930 resultados para Trees -- Water requirements -- Queensland
Resumo:
This report is the culmination of a two-stage research project to inform the Australian property and construction industry generally, in addition to providing the Australian Building Codes Board (ABCB) with information to allow it to determine whether or not sustainability requirements are necessary in the Future Building Code of Australia (BCA21). The Australian Building Codes Board is a joint initiative of all levels of government in Australia. The Board’s mission is to provide for efficiency and cost effectiveness in meeting community expectations for health, safety and amenity in the design, construction and use of buildings through the creation of nationally consistent building codes, standards, regulatory requirements and regulatory systems. The Stage 1 (literature review) and Stage 2 (workshops) reports are intended to be read in conjunction with one another. These reports and the Database are provided as appendices. The Conclusions of this, the final report, are the result of the overall program of work.
Resumo:
A worldwide interest is being generated in the use of fibre reinforced polymer composites (FRP) in rehabilitation of reinforced concrete structures. As a replacement for the traditional steel plates or external post-tensioning in strengthening applications, various types of FRP plates, with their high strength to weight ratio and good resistance to corrosion, represent a class of ideal material in external retrofitting. Within the last ten years, many design guidelines have been published to provide guidance for the selection, design and installation of FRP systems for external strengthening of concrete structures. Use of these guidelines requires understanding of a number of issues pertaining to different properties and structural failure modes specific to these materials. A research initiative funded by the CRC for Construction Innovation was undertaken (primarily at RMIT) to develop a decision support tool and a user friendly guide for use of fibre reinforced polymer composites in rehabilitation of concrete structures. The user guidelines presented in this report were developed after industry consultation and a comprehensive review of the state of the art technology. The scope of the guide was mainly developed based on outcomes of two workshops with Queensland Department of Main Roads (QDMR). The document covers material properties, recommended construction requirements, design philosophy, flexural, shear and torsional strengthening of beams and strengthening of columns. In developing this document, the guidelines published on FIB Bulletin 14 (2002), Task group 9.3, International Federation of Structural Concrete (FIB) and American Concrete Institute Committee 440 report (2002) were consulted in conjunction with provisions of the Austroads Bridge design code (1992) and Australian Concrete Structures code AS3600 (2002). In conclusion, the user guide presents design examples covering typical strengthening scenarios.
Resumo:
Deficiencies in the design and operation of office buildings can give rise to high social, environmental and economic (triple bottom line) costs. As a result, there are significant pressures and incentives to develop ‘smart building’ technologies that can facilitate improved indoor environment quality (IEQ), and more energy efficient operation of office buildings. IEQ indicators include lighting, ventilation, thermal comfort, indoor air quality and noise. In response to this, the CRC for Construction Innovation commissioned a six-month scoping study (Project no. 2002-043) to examine how different technologies could be used to improve the ‘triple bottom line’ for office buildings. The study was supported by three industry partners, Bovis Lend Lease, Arup, and The Queensland Department of Public Works. The objective of the study was to look at the history, trends, drivers, new technologies and potential application areas related to the operation of healthy and efficient office buildings. The key output from the study was a recommendation for a prototype system for intelligent monitoring and control of an office environment, based on identified market, technical and user requirements and constraints.
Resumo:
A trip was undertaken to look at concerns of Public Works and Main Roads Departments of Queensland. David Paterson and Wayne Ganther from CSIRO travelled to the Sunshine Coast with Alan Carse of Queensland Department of Main Roads and Michael Ball of Queensland Department of Public Works. We were also joined for part of the visits by Ed Bowers of QBuild which is a commercial unit of Public Works responsible for maintenance of Public Works. During the trip we visited a bridge on the David Low Way at Sunrise Beach near Noosa. This bridge was in a serve marine environment with high salt content in the concrete and corrosion of the galvanised guardrails and barriers. Also the foreshore at Coolum was visited and the use of stainless steel was examined. This is discussed in this report. Most problems stemmed from incorrect specification due to lack of awareness of the severity of the environment. The companion report Visit to Schools Report 2002-059-B No 7. covers the visit to four schools north of Caloundra.
Resumo:
Objectives The objectives of this project were two-fold: • Assess the ease with which current architectural CAD systems supported the use ofparametric descriptions in defining building shape, engineering system performance and cost at the early stages of building design; • Assess the feasibility of implementing a software decision support system that allowed designers to trade-off the characteristics and configuration of various engineering systems to move towards a “global optimum” rather than considering each system in isolation and expecting humans to weigh up all of the costs and benefits. The first stage of the project consisted of using four different CAD systems to define building shells (envelopes) with different usages. These models were then exported into a shared database using the IFC information exchange specifications. The second stage involved the implementation of small computer programs that were able to estimate relevant system parameters based on performance requirements and the constraints imposed by the other systems. These are presented in a unified user interface that extracts the appropriate building shape parameters from the shared database Note that the term parametric in this context refers to the relationships among and between all elements of the building model - not just geometric associations - which will enable the desired coordination.
