989 resultados para university scheduling
Resumo:
The paper considers scheduling problems for parallel dedicated machines subject to resource constraints. A fairly complete computational complexity classification is obtained, a number of polynomial-time algorithms are designed. For the problem with a fixed number of machines in which a job uses at most one resource of unit size a polynomial-time approximation scheme is offered.
Resumo:
In this paper we look at ways of delivering and assessing learning on database units offered on higher degree programmes (MSc) in the School of Computing and Mathematical Sciences at the University of Greenwich. Of critical importance is the teaching methods employed for verbal disposition, practical laboratory exercises and a careful evaluation of assessment methods and assessment tools in view of the fact that databases involve not only database design but also use of practical tools, such as database management systems (DBMSs) software, human designers, database administrators (DBA) and end users. Our goal is to clearly identify potential key success factors in delivering and assessing learning in both practical and theoretical aspects of database course units.
Resumo:
This paper presents the findings of an experiment which looked at the effects of performing applied tasks (action learning) prior to the completion of the theoretical learning of these tasks (explanation-based learning), and vice-versa. The applied tasks took the form of laboratories for the Object-Oriented Analysis and Design (OOAD) course, theoretical learning was via lectures.
Resumo:
This paper presents data relating to occupant pre-evacuation times from a university and a hospital outpatient facility. Although the two structures are entirely different they do employ relatively similar procedures: members of staff sweeping areas of the structure to encourage individuals to evacuate. However, the manner in which the dependent population reacts to these procedures is quite different. In the hospital case the patients only evacuated once a member of the nursing staff had instructed them to do so while in the university evacuation the students were less dependent upon the actions of the staff with over 50% of them evacuating with no prior prompting. Although this data may be useful in a variety of areas, it was collected primarily for use within evacuation models.
Resumo:
Computer equipment, once viewed as leading edge, is quickly condemned as obsolete and banished to basement store rooms or rubbish bins. The magpie instincts of some of the academics and technicians at the University of Greenwich, London, preserved some such relics in cluttered offices and garages to the dismay of colleagues and partners. When the University moved into its new campus in the historic buildings of the Old Royal Naval College in the center of Greenwich, corridor space in King William Court provided an opportunity to display some of this equipment so that students could see these objects and gain a more vivid appreciation of their subject's history.
Resumo:
We study a two-machine flow shop scheduling problem with no-wait in process, in which one of the machines is not available during a specified time interval. We consider three scenarios of handing the operation affected by the nonavailability interval. Its processing may (i) start from scratch after the interval, or (ii) be resumed from the point of interruption, or (iii) be partially restarted after the interval. The objective is to minimize the makespan. We present an approximation algorithm that for all these scenarios delivers a worst-case ratio of 3/2. For the second scenario, we offer a 4/3-approximation algorithm.
Resumo:
This paper considers a variant of the classical problem of minimizing makespan in a two-machine flow shop. In this variant, each job has three operations, where the first operation must be performed on the first machine, the second operation can be performed on either machine but cannot be preempted, and the third operation must be performed on the second machine. The NP-hard nature of the problem motivates the design and analysis of approximation algorithms. It is shown that a schedule in which the operations are sequenced arbitrarily, but without inserted machine idle time, has a worst-case performance ratio of 2. Also, an algorithm that constructs four schedules and selects the best is shown to have a worst-case performance ratio of 3/2. A polynomial time approximation scheme (PTAS) is also presented.
Resumo:
The paper considers the flow shop scheduling problems to minimize the makespan, provided that an individual precedence relation is specified on each machine. A fairly complete complexity classification of problems with two and three machines is obtained.
Resumo:
This article describes ongoing research on developing a portal framework based on the OASIS Web Services for Remote Portlets (WSRP) standard for integration of Web-based education contents and services made available through a model for a European Networked University. We first identify the requirements for such a framework that supports integration at the presentation level and collaboration in developing and updating study programmes and course materials. We then outline the architecture design, and report on the initial implementation and preliminary evaluation.
Resumo:
In this paper we study the two-machine flow shop and open shop problems to minimize the makespan with a single interstage transporter that may carry any number of jobs between the machines at a time. For each of these problems we present a best possible approximation algorithm within a class of schedules with at most two shipments. As a by-product of this research, for the problem of minimizing the makespan on parallel identical machines we analyze the ratio of the makespan for a non-preemptive schedule over the makespan of a preemptive schedule.
Resumo:
We consider a single machine due date assignment and scheduling problem of minimizing holding costs with no tardy jobs tinder series parallel and somewhat wider class of precedence constraints as well as the properties of series-parallel graphs.
Resumo:
In this paper, we consider the problem of providing flexibility to solutions of two-machine shop scheduling problems. We use the concept of group-scheduling to characterize a whole set of schedules so as to provide more choice to the decision-maker at any decision point. A group-schedule is a sequence of groups of permutable operations defined on each machine where each group is such that any permutation of the operations inside the group leads to a feasible schedule. Flexibility of a solution and its makespan are often conflicting, thus we search for a compromise between a low number of groups and a small value of makespan. We resolve the complexity status of the relevant problems for the two-machine flow shop, job shop and open shop. A number of approximation algorithms are developed and their worst-case performance is analyzed. For the flow shop, an effective heuristic algorithm is proposed and the results of computational experiments are reported.
Resumo:
In this paper we provide a fairly complete complexity classification of various versions of the two-machine permutation flow shop scheduling problem to minimize the makespan in which some of the jobs have to be processed with no-wait in process. For some version, we offer a fully polynomial-time approximation scheme and a 43-approximation algorithm.