (50 MW) running in variable mode (1-12 kA/m2)
Resumo:
At the level of the cochlear nucleus (CN), the auditory pathway divides into several parallel circuits, each of which provides a different representation of the acoustic signal. Here, the representation of the power spectrum of an acoustic signal is analyzed for two CN principal cells—chopper neurons of the ventral CN and type IV neurons of the dorsal CN. The analysis is based on a weighting function model that relates the discharge rate of a neuron to first- and second-order transformations of the power spectrum. In chopper neurons, the transformation of spectral level into rate is a linear (i.e., first-order) or nearly linear function. This transformation is a predominantly excitatory process involving multiple frequency components, centered in a narrow frequency range about best frequency, that usually are processed independently of each other. In contrast, type IV neurons encode spectral information linearly only near threshold. At higher stimulus levels, these neurons are strongly inhibited by spectral notches, a behavior that cannot be explained by level transformations of first- or second-order. Type IV weighting functions reveal complex excitatory and inhibitory interactions that involve frequency components spanning a wider range than that seen in choppers. These findings suggest that chopper and type IV neurons form parallel pathways of spectral information transmission that are governed by two different mechanisms. Although choppers use a predominantly linear mechanism to transmit tonotopic representations of spectra, type IV neurons use highly nonlinear processes to signal the presence of wide-band spectral features.
Resumo:
No setor de energia elétrica, a área que se dedica ao estudo da inserção de novos parques geradores de energia no sistema é denominada planejamento da expansão da geração. Nesta área, as decisões de localização e instalação de novas usinas devem ser amplamente analisadas, a fim de se obter os diversos cenários proporcionados pelas alternativas geradas. Por uma série de fatores, o sistema de geração elétrico brasileiro, com predominância hidroelétrica, tende a ser gradualmente alterada pela inserção de usinas termoelétricas (UTEs). O problema de localização de UTEs envolve um grande número de variáveis através do qual deve ser possível analisar a importância e contribuição de cada uma. O objetivo geral deste trabalho é o desenvolvimento de um modelo de localização de usinas termoelétricas, aqui denominado SIGTE (Sistema de Informação Geográfica para Geração Termoelétrica), o qual integra as funcionalidades das ferramentas SIGs (Sistemas de Informação Geográfica) e dos métodos de decisão multicritério. A partir de uma visão global da área estudada, as componentes espaciais do problema (localização dos municípios, tipos de transporte, linhas de transmissão de diferentes tensões, áreas de preservação ambiental, etc.) podem ter uma representação mais próxima da realidade e critérios ambientais podem ser incluídos na análise. Além disso, o SIGTE permite a inserção de novas variáveis de decisão sem prejuízo da abordagem. O modelo desenvolvido foi aplicado para a realidade do Estado de São Paulo, mas deixando claro a viabilidade de uso do modelo para outro sistema ou região, com a devida atualização dos bancos de dados correspondentes. Este modelo é designado para auxiliar empreendedores que venham a ter interesse em construir uma usina ou órgãos governamentais que possuem a função de avaliar e deferir ou não a licença de instalação e operação de usinas.
Resumo:
Reactive power is critical to the operation of the power networks on both safety aspects and economic aspects. Unreasonable distribution of the reactive power would severely affect the power quality of the power networks and increases the transmission loss. Currently, the most economical and practical approach to minimizing the real power loss remains using reactive power dispatch method. Reactive power dispatch problem is nonlinear and has both equality constraints and inequality constraints. In this thesis, PSO algorithm and MATPOWER 5.1 toolbox are applied to solve the reactive power dispatch problem. PSO is a global optimization technique that is equipped with excellent searching capability. The biggest advantage of PSO is that the efficiency of PSO is less sensitive to the complexity of the objective function. MATPOWER 5.1 is an open source MATLAB toolbox focusing on solving the power flow problems. The benefit of MATPOWER is that its code can be easily used and modified. The proposed method in this thesis minimizes the real power loss in a practical power system and determines the optimal placement of a new installed DG. IEEE 14 bus system is used to evaluate the performance. Test results show the effectiveness of the proposed method.
