877 resultados para Service Improvement and Innovation
Resumo:
The strategic plan for bridge engineering issued by AASHTO in 2005 identified extending the service life and optimizing structural systems of bridges in the United States as two grand challenges in bridge engineering, with the objective of producing safer bridges that have a minimum service life of 75 years and reduced maintenance cost. Material deterioration was identified as one of the primary challenges to achieving the objective of extended life. In substructural applications (e.g., deep foundations), construction materials such as timber, steel, and concrete are subjected to deterioration due to environmental impacts. Using innovative and new materials for foundation applications makes the AASHTO objective of 75 years service life achievable. Ultra High Performance Concrete (UHPC) with compressive strength of 180 MPa (26,000 psi) and excellent durability has been used in superstructure applications but not in geotechnical and foundation applications. This study explores the use of precast, prestressed UHPC piles in future foundations of bridges and other structures. An H-shaped UHPC section, which is 10-in. (250-mm) deep with weight similar to that of an HP10×57 steel pile, was designed to improve constructability and reduce cost. In this project, instrumented UHPC piles were cast and laboratory and field tests were conducted. Laboratory tests were used to verify the moment-curvature response of UHPC pile section. In the field, two UHPC piles have been successfully driven in glacial till clay soil and load tested under vertical and lateral loads. This report provides a complete set of results for the field investigation conducted on UHPC H-shaped piles. Test results, durability, drivability, and other material advantages over normal concrete and steel indicate that UHPC piles are a viable alternative to achieve the goals of AASHTO strategic plan.
Resumo:
This paper analyses the optimal worksharing discount granted to mailers and entrants in a liberalized sector when there is asymmetric information about the Post Office's cost. When the regulator is unable to ascertain which part of total cost of sorting has to be attributed to each sorting facility, the optimal 'accesss discount' given to the entrants is set in a pro-competitive way, thus facilitating the entry of firms that are less afficient than the Post Office. Howerver, with the same asymmetry of information, the optimal 'worksharing discount' given to the mailers is set to favor the Post Office, even when it is less efficient than the mailers in providing the sorting.
Resumo:
[cat] Com afecten l’obertura comercial i financera a la volatilitat macroeconòmica? La literatura existent, tant empírica com teòrica, no ha assolit encara un consens. Aquest article usa un model microfonamentat de dos països simètrics amb entrada endògena d’empreses per estudiar-ho. L’anàlisis es du a terme per tres règims econòmics diferents amb diferents nivells d’integració internacional: una economia tancada, una autarquia financera i una integració plena. Es consideren diversos nivells d’obertura comercial, en forma de biaix domèstic de la demanda i l’economia pot patir pertorbacions en la productivitat del treball i en innovació. El model conclou que la incertesa macroeconòmica, representada principalment per la volatilitat del consum, la producció i la relació real d’intercanvi internacional, depèn del grau d’obertura i del tipus de pertorbació.
Resumo:
[spa] Este informe presenta parte de los procesos y los resultados del proyecto de I+D+I: Políticas y prácticas en torno a las TIC en la enseñanza obligatoria: Implicaciones para la innovación y la mejora, parcialmente financiado por Ministerio de Ciencia e Innovación. SEJ2007-67562. Recoge los cuatro estudios de caso llevados a cabo en dos Institutos de Enseñanza Secundaria Obligatoria y dos centros de educación primaria de Cataluña, que nos han posibilitado elucidar el impacto de las políticas de uso de las TIC y de otras iniciativas políticas para favorecer la innovación y la mejora en cada centro, prestando especial atención a: (a) los temas organizativos relacionados con el tiempo y el espacio; (b) el desarrollo del currículum en el centro (visiones sobre el conocimiento, el aprendizaje, el papel del alumnado y el profesorado, el lugar de las TIC, etc.); (c) las condiciones de trabajo del profesorado (acceso a formación, espacios y prácticas de colaboración; desarrollo profesional); (d) los resultados del aprendizaje (valor intelectual, social y personal de lo aprendido; capacidad de transferencia para seguir aprendiendo
Resumo:
BACKGROUND: We aimed to determine the smallest changes in health-related quality of life (HRQoL) scores in the European Organisation for Research and Treatment of Cancer Quality of Life Questionnaire core 30 and the Brain Cancer Module (QLQ-BN20), which could be considered as clinically meaningful in brain cancer patients. Materials and methods: World Health Organisation performance status (PS) and mini-mental state examination (MMSE) were used as clinical anchors appropriate to related subscales to determine the minimal clinically important differences (MCIDs) in HRQoL change scores (range 0-100) in the QLQ-C30 and QLQ-BN20. A threshold of 0.2 standard deviation (SD) (small effect) was used to exclude anchor-based MCID estimates considered too small to inform interpretation. RESULTS: Based on PS, our findings support the following integer estimates of the MCID for improvement and deterioration, respectively: physical (6, 9), role (14, 12), and cognitive functioning (8, 8); global health status (7, 4*), fatigue (12, 9), and motor dysfunction (4*, 5). Anchoring with MMSE, cognitive functioning MCID estimates for improvement and deterioration were (11, 2*) and for communication deficit were (9, 7). Estimates with asterisks were <0.2 SD and were excluded from our MCID range of 5-14. CONCLUSION: These estimates can help clinicians evaluate changes in HRQoL over time, assess the value of a health care intervention and can be useful in determining sample sizes in designing future clinical trials.
