994 resultados para Pa Mong Project.
Resumo:
The National Centers for Coastal Ocean Science (NCCOS) of the National Oceanic and Atmospheric Administration (NOAA) is interested in developing a project to determine the health of estuaries based on the stated or desired uses of society. An estuarine use assessment could complement the National Coastal Assessment, which tracks coastal and estuarine health through a series of environmental indicators. These indicators are used to assign a “score” to each coastal region, with some indicators reflecting the ability of the region to support desired uses such as fishing and swimming. An estuarine use assessment could also provide valuable information to resource managers and other decision-makers as they face decisions about the optimal and most sustainable mix of activities in an estuary. An initial step of an estuarine use assessment would be to define and quantify the desired societal uses of the estuary. Society includes residents living near the estuary or industries relying on the estuary, seasonal residents and tourists that use the estuary on a more limited basis, and the public at-large that may use or value the estuary indirectly. The desired uses may include discrete, visible uses such as swimming, recreational or commercial fishing, and navigation. They also may extend to broader, more intangible uses such as maintaining ecological functions or aesthetic appeal. National legislation such as the Estuary Restoration Act, which promotes and funds the restoration of estuaries in the U.S., reflects the public’s desire for estuaries to retain their ecological structures and functions. This report summarizes a project carried out in 2003 that attempted to quantify the desired human uses of a specific estuary in Maine and to determine current measures of success used by coastal managers in Maine to track the ability of the estuary to support desired uses. Casco Bay was chosen as the spatial embayment for which to delineate uses, and nutrient enrichment was selected as the parameter for confirming assumptions about current measures of outcomes related to uses. The report highlights some of the challenges to completing an estuarine use assessment and offers general recommendations for addressing these challenges.
Resumo:
A meeting was convened on February 22-24, 2005 in Charleston, South Carolina to bring together researchers collaborating on the Bottlenose Dolphin Health and Risk Assessment (HERA) Project to review and discuss preliminary health-related findings from captured dolphins during 2003 and 2004 in the Indian River Lagoon (IRL), FL and Charleston (CHS), SC. Over 30 researchers with diverse research expertise representing government, academic and marine institutions participated in the 2-1/2 day meeting. The Bottlenose Dolphin HERA Project is a comprehensive, integrated, multi-disciplinary research program designed to assess environmental and anthropogenic stressors, as well as the health and long-term viability of Atlantic bottlenose dolphins (Tursiops truncatus). Standardized and comprehensive protocols are being used to evaluate dolphin health in the coastal ecosystems in the IRL and CHS. The Bottlenose Dolphin Health and Risk Assessment (HERA) Project was initiated in 2003 by Dr. Patricia Fair at the National Oceanic and Atmospheric Administration/National Ocean Service/Center for Coastal Environmental Health and Biomolecular Research and Dr. Gregory Bossart at the Harbor Branch Oceanographic Institution under NMFS Scientific Research Permit No. 998-1678-00 issued to Dr. Bossart. Towards this end, this study focuses on developing tools and techniques to better identify health threats to these dolphins, and to develop links to possible environmental stressors. Thus, the primary objective of the Dolphin HERA Project is to measure the overall health and as well as the potential health hazards for dolphin populations in the two sites by performing screening-level risk assessments using standardized methods. The screening-level assessment involves capture, sampling and release activities during which physical examinations are performed on dolphins and a suite of nonlethal morphologic and clinicopathologic parameters, to be used to develop indices of dolphin health, are collected. Thus far, standardized health assessments have been performed on 155 dolphins during capture-release studies conducted in Years 2003 and 2004 at the two sites. A major collaboration has been established involving numerous individuals and institutions, which provide the project with a broad assessment capability toward accomplishing the goals and objectives of this project.
Resumo:
This study provides an overview of the aquaculture sector in Ghana. It assesses the actual and potential contribution of aquaculture to poverty reduction and food security, and identifies enabling conditions for and drivers of the development of Ghana’s aquaculture sector. The study uses data collected from a variety of primary and secondary sources, including key informant interviews with actors within the aquaculture sector and relevant secondary literature.
Resumo:
The paper describes the development of a software design aid for use at the conceptual stage of engineering design. It is intended for use in the design of mechatronic products but has wider potential uses. Early approaches were based on function structures and tables of options and the system that evolved allows the assembly of schemes linked by matching their input and output ports. A database of components is provided which can be accessed via different indexes and the designer can easily create and compare alternative schemes at the concept stage. A bond graph approach is used to define the interconnections between components. This allows correct port matching but also provides for future development such as constraint propagation through the design and links to simulation tools. © 1993 Springer-Verlag New York Inc.
