999 resultados para Dimensionamento de cimbres
Resumo:
This study aims to determine the best configuration for the new gearbox of the new Baja´s vehicle from Piratas do Vale team, focusing on the gear train, in order to achieve high performance of it. To this end, first some information about the vehicle is gathered to determine the best pair of gears configuration, then calculations about maximum bending stress, fatigue and surface thereof are performed; ; thereafter static simulations are performed using an a appropriated software. Thus this paper shows a satisfactory design of the addressed, besides providing the Baja SAE team consultation material for future use in the project
Resumo:
The growth of urban population associated with the shortage of supply of public infrastructure such as hospitals, kindergartens, schools, among others, has reinforced the need to develop alternative methods that simplify the construction processes and allows for a reduction in these costs works. The conventional processes have increasingly been shown ineffective to solve the problem of demand for different types of urban and rural buildings. Given this fact, industrial construction processes can gain space and have proven to be highly interesting to solve the above problems, in particular, considering the cost-effective and time. Therefore, this study aimed to determine the influence of moisture on the strength of metal plate connections connectors (printed plate with teeth). For the sizing of the links between structural lumber using metal connectors with teeth prints; controlled process variables (drying of the wood and the different moisture contents), and finally found results and compare them with different literatures order to obtain a qualitative efficiency of the process. Some specimens had very low expectations, can be explained by the presence of bone marrow, and pre-existing cracks. Thus, the results were discarded for further analysis and more accurate results
Resumo:
This paper presents a case study in a largebeverage company,which suffers fromlack of inputs. Through 5 Whys analysis,it was possible to find the root causes of the problem: the bad fleet sizing deliveriesand low capacityof storage of inputs. Through the use of simulation, it was possible to determine theactual fleet required, and it was alsoquantified thespace required for thestorage ofloads.Based on these results andconsidering the cost, it waspossible todetermine which the most effective solutions toreducing the initialproblem: the increase of storage capacity, considered the best option, even demanding time, or the increase of the fleet, considered a stopgap measure to partially solve the problem until the first solution is finalized
Resumo:
This paper aims to present the design, development and construction of a reducer / multiplier speeds low cost, sturdy and easy operation. The beginning of the project was given to research on issues related to mechanisms and machine elements, and these theories of fundamental importance in the development of items of equipment which, together with the aid of AutoCAD software, enabled the construction of it. Parallel to the sizing of equipment, were also investigated and taken into account the costs of materials used in the project. Made to mount the reducer / multiplier speeds it was at the evidence through experiments involving the use of torque wrench, tachometer and weights, getting proven applicability in situations that are small or medium loads required
Resumo:
The electrical substations have the goal to transmit, distribute and change the characteristics of electrical energy transmission networks of dealers to the end user with a high rate of reliability and continuously. For this it’s necessary to accomplish a gathering of datas from the local dealers where will be installed the substation to make a good electric project. This work has the objective to gather all the contents relatives to electric project of substation that are scattered in the literature, in order to organize and develop a basic guide that presents a methodology to dimension electrical equipments that belong to an industrial substation at 15 kV. In addition to elaborate a basic guide, this work aids to specify electrical equipments installed in the substation, bringing information and comparisons to know and determinate the kind of equipments that will be used, in a correct and coherent way with the national and international rules. Ultimately, after determined, got and specified all the equipments that belongs to an industrial substation, the work mention in global manner how to calculate the dimension of substation physical arrangement, determining all the least and required dimensions of each cubicle
Resumo:
Solar energy can be considered the largest source of energy available on earth and has attracted in recent decades, attention and interest for its rational use. The use of energy sources in a sustainable way is essential to the survival of future generations, due to the scarcity of natural resources and their exploitation in a disorderly way. This academic work aims to bring a possible alternative to reduce the consumption of eletrical energy, at the University of Engineering – Campus of Guaratinguetá, through the use of a photovoltaic system interconnected to the LED bulbs. For this, the necessary data for the design of the photovoltaic system componentes and their acquisition costs were obtained and three differents configurations were developed to choose the one that bests fits the studied case, considering the return time of the initial investment (payback)
