978 resultados para residential construction costs


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Data mining techniques extract repeated and useful patterns from a large data set that in turn are utilized to predict the outcome of future events. The main purpose of the research presented in this paper is to investigate data mining strategies and develop an efficient framework for multi-attribute project information analysis to predict the performance of construction projects. The research team first reviewed existing data mining algorithms, applied them to systematically analyze a large project data set collected by the survey, and finally proposed a data-mining-based decision support framework for project performance prediction. To evaluate the potential of the framework, a case study was conducted using data collected from 139 capital projects and analyzed the relationship between use of information technology and project cost performance. The study results showed that the proposed framework has potential to promote fast, easy to use, interpretable, and accurate project data analysis.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Clients and Design-build (DB) contractors are two key stakeholders in DB projects, and contribute significantly to the successful project performance. This study aims to identify and compare such key competences in the construction market of the PRC. After the survey of available literature and face-to-face interviews, a two-round Delphi questionnaire survey was conducted to identify the key competences of clients and DB contractors in DB projects. Relative importance of these identified competences were ranked and compared. The questionnaire results indicated distinct differences between the key competences of clients and that of contractors. The contractor’s key competences emphasize on DB experience, corporate management capability, building and design expertise, financial capability, enterprise qualification and reputation. While the client’s competences focus on the ability to clearly define the project scope & requirements, financial capacity, contract management ability, adequate staff, effective coordination with DB contractor and similar DB experience. Both clients and DB contractors should clearly understand the competence requirements in DB projects and possess all the necessary competences for the successful outcome of DB projects. The identification of these key competences provides clients and DB contractors with indicators to assess their capabilities before going for the DB option. Furthermore, the comparison of competences for clients and DB contractors will result in better understanding of DB system and improve the communication between these stakeholders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Golder Associates Pty Ltd v Challen [2012] QDC 11 Samios DCJ recognised a solicitor’s lien over the file for unpaid fees and confirmed that a lien should not be lightly set aside. The decision, which is under appeal, adds to the range of authorities which are now grappling with some of the provisions of the Legal Profession Act 2007 (Qld) (the LPA) relating to costs billing and assessment. These would appear to have been drafted without a great deal of intellectual rigour (cf. Turner v Mitchells Solicitors [2011] QDC 61 at [26]).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The decision of the Queensland Court of Appeal in King v King demonstrates that in proceedings in Queensland Courts legal practitioners acting pro bono should still consider at the outset whether it is desired to provide for recovery of costs which might be recovered from another party.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A recent District Court case is believed to be the first in Queensland in which UCPR r 5 has been used to support the setting aside of a regularly entered default judgment without a costs order.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Although the Uniform Civil Procedure Rules 1999 (Qld) (UCPR) have always included a power for the court to order a party to pay an amount for costs to be fixed by the court, until recently the power was rarely used in the higher courts. In light of recent practice directions, and the changes to the procedures for assessment of costs contained in the new Chapter 17A of the UCPR, this is no longer the case. The judgment of Mullins J in ASIC v Atlantic 3 Financial (Aust) Pty Ltd [2008] QSC 9 provides some helpful guidance for practitioners about the principles which might be applied.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The judgement in Hennessey Glass and Aluminium Pty Ltd v Watpac Australia Pty Ltd [2007] QDC 57 McGill DCJ provides valuable guidance for practitioners as to whether a range of particular costs items should be permitted on an assessment on the standard basis, and the amounts which should be allowed for such items. The items in issue included counsel’s fees and fees paid to expert witnesses. The decision also examined GST implications for the recovery of legal costs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

IT-supported field data management benefits on-site construction management by improving accessibility to the information and promoting efficient communication between project team members. However, most of on-site safety inspections still heavily rely on subjective judgment and manual reporting processes and thus observers’ experiences often determine the quality of risk identification and control. This study aims to develop a methodology to efficiently retrieve safety-related information so that the safety inspectors can easily access to the relevant site safety information for safer decision making. The proposed methodology consists of three stages: (1) development of a comprehensive safety database which contains information of risk factors, accident types, impact of accidents and safety regulations; (2) identification of relationships among different risk factors based on statistical analysis methods; and (3) user-specified information retrieval using data mining techniques for safety management. This paper presents an overall methodology and preliminary results of the first stage research conducted with 101 accident investigation reports.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article is based on an analysis of narratives of 26 offenders with mental health problems living in the United Kingdom. It explores the impact of an ascribed dangerous status and the construction of the self as moral and responsible in response to this label with reference to the literature on denial, deviance disavowal and other “techniques of neutralization” and Goffman's presentation of self. Two dominant strands are identified in relation to the construction of moral self-hood: “Not my fault” and “Good at heart” narratives. “Techniques of neutralization” are widely drawn on, particularly denial of responsibility in the “Not my fault” narratives that seek to explain anti-social behavior with reference to external forces such as a hostile environment inhibiting their ability to control their lives. In contrast, “Good at heart” narratives draw on the essentially good and moral nature of the inner-self. Both are used as evidence of sharing and adhering to moral norms in order to present an acceptable and credible self.