Resumo:
[spa] Este informe presenta parte de los procesos y los resultados del proyecto de I+D+I: Políticas y prácticas en torno a las TIC en la enseñanza obligatoria: Implicaciones para la innovación y la mejora, parcialmente financiado por Ministerio de Ciencia e Innovación. SEJ2007-67562. Recoge los cuatro estudios de caso llevados a cabo en dos Institutos de Enseñanza Secundaria Obligatoria y dos centros de educación primaria de Cataluña, que nos han posibilitado elucidar el impacto de las políticas de uso de las TIC y de otras iniciativas políticas para favorecer la innovación y la mejora en cada centro, prestando especial atención a: (a) los temas organizativos relacionados con el tiempo y el espacio; (b) el desarrollo del currículum en el centro (visiones sobre el conocimiento, el aprendizaje, el papel del alumnado y el profesorado, el lugar de las TIC, etc.); (c) las condiciones de trabajo del profesorado (acceso a formación, espacios y prácticas de colaboración; desarrollo profesional); (d) los resultados del aprendizaje (valor intelectual, social y personal de lo aprendido; capacidad de transferencia para seguir aprendiendo
Resumo:
Welfare states are often reduced to their role as providers of social protection and redistribution. In 1990, Esping-Andersen argued that they also affect employment creation and the class structure. We analyse the stratification outcomes for three welfare regimes - Britain, Germany and Denmark - over the 1990s and 2000s. Based on individual-level surveys, we observe a disproportionate increase among professionals and managers, and a decline among production workers and clerks. The result is clear-cut occupational upgrading in Denmark and Germany. In Britain, high and low-end service jobs expanded, resulting in a polarized version of upgrading. Growth in low-end service jobs - and thus polarization - is no precondition for full employment. Both Britain and Denmark halved their low-educated unemployment rate between 1995 and 2008. Yet low-end service jobs expanded only in Britain, not in Denmark. The cause is the evolution of labour supply: rising educational attainment means that fewer low-educated workers look for low-skilled jobs.
Resumo:
This report aims to analyse how European accounting standards (European System of Accounts ESA-95) are interpreted and applied to the public healthcare sector, from the standpoint of comparative law. Specifically, the study focuses on the application of ESA-95 to healthcare centres in the United Kingdom, France and Germany, with the aim of reaching useful conclusions for the Public Companies and Consortia (EPIC, for their initials in Catalan) in the Catalan Public Healthcare System.
Resumo:
The strategic plan for bridge engineering issued by AASHTO in 2005 identified extending the service life and optimizing structural systems of bridges in the United States as two grand challenges in bridge engineering, with the objective of producing safer bridges that have a minimum service life of 75 years and reduced maintenance cost. Material deterioration was identified as one of the primary challenges to achieving the objective of extended life. In substructural applications (e.g., deep foundations), construction materials such as timber, steel, and concrete are subjected to deterioration due to environmental impacts. Using innovative and new materials for foundation applications makes the AASHTO objective of 75 years service life achievable. Ultra High Performance Concrete (UHPC) with compressive strength of 180 MPa (26,000 psi) and excellent durability has been used in superstructure applications but not in geotechnical and foundation applications. This study explores the use of precast, prestressed UHPC piles in future foundations of bridges and other structures. An H-shaped UHPC section, which is 10-in. (250-mm) deep with weight similar to that of an HP10×57 steel pile, was designed to improve constructability and reduce cost. In this project, instrumented UHPC piles were cast and laboratory and field tests were conducted. Laboratory tests were used to verify the moment-curvature response of UHPC pile section. In the field, two UHPC piles have been successfully driven in glacial till clay soil and load tested under vertical and lateral loads. This report provides a complete set of results for the field investigation conducted on UHPC H-shaped piles. Test results, durability, drivability, and other material advantages over normal concrete and steel indicate that UHPC piles are a viable alternative to achieve the goals of AASHTO strategic plan.