Resumo:
The Queensland Department of Public Works (QDPW) and the Queensland Department of Main Roads (QDMR) have identified a need for industry e-contracting guidelines in the short to medium term. Each of these organisations conducts tenders and contracts for over $600 million annually. This report considers the security and legal issues relating to the shift from a paper-based tendering system to an electronic tendering system. The research objectives derived from the industry partners include: • a review of current standards and e-tendering systems; • a summary of legal requirements impacting upon e-tendering; • an analysis of the threats and requirements for any e-tendering system; • the identification of outstanding issues; • an evaluation of possible e-tendering architectures; • recommendations for e-tendering systems.
Resumo:
Brisbane Water (BW), a commercialised business arm of Brisbane City Council (BCC) entered into an alliance with a number of organisations from the private sector in order to design, construct, commission and undertake upgrades to three existing wastewater treatment plants located at Sandgate, Oxley Creek, and Wacol in Brisbane. The alliance project is called the Brisbane Water Environmental Alliance (BWEA). This report details the efforts of a team of researchers from the School of Management at Queensland University of Technology to investigate this alliance. This is the second report on this project, and is called Stage 2 of the research. At the time that Stage 2 of the research project was conducted, the BWEA project was nearing completion with a further 8 months remaining before project completion. The aim of this report is to explore individuals’ perceptions of the effectiveness and functioning of the BWEA project in the latter stages of the project. The second aim of this report is to analyse the longitudinal findings of this research project by integrating the findings from Stage 1 and Stage 2 of the project. This long-term analysis of the functioning and effectiveness of the alliance is important because at the current time, researchers have little knowledge of the group developmental processes that occur in large-scale alliances over time. Stage 2 of this research project has a number of aims including assessing performance of the BWEA project from the point of view of a range of stakeholders including the alliance board and alliance management team, alliance staff, and key stakeholders from the client organisation (Brisbane Water). Data were collected using semi-structured interviews with 18 individuals including two board members, one external facilitator, and four staff members from the client organisation. Analysis involved coding the interview transcripts in terms of the major issues that were reported by interviewees.
Resumo:
Policy instruments of education, regulation, fines and inspection have all been utilised by Australian jurisdictions as they attempt to improve the poor performance of occupational health and safety (OH&S) in the construction industry. However, such policy frameworks have been largely uncoordinated across Australia, resulting in differing policy systems, with differing requirements and compliance systems. Such complexity, particularly for construction firms operating across jurisdictional borders, led to various attempts to improve the consistency of OH&S regulation across Australia, four of which will be reviewed in this report. 1. The first is the Occupational Health and Safety Act 1991 (Commonwealth) which enabled certain organisations to opt out of state based regulatory regimes. 2. The second is the development of national standards, codes of practice and guidance documents by the National Occupational Health and Safety Council (NOHSC). The intent was that the OHS requirements, principles and practices contained in these documents would be adopted by state and territory governments into their legislation and policy, thereby promoting regulatory consistency across Australia. 3. The third is the attachment of conditions to special purpose payments from the Commonwealth to the States, in the form of OH&S accreditation with the Office of the Federal Safety Commissioner. 4. The fourth is the development of national voluntary codes of OHS practice for the construction industry. It is interesting to note that the tempo of change has increased significantly since 2003, with the release of the findings of the Cole Royal Commission. This paper examines and evaluates each of these attempts to promote consistency across Australia. It concludes that while there is a high level of information sharing between jurisdictions, particularly from the NOSHC standards, a fragmented OH&S policy framework still remains in place across Australia. The utility of emergent industry initiatives such as voluntary codes and guidelines for safer construction practices to enhance consistency are discussed.
Resumo:
The rate of water reform in Australia is gathering pace with Federal and State initiatives promoting a more integrated approach to water management. This approach encompasses a more competitive environment and a greater role for the private sector. There is a growing recognition of the importance of water recycling in these initiatives and the need to provide opportunities for its development. In March 2008 the Productivity Commission published its discussion paper on urban water reform (Productivity Commission, 2008). The paper cited inadequate institutional arrangements for the management of Australian urban water resources and noted the benefits to be gained from a comprehensive public review of urban water management. This development can be supported through the promotion of a sewer mining industry. This industry, offers flexible and innovative solutions to water recycling demands in a variety of situations and structures. In addition it has the capability of satisfying government competition and private sector policy initiatives.