Resumo:
Population growth, together with the gradual social ascent in Brazil, reflects at the growing need for better use of urban spaces. In this context, the amount of new buildings to meet the demand in property market, the needs for creating new roads and highways, among others, make the use of geotechnical works and, more specifically, retaining walls, more and more common. One of the simplest solutions for underground works is the use of retaining structures using tie back walls for soil support, therefore, the present work deals with this kind of structures. This paper proposes the use of FTOOL software testing in predicting deformations in tie back walls, by comparing simulations of the presented model to a real and measured deformation case in Guabirotuba Formation (PR). The results showed the importance of defining the parameters such as stiffness and curtain geometry, as well as the definition of representative loads acting on it. Also, it was pointed out that the passive response of the steel rods depends on the horizontal displacement of the wall. The study concluded that the program generates very representative results when compared to field data and seems to be a promising tool for tie back structures displacement predictions
Resumo:
The purpose of this work is to study the theme “infiltration trenches” in some of its main aspects, such as sizing methods and parameters related to this, in order to subsidize the installation of these structures in the urban area of Rio Claro/SP. For purposes of sizing, the “rain-envelope method” was used for its simplicity and direct application from the local characterization data and the IDF (intensity-duration-frequency) curve data. The method bases on the determination of the tributary volume of input and output device. The curve of values accumulated over time of the volumes tributaries to the device, which is built on the flow rates obtained from the local IDF curve, is compared with the value curve of his effluent volumes determined from the flow characteristics obtained from the infiltration soil. The maximum difference between the curves is the volume sizing. Five locations were chosen in the urban area of Rio Claro for implementation of these devices, considering the soil type, hydraulic conductivity of each area and lot size according to the Master Plan of Rio Claro. This work also presented an estimated reduction of the runoff in urban lots by using infiltration trenches.
Resumo:
O presente trabalho consiste em demonstrar valores referentes ao conforto ambiental de dois modelos construtivos, sendo o primeiro um edifício já executado e o outro em fase de implantação, ambos no Campus Experimental de Itapeva, aplicando alguns conceitos em habitação mais sustentáveis de madeira na região de Itapeva, estado de São Paulo, Brasil. A edificação construída sedia duas salas de aula a partir da tipologia construtiva wood frame, constituída basicamente de paredes autoportantes compostas de ossatura de madeira tratada de pinus.sp, chapas estruturais em OSB, manta de isolamento térmico/acústico e fechamento interno e externo, respectivamente em gesso e sidding (lambris de madeira). A habitação em fase de início de implantação foi idealizada a partir da tipologia construtiva log-home, e atenderá a necessidade de espaço físico para abrigar o Centro Acadêmico e a empresa-júnior “PROMAD”, ambos do curso de Engenharia Industrial Madeireira do Campus Experimental da UNESP/Itapeva. Esta construção foi elaborada a partir de técnicas de baixo impacto ambiental, levando em consideração os resultados de análise térmica obtidos na edificação anterior. Em ambos modelos construtivos foram empregados recursos renováveis abundantes na região, como a madeira de reflorestamento de Pinus e de Eucalipto. Foi acrescentado ainda ao segundo modelo a utilização de resíduos industriais lignocelulósicos, como rolete de laminação e outros materiais locais disponíveis. A metodologia básica empregada para a obtenção de dados sobre o conforto térmico em relação as edificações foi, para o primeiro caso, a coleta de dados de temperatura e umidade utilizando um termo-higrômetro, a sistematização e análise de dados reais obtidos no interior da edificação. No segundo caso, o dimensionamento do conforto térmico... (Resumo completo, clicar acesso eletrônico abaixo)
Resumo:
Pós-graduação em Agronomia (Ciência do Solo) - FCAV
Resumo:
In this paper a mathematical model that combines lot-sizing and cutting-stock problems applied to the furniture industry is presented. The model considers the usual decisions of the lot sizing problems, as well as operational decisions related to the cutting machine programming. Two sets of a priori generated cutting patterns are used, industry cutting patterns and a class of n-group cutting patterns. A strategy to improve the utilization of the cutting machine is also tested. An optimization package was used to solve the model and the computational results, using real data from a furniture factory, show that a small subset of n-group cutting patterns provides good results and that the cutting machine utilization can be improved by the proposed strategy.
