992 resultados para Situation Monitoring


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Human use of water resow-ces in Uganda has grown and intensified along with population growth and increasing demand to meet the diverse human needs. In the case of Uganda's rivers, the main uses include fisheries, hydropower generation, abstraction for potable water supply, discharge of sewage and navigation. All these uses can disrupt the integrity of the aquatic ecosystem and may affect the survival of the diversity of organisms. In consideration of the need to increase electricity to meet demand, the Bujagali Hydro-power Project (BHPP) and the National Environment Management Authority (NEMA) recognised the importance of safeguards to mitigate impacts of the project. The National Fisheries Resources Research Institute (NaFIRRI) was assigned the role of providing baseline information on the aquatic ecosystem of the Upper Victoria Nile and to follow up the findings with a monitoring framework during construction and post-commissioning phases.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The results reported on were from a monitoring survey No.7 undertaken between 4 th and 7th September 2010 during construction period of the Bujagali Hydropower Project (BHPP). Two pre-construction, baseline surveys in April 2000 and April 2006 were conducted and so far, during construction phase of the project, six monitoring surveys have been undertaken i.e. in September 2007, April 2008, April 2009, October 2009, April 2010 and the present one, in September 2010. Since 2009 biannual monitoring surveys have been conducted at an upstream and a downstream transect of the BHPP with emphasis on the following aspects: I. water quality determinants 2. biology and ecology of fishes and food webs 3. fish stock and fish catch including economic aspects of catch and 4. sanitation/vector studies (bilharzias and river blindness)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bujagali hydropower dam construction is now completed and a reservoir behind the dam has been created, extending all the way up to Kalange-Makwanzi, an upstream transects. During the 10th monitoring survey-April 2012, a third transect was established in the mid of the reservoir where it runs up to 30 m deep and sampled similarly as at the two original sampling transects, Kalange-Makwanzi and Buyala-Kikubamutwe for comparative purposes. This monitoring survey No. 12 undertaken between 25th and 30th April 2013 is the third one to be conducted after completion of construction of Bujagali Hydropower Dam. Two pre-construction baseline surveys in April 2000 and April 2006 were conducted and during construction phase, eight monitoring surveys (September 2007, April 2008, April 2009, October 2009, April 2010, September 2010, April 2011, September 2011) were conducted. Since 2009 biannual monitoring surveys have been conducted at an upstream and a downstream transect of the BHPP with emphasis on the following aspects: water quality determinants, biology and ecology of fishes and food webs, fish stock and fish catch including economic aspects of catch and sanitation/vector studies (bilharzias and river blindness). In the post-construction monitoring surveys, the assessments of algae, zooplankton and benthic macro-invertebrates which had been restrained since April 2008 were also included.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The survey covered by this report was undertaken between 3rd and 7th April 2009 as a follow-up on the during construction surveys. Two pre-construction baseline surveys were undertaken in April 2000 and April 2006. During the construction phase which started in 2007, three surveys including the current one have been undertaken i.e. in September 2007, April 2008 and the present one, in April 2009. Unlike in all previous surveys in which monitoring was conducted at one transect upstream and three downstream transects, in the current survey, two transects, one upstream and the other,downstream of the BHPP were sampled with emphasis on the following aspects: 1. water quality determinants 2. biology and ecology of fishes and food webs 3. fish stock and fish catch including economic aspects of catch and 4. sanitation/vector studies (bilharzias and river blindness)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Gill-netting and rotenoning have been used for assessing and monitoring fish stock abundance in Volta Lake. The lake and the main gear types used on it have been described. Before a gill-net sampling plan was set up, a preliminary survey was undertaken which largely determined the final form of the plan. An investigation as to whether or not the lake was being overfished concluded that it was being underfished. Commercial and experimental catch data analyses disclosed that the adults of the small species were being little utilized. Commercial sized species were also not being harvested according to their apparent proportion in the population. Production is presently fluctuating between approximately 37,000 and 40,000 tonnes. A high correlation between commercial and experimental catch was realized. Developments which have followed in the wake of stock assessment and monitoring studies include: introduction of monofilament nylon net, development of a special scoop net to permit mass harvest of clupeids after they have been attracted to light, and the design of a larger canoe which would help to extend the fishery into open water. New regulation and management policies will have to be formulated in the light of new findings before a rational exploitation of all the species can be achieved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Developments in Micro-Electro-Mechanical Systems (MEMS), wireless communication systems and ad-hoc networking have created new dimensions to improve asset management not only during the operational phase but throughout an asset's lifecycle based on using improved quality of information obtained with respect to two key aspects of an asset: its location and condition. In this paper, we present our experience as well as lessons learnt from building a prototype condition monitoring platform to demonstrate and to evaluate the use of COTS wireless sensor networks to develop a prototype condition monitoring platform with the aim of improving asset management by providing accurate and real-time information. © 2010 IEEE.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Vibration methods are used to identify faults, such as spanning and loss of cover, in long off-shore pipelines. A pipeline `pig', propelled by fluid flow, generates transverse vibration in the pipeline and the measured vibration amplitude reflects the nature of the support condition. Large quantities of vibration data are collected and analyzed by Fourier and wavelet methods.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The first monolithically integrated 44 switch with power monitoring function using on-chip PIN photodiodes is reported. Using 10Gb/s signals, under active power control an IPDR of 12dB for a 1dB power penalty is achieved. © 2012 OSA.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There are several reasons for monitoring of underground structures and they have already been discussed many times, e.g. from the view of ageing or state after accidental event like flooding of Prague metro in 2002. Monitoring of Prague metro is realized in the framework of international research project sponsored by ESF-S3T. The monitoring methods used in Prague are either classical one or new or developing one. The reason for different monitoring methods is the different precision of each method and also for cross-checking between them and their evaluation. Namely we use convergence, tiltmetres, crackmetres, geophysical methods, laser scanning, computer vision and finally installation of MEMS monitoring devices. In the paper more details of each method and obtained results will be presented. The monitoring methods are complemented by wireless data collection and transfer for real-time monitoring. © 2012 Taylor & Francis Group.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Advances in the development of computer vision, miniature Micro-Electro-Mechanical Systems (MEMS) and Wireless Sensor Network (WSN) offer intriguing possibilities that can radically alter the paradigms underlying existing methods of condition assessment and monitoring of ageing civil engineering infrastructure. This paper describes some of the outcomes of the European Science Foundation project "Micro-Measurement and Monitoring System for Ageing Underground Infrastructures (Underground M3)". The main aim of the project was to develop a system that uses a tiered approach to monitor the degree and rate of tunnel deterioration. The system comprises of (1) Tier 1: Micro-detection using advances in computer vision and (2) Tier 2: Micro-monitoring and communication using advances in MEMS and WSN. These potentially low-cost technologies will be able to reduce costs associated with end-of-life structures, which is essential to the viability of rehabilitation, repair and reuse. The paper describes the actual deployment and testing of these innovative monitoring tools in tunnels of London Underground, Prague Metro and Barcelona Metro. © 2012 Taylor & Francis Group.