Resumo:
Following the commencement of construction works of a 250 MW hydropower plant at Dumbbell Island in the Upper Victoria Nile in September 2007, BEL requested NaFIRRI to conduct continuous monitoring of fish catches at two transects i.e. the immediate upstream transect of the project site (Kalange-Makwanzi) and the immediate downstream .transect (Buyala-Kikubamutwe). The routine monitoring surveys were designed to be conducted twice a week at each of the tWo transects. It was anticipated that major immediate impacts were to occur during construction, and these needed to be known by BEL as part of a mitigation strategy. For example, the construction of it cofferdam could be accompanied by rapid changes in water quality and quantity downstream of the construction. These changes in turn could affect the fish catch and would probably be missed by the quarterly monitoring already in place. Therefore, a major cbjective of the more regular and rapid monitoring was to discern immediate impacts of construction activities by focusing on selected water quality parameters (total suspended solids, water conductivity, temperature, dissolved oxygen and pH) and fish catch characteristics (total catch, catch rates and value of the catch)
Resumo:
The author gives a financial and economic valuation of the operation of vessels in the 38 foot GRP class. He discusses particularly the materials and methods of fishing they use, species composition of their catches, their rate of return, break-even analysis, financial and social analysis.
Resumo:
】目的观察重组竹叶青蛇毒纤溶酶原激活剂一体内溶栓效应。方法利用家兔制备的脑血检 模型, 以生理盐水和尿激酶为对照, 用数字减影血管造影技术观察重组竹叶青蛇毒纤溶酶原激活剂飞体内溶 检效果。结果昭高剂量实验组喇再通时间为以内月州低剂量实验组止以内再 通。尿激酶组以刃再通时间为一以内生理盐水对照组没有观察到再通现象。实验动物后处 死解剖, 未观察到出血现象和其它异常现象。结论重组巧勺一在体内具有良好的溶检活性。
Resumo:
A study on the status of fisheries and environmental impact assessment (EIA) was conducted on Bashundhara Baridhara Housing Project (BBHP), Dhaka, Bangladesh for prediction and measure the effects of housing project related development activities that have already been implemented and planned for future implementation. The project is still under development phase and so far allotted 10,000 plots of different sizes. The study shows that the original water bodies and natural fish production there from have greatly declined due to earth filling carried out for development of land for the housing. The physico-chemical parameters of the existing water body within the project area were found to be suitable for fish farming in the estate. A number of economically important fish species are found available in the existing lake. However, the natural fisheries resources of the existing lake is under great stress due to the changes made in the ecosystem, siltation, construction of building and dumping of house building and household waste materials. This has caused some important fish species of the lake to become critically endangered and vulnerable which have been documented in this paper. Appropriate regulatory and mitigating measures with respect to water management, disposal of construction garbage and other biomedical toxic substances far away from the water bodies are required to be taken to keep the water safe and suitable for fish production as well as for multipurpose use of the lake water.
Resumo:
Water service providers (WSPs) in the UK have statutory obligations to supply drinking water to all customers that complies with increasingly stringent water quality regulations and minimum flow and pressure criteria. At the same time, the industry is required by regulators and investors to demonstrate increasing operational efficiency and to meet a wide range of performance criteria that are expected to improve year-on-year. Most WSPs have an ideal for improving the operation of their water supply systems based on increased knowledge and understanding of their assets and a shift to proactive management followed by steadily increasing degrees of system monitoring, automation and optimisation. The fundamental mission is, however, to ensure security of supply, with no interruptions and water quality of the highest standard at the tap. Unfortunately, advanced technologies required to fully understand, manage and automate water supply system operation either do not yet exist, are only partially evolved, or have not yet been reliably proven for live water distribution systems. It is this deficiency that the project NEPTUNE seeks to address by carrying out research into 3 main areas; these are: data and knowledge management; pressure management (including energy management); and the associated complex decision support systems on which to base interventions. The 3-year project started in April of 2007 and has already resulted in a number of research findings under the three main research priority areas (RPA). The paper summarises in greater detail the overall project objectives, the RPA activities and the areas of research innovation that are being undertaken in this major, UK collaborative study. Copyright 2009 ASCE.
Resumo:
通过生物信息学和系统发育学分析,研究了苦味受体和甜味/鲜味受体的进化途径。结果显示,苦味受体 和甜味/鲜味受体在进化上具有远相关,并且具有不同的进化途径,提示这可能是导致这些受体具有不同功能,传 导不同味觉的原因。