Resumo:
Neste trabalho, propomos um modelo integrado de dimensionamento de lotes e programação da produção monomáquina para uma fábrica de refrigerantes de pequeno porte. As decisões de dimensionamento foram baseadas em um modelo encontrado na literatura e as decisões de sequenciamento foram modeladas utilizando restrições do problema do caixeiro viajante assimétrico. Para a validação do modelo proposto foram feitos testes computacionais com exemplares gerados aleatoriamente, e também exemplares baseados em dados reais obtidos da literatura. Os exemplares foram resolvidos pelo método Branch-and-Cut incluído no pacote computacional CPLEX 10.0. Os resultados mostram que o modelo proposto representa o planejamento da produção em fábricas de bebidas monomáquinas e que, em algumas situações, produz resultados melhores que o modelo da literatura.
Resumo:
This work deals with the sequencing of Multi-Mixed-Model Assembly Lines in a lean manufacturing environment, where an operational structure where several kanbans support several mixed-model assembly lines, so that all assembly lines can receive parts or sub-assemblies from all suppliers. To optimize this system, the sequencing seeks to minimize the distance between the real consumption and the constant ideal consumption of parts or subassemblies, thereby reducing the scaling of kanbans and intermediate stocks. To solve the sequencing problems, the method Clustering Search was applied along with the metaheuristics Variable Neighborhood Search, Simulation Annealing and Iterative Local Search. Instances from the literature and generated instances were tested, thus allowing comparing the methods to each other and with other methods presented in the literature. The performance of the Clustering Search with Iterated Local Search stands out by the quality and robustness of their solutions, and mainly for its efficiency, whereas it converges to better results at a lower computational cost
Resumo:
This work presents a study about distributed generation using photovoltaic systems in the context of smart grids. The characteristics of a Smart Grid and the several aspects this concept involves - distributed generation among them - are discussed. There are also examples of equipment, like smart meters, and of national and international projects. The specificities of distributed generation and the rules and standards necessary in this sort of installation are talked through with focus in the solar energy generation method. Regarding photovoltaic systems, the working principles of the panels are presented, along with its main electrical characteristics and the technologies available. Finally there is a study concerning the sizing of a distributed generation system that involves photovoltaic panels in a residential plant. An analysis of the costs and return of investment period is made about the specific case in consideration.
Resumo:
Due to concerns about rational use of energy, several alternative technologies of power generation appeared, including the conversion of solar energy into electrical energy by photovoltaic panels. In low-income households, the refrigerator represents considerable impact on the electric bill, since it requires constant power given its use in food preservation. It is possible to reduce this share, with the use of an alternative energy source. This work presents a timed switching electronic system, which allows commercial equipment that is not affected by short interruptions in the power supply to use a photovoltaic panel as a source of alternative energy, which usually do not provide energy continuously. Switching is made automatically in case of low incidence of sunlight, and without any form of energy storage. Between each switching, there is a dead time without power supply, therefore preventing the use of synchronizers circuits between the photovoltaic panel and the public power grid. A circuit containing a 80C31 microcontroller is used to control the system’s switching. The photovoltaic panel’s voltage inverter is in H bridge configuration, and is also controlled by the microcontroller through Pulse Width Modulation, which makes use of preprogrammed tables to generate the control signals of the power transistors. Through the use of software simulations, the proposed system was tested, which is capable of supplying intermittent single-phase loads. The simulations indicates that the project developed in this paper can be assembled into a prototype and be tested under real operating conditions, as long as the scaling of components, the characteristics of the photovoltaic panel to be used, and the project involved load are taken into account