999 resultados para Corrosion monitoring


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Under the implementation of the fisheries management plan (IFMP) for Lake Victoria result area 4, bottom trawl monitoring surveys are undertaken to monitor changes in the status of the fish stocks and environment of Lake Victoria. Trawl together with the lake-wide Hydroacoustic surveys give a reflection on the status of fish stocks in the lake to guide management decisions The National working group for bottom trawl surveys in Uganda undertakes these surveys within the Uganda sector of Lake Victoria. For the purpose of this survey, the Uganda sector of Lake Victoria is divided into three zones. A cruise lasting twenty days is conducted in two phases (two legs) 13 days covering Zones I and II and 7 days in Zone III.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Source of the Nile Fish farm (SON) is located at Bugungu area in Napoleon Gulf, northern Lake Victoria. The proprietors of the farm have a collaborative arrangement with NaFIRRI to undertake quarterly environment monitoring of the cage site as is mandatory under the NEMA conditions. The monitoring surveys cover selected physical-chemical factors i.e. water column depth, water transparency, water column temperature, dissolved oxygen, pH and conductivity; nutrient status, algal and invertebrate communities (micro-invertebrates/zooplankton and macroinvertebrates/ macro-benthos) as well as fish community. The second quarter survey for the calendar year 2015, which is the subject of this report, was undertaken in June 2015. Results/observations made are presented in this technical report along with a scientific interpretation and discussion of the results with reference to possible impacts of the cage facilities to the water environment and aquatic biota.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This monitoring survey No. 11 undertaken between 4th and 9th September 2012 is the second one to be conducted after completion of construction of Bujagali Hydropower Dam. Two pre-construction baseline surveys in April 2000 and April 2006 were conducted and during construction phase, eight monitoring surveys (September 2007, April 2008, April 2009, October 2009, April 2010, September 2010, April 2011, September 2011) were conducted.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Human use of water resow-ces in Uganda has grown and intensified along with population growth and increasing demand to meet the diverse human needs. In the case of Uganda's rivers, the main uses include fisheries, hydropower generation, abstraction for potable water supply, discharge of sewage and navigation. All these uses can disrupt the integrity of the aquatic ecosystem and may affect the survival of the diversity of organisms. In consideration of the need to increase electricity to meet demand, the Bujagali Hydro-power Project (BHPP) and the National Environment Management Authority (NEMA) recognised the importance of safeguards to mitigate impacts of the project. The National Fisheries Resources Research Institute (NaFIRRI) was assigned the role of providing baseline information on the aquatic ecosystem of the Upper Victoria Nile and to follow up the findings with a monitoring framework during construction and post-commissioning phases.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The results reported on were from a monitoring survey No.7 undertaken between 4 th and 7th September 2010 during construction period of the Bujagali Hydropower Project (BHPP). Two pre-construction, baseline surveys in April 2000 and April 2006 were conducted and so far, during construction phase of the project, six monitoring surveys have been undertaken i.e. in September 2007, April 2008, April 2009, October 2009, April 2010 and the present one, in September 2010. Since 2009 biannual monitoring surveys have been conducted at an upstream and a downstream transect of the BHPP with emphasis on the following aspects: I. water quality determinants 2. biology and ecology of fishes and food webs 3. fish stock and fish catch including economic aspects of catch and 4. sanitation/vector studies (bilharzias and river blindness)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bujagali hydropower dam construction is now completed and a reservoir behind the dam has been created, extending all the way up to Kalange-Makwanzi, an upstream transects. During the 10th monitoring survey-April 2012, a third transect was established in the mid of the reservoir where it runs up to 30 m deep and sampled similarly as at the two original sampling transects, Kalange-Makwanzi and Buyala-Kikubamutwe for comparative purposes. This monitoring survey No. 12 undertaken between 25th and 30th April 2013 is the third one to be conducted after completion of construction of Bujagali Hydropower Dam. Two pre-construction baseline surveys in April 2000 and April 2006 were conducted and during construction phase, eight monitoring surveys (September 2007, April 2008, April 2009, October 2009, April 2010, September 2010, April 2011, September 2011) were conducted. Since 2009 biannual monitoring surveys have been conducted at an upstream and a downstream transect of the BHPP with emphasis on the following aspects: water quality determinants, biology and ecology of fishes and food webs, fish stock and fish catch including economic aspects of catch and sanitation/vector studies (bilharzias and river blindness). In the post-construction monitoring surveys, the assessments of algae, zooplankton and benthic macro-invertebrates which had been restrained since April 2008 were also included.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The survey covered by this report was undertaken between 3rd and 7th April 2009 as a follow-up on the during construction surveys. Two pre-construction baseline surveys were undertaken in April 2000 and April 2006. During the construction phase which started in 2007, three surveys including the current one have been undertaken i.e. in September 2007, April 2008 and the present one, in April 2009. Unlike in all previous surveys in which monitoring was conducted at one transect upstream and three downstream transects, in the current survey, two transects, one upstream and the other,downstream of the BHPP were sampled with emphasis on the following aspects: 1. water quality determinants 2. biology and ecology of fishes and food webs 3. fish stock and fish catch including economic aspects of catch and 4. sanitation/vector studies (bilharzias and river blindness)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Gill-netting and rotenoning have been used for assessing and monitoring fish stock abundance in Volta Lake. The lake and the main gear types used on it have been described. Before a gill-net sampling plan was set up, a preliminary survey was undertaken which largely determined the final form of the plan. An investigation as to whether or not the lake was being overfished concluded that it was being underfished. Commercial and experimental catch data analyses disclosed that the adults of the small species were being little utilized. Commercial sized species were also not being harvested according to their apparent proportion in the population. Production is presently fluctuating between approximately 37,000 and 40,000 tonnes. A high correlation between commercial and experimental catch was realized. Developments which have followed in the wake of stock assessment and monitoring studies include: introduction of monofilament nylon net, development of a special scoop net to permit mass harvest of clupeids after they have been attracted to light, and the design of a larger canoe which would help to extend the fishery into open water. New regulation and management policies will have to be formulated in the light of new findings before a rational exploitation of all the species can be achieved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Developments in Micro-Electro-Mechanical Systems (MEMS), wireless communication systems and ad-hoc networking have created new dimensions to improve asset management not only during the operational phase but throughout an asset's lifecycle based on using improved quality of information obtained with respect to two key aspects of an asset: its location and condition. In this paper, we present our experience as well as lessons learnt from building a prototype condition monitoring platform to demonstrate and to evaluate the use of COTS wireless sensor networks to develop a prototype condition monitoring platform with the aim of improving asset management by providing accurate and real-time information. © 2010 IEEE.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Vibration methods are used to identify faults, such as spanning and loss of cover, in long off-shore pipelines. A pipeline `pig', propelled by fluid flow, generates transverse vibration in the pipeline and the measured vibration amplitude reflects the nature of the support condition. Large quantities of vibration data are collected and analyzed by Fourier and wavelet methods.