Resumo:
Recent data compiled by the National Bridge Inventory revealed 29% of Iowa's approximate 24,600 bridges were either structurally deficient or functionally obsolete. This large number of deficient bridges and the high cost of needed repairs create unique problems for Iowa and many other states. The research objective of this project was to determine the load capacity of a particular type of deteriorating bridge – the precast concrete deck bridge – which is commonly found on Iowa's secondary roads. The number of these precast concrete structures requiring load postings and/or replacement can be significantly reduced if the deteriorated structures are found to have adequate load capacity or can be reliably evaluated. Approximately 600 precast concrete deck bridges (PCDBs) exist in Iowa. A typical PCDB span is 19 to 36 ft long and consists of eight to ten simply supported precast panels. Bolts and either a pipe shear key or a grouted shear key are used to join adjacent panels. The panels resemble a steel channel in cross-section; the web is orientated horizontally and forms the roadway deck and the legs act as shallow beams. The primary longitudinal reinforcing steel bundled in each of the legs frequently corrodes and causes longitudinal cracks in the concrete and spalling. The research team performed service load tests on four deteriorated PCDBs; two with shear keys in place and two without. Conventional strain gages were used to measure strains in both the steel and concrete, and transducers were used to measure vertical deflections. Based on the field results, it was determined that these bridges have sufficient lateral load distribution and adequate strength when shear keys are properly installed between adjacent panels. The measured lateral load distribution factors are larger than AASHTO values when shear keys were not installed. Since some of the reinforcement had hooks, deterioration of the reinforcement has a minimal affect on the service level performance of the bridges when there is minimal loss of cross-sectional area. Laboratory tests were performed on the PCDB panels obtained from three bridge replacement projects. Twelve deteriorated panels were loaded to failure in a four point bending arrangement. Although the panels had significant deflections prior to failure, the experimental capacity of eleven panels exceeded the theoretical capacity. Experimental capacity of the twelfth panel, an extremely distressed panel, was only slightly below the theoretical capacity. Service tests and an ultimate strength test were performed on a laboratory bridge model consisting of four joined panels to determine the effect of various shear connection configurations. These data were used to validate a PCDB finite element model that can provide more accurate live load distribution factors for use in rating calculations. Finally, a strengthening system was developed and tested for use in situations where one or more panels of an existing PCDB need strengthening.
Resumo:
The Board, codified in Chapter 466A, is an independent, self-governing body directed to award grants for water quality improvement and flood prevention in the state. The Board is authorized to request applications from soil and water conservation districts, local watershed improvement committees, public water supply utilities, counties, county conservation boards and cities and award grants to these entities. These grants are issued from the Watershed Improvement Fund. Annual appropriations of $5 million plus interest earned on the Watershed Improvement Fund allowed the Board to issue two Request For Applications in 2009. On February 27, the Board awarded grants to seven applicants for a total of $2,366,861. On September 21, the Board awarded grants to thirteen applicants for a total of $5,120,832. In addition to providing environmental benefits, these implementation projects stimulate economic recovery and create jobs through the purchasing oflocal goods and services.
Resumo:
The Board, codified in Chapter 466A, is an independent, self-governing body directed to award grants for water quality improvement and flood prevention in the state. The Board is authorized to request applications from soil and water conservation districts, local watershed improvement committees, public water supply utilities, counties, county conservation boards and cities and award grants to these entities. These grants are issued from the Watershed Improvement Fund. Annual appropriations plus interest earned on the Watershed Improvement Fund allowed the Board to issue three Request For Applications in 2010. On February 19, the Board awarded grants to five applicants for a total of $1,647,600. On July 23, the Board awarded grants to five applicants for a total of $796,500. Finally, on November 5, the Board awarded grants to eight applicants for a total of $1,203,500.
Resumo:
The Board, codified in Chapter 466A, is an independent, self-governing body directed to award grants for water quality improvement and flood prevention in the state. The Board is authorized to request applications from soil and water conservation districts, local watershed improvement committees, public water supply utilities, counties, county conservation boards and cities and award grants to these entities. These grants are funded by the Watershed Improvement Fund. Although no appropriation was received in FY2012, returned funds from some prior years' grants plus interest earned on the Watershed Improvement Fund allowed the Board to issue one Request For Applications in 2011. On September 9, the Board awarded grants to eight applicants for a total of $1,506,309. In addition to providing environmental benefits, these implementation projects stimulate economic recovery, empower local groups to improve water quality and create jobs through the purchase oflocal goods and services.
Resumo:
The Board, codified in Chapter 466A, is an independent, self-goveming body directed to award grants for water quality improvement and flood prevention in the state. The Board is authorized to request applications from soil and water conservation districts, local watershed improvement committees, public water supply utilities, counties, county conservation boards and cities and award grants to these entities. These grants are funded by the Watershed Improvement Fund. Annual appropriations, funds from the