Resumo:
From the Introduction. The Media Sector has experienced a technological revolution in the last 15 years. Digital encoding of television signals made possible a more efficient use of the radiospectrum. Digital terrestrial television (hereinafter, “DTT”) allows now for the reception of a significant number of free-to-air channels.1 Moreover, the use of new transmission platforms (hereinafter,“platforms”), namely cable and direct-to-home satellite (hereinafter, “DTH”) paved the way for the arrival in Europe of pay-TV operators, which finance their activities mainly via subscription fees. This changing technological landscape is subject to further evolution in the near future, as incumbent telecommunications operators become increasingly interested in making available broadcasting content2 as part of their broadband offer and 3G mobile handsets can be used for the reception of TV signals....The present paper seeks to ascertain whether the Commission “regulatory approach” towards the exclusive sale of premium content is a sound one, in particular in view of the constant technological evolution outlined above. The assumptions underlying landmark Commission decisions will be compared with recent developments of the media sector in Italy. In the NewsCorp./Telepiù case, decided in 2003, the Commission imposed very strict conditions to allow the merger giving birth to Sky Italia, on the assumption that the operation created a lasting near-monopsony in the different upstream markets for the acquisition of premium intervened against the media conglomerate Mediaset (which controls, inter alia, the main three private free-to-air channels in Italy) for an alleged abuse of dominant position.17 In fact, and contrary to the forecasts made by the Commission, Mediaset was in a position to acquire the broadcasting rights of the main Italian football teams, thereby excluding the incumbent (and near-monopolist) pay-TV operator, Sky Italia. This may go to show that the reality of the sector is more complex and evolves faster than one may infer from the Commission practice, thus putting into question its stance regarding exclusivity. The experience of the evolution of the Italian media sector will be used as the starting point for the evaluation of alternative regulatory options.
Resumo:
Since the Party of Regions took power in Ukraine, the process of strengthening the executive branch of government at the expense of the others, together with the instrumental use of the law, has been progressing steadily. By seeking to restrict criticism of the government, the ruling party is aiming at marginalisation of opposition groups and establishing informal control over the main media (largely by exerting pressure on their owners). The role of the Security Service of Ukraine (SBU) is growing, as it is used increasingly frequently to put pressure on Western-oriented NGOs. The government’s control over the judiciary is expanding. These trends had existed before the Party of Regions’ ascension to power, but they were much weaker, as the previous governments did not enjoy such a strong position or the ability to achieve their ends so efficiently. The Party of Regions is planning to take another step towards total power during the local elections scheduled for October 2010. The party is determined to establish control over the local self-governments; to this end, it has amended the legislation in a way which now undermines local civil initiatives. These changes not only illustrate the interests and political standpoint of the ruling elite; they also result from systemic reasons, and these are deeply rooted in the Soviet past. The present Ukrainian state has evolved through the evolutionary transformation of the Ukrainian Soviet Socialist Republic. As a result, the main features of the previous system have been sustained, including the weakness of the representative bodies and the instrumental use of the law. Twenty years into its independent development, Ukraine has developed a merely formal democracy, which is distant from EU standards.
Resumo:
During Russian PM Dmitry Medvedev’s working visit to Minsk on 18 July, Russia and Belarus signed a general contract for the construction of a nuclear power plant in Belarus. The signature brought to an end the complex negotiations which had been underway since January 2009 involving the leadership in Minsk, the Russian government and Atomstroyexport, the Russian company that will be the main contractor of the investment. However, the power plant’s future ownership structure, management arrangements and terms and conditions of profit sharing remain unclear. The Belarusian leadership hopes that with the launch of the nuclear power plant, it will be able to reduce gas imports from Russia, gas being the main resource used in producing heat and electricity in Belarus. This should in turn reduce the costs of energy generation. In addition, Minsk expects that the new investment will allow it to export electricity surpluses to the European Union, including Poland. Agreements concerning the power plant have been concluded over the last year or so and, according to these, Russia has acquired partial control of the Belarusian electricity grid, especially with regard to the transmission of energy to foreign markets. Russia is also the sole creditor and contractor for the investment, and the sole future provider of nuclear fuel. Therefore, implementation of the project will exacerbate Minsk’s already significant dependence on Moscow in energy and political terms.
Resumo:
Mode of access: Internet.
Resumo:
At head of title FCST energy R&D goals study.
Resumo:
National Highway Traffic Safety Administration, Office of Research and Development, Washington, D.C.
Resumo:
Mode of access: Internet.
Resumo:
"MTI-71TR75."
Resumo:
Mode of access: Internet.
Resumo:
"December 2008"--Colophon.
Resumo:
"ILENR/RE-SP-87/03."