Resumo:
Recent initiatives around the world have highlighted the potential for information and communications technology (ICT) to foster better service delivery for businesses. Likewise, ICT has also been applied to government services and is seen to result in improved service delivery, improved citizen participation in government, and enhanced cooperation across government departments and between government departments. The Council of Australian Governments (COAG) (2006) identified local government development assessment (DA) arrangements as a ‘hot spot’ needing specific attention, as the inconsistent policies and regulations between councils impeded regional economic activity. COAG (2006) specifically suggested that trials of various ICT mechanisms be initiated which may well be able to improve DA processes for local government. While the authors have explored various regulatory mechanisms to improve harmonisation elsewhere (Brown and Furneaux 2007), the possibility of ICT being able to enhance consistency across governments is a novel notion from a public policy perspective. Consequently, this paper will explore the utility of ICT initiatives to improve harmonisation of DA across local governments. This paper examines as a case study the recent attempt to streamline Development Assessment (DA) in local governments in South East Queensland. This initiative was funded by the Regulation Reduction Incentive Fund (RRIF), and championed by the South East Queensland (SEQ) Council of Mayors. The Regulation Reduction Incentive Fund (RRIF) program was created by the Australian government with the aim to provide incentives to local councils to reduce red tape for small and medium sized businesses. The funding for the program was facilitated through a competitive merit-based grants process targeted at Local Government Authorities. Grants were awarded to projects which targeted specific areas identified for reform (AusIndustry, 2007), in SEQ this focused around improving DA processes and creating transparency in environmental health policies, regulation and compliance. An important key factor to note with this case study is that it is unusual for an eGovernment initiative. Typically individual government departments undertake eGovernment projects in order to improve their internal performance. The RRIF case study examines the implementation of an eGovernment initiative across 21 autonomous local councils in South East Queensland. In order to move ahead, agreement needed to be reached between councils at the highest level. Having reviewed the concepts of eGovernment and eGovernance, the literature review is undertaken to identify the typical cost and benefits, barriers and enablers of ICT projects in government. The specific case of the RRIF project is then examined to determine if similar costs and benefits, barriers and enablers could be found in the RRIF project. The outcomes of the project, particularly in reducing red tape by increasing harmonisation between councils are explored.
Resumo:
Australia’s current pattern of residential development is resulting in urban sprawl and highlights the necessity for development to be more sustainable to avoid unnecessary demand on natural resources and to prevent environmental degradation and to safeguard the environment for future generations. This report summarises the results from a series of cases studies that examined the link between sub-divisional layout and dwelling energy efficiency, the possibility for a lot-rating tool and the potential for on site electricity generation.
Resumo:
The objective of the consultative phase is to examine the role that natural ventilation has and can play in the subdivision planning process in SEQ. The Centre for Subtropical Design at QUT coordinated the consultative phase and has conducted a workshop, and interviews, with stakeholders including developers, land development consultants, land surveyors, urban designers and regulators, to identify current understanding of the impact of urban subdivision on natural ventilation, and the role of natural ventilation in achieving energy efficiency for dwellings. This report details the findings.
Resumo:
Wynne and Schaffer (2003) have highlighted both the strong growth of gambling activity in recent years, and the revenue streams this has generated for governments and communities. Gambling activities and the revenues derived from them have, unsurprisingly, therefore also been seen as a way in which to increase economic development in deprived areas (Jinkner-Lloyd, 1996). Consequently, according to Brown et al (2003), gambling is now a large taxation revenue earner for many western governments, at both federal and state levels, worldwide (for example UK, USA, Australia). In size and importance, the Australian gambling industry in particular has grown significantly over the last three decades, experiencing a fourfold increase in real gambling turnover. There are, however, also concerns expressed about gambling and Electronic Gaming in particular, as illustrated in economic, social and ethical terms in Oddo (1997). There are also spatial aspects to understanding these issues. Marshall’s (1998) study, for example, highlights that benefits from gambling are more likely to accrue at the macro as opposed to the local level, because of centralised tax gathering and spending of tax revenues, whilst localities may suffer from displacement of activities with higher multipliers than the institutions with EGMs that replace them. This also highlights a regional context of costs, where benefits accrue to the centre, but the costs accrue to the regions and localities, as simultaneously resources leave those communities through both the gambling activities themselves (in the form of revenue for the EGM owners), and the government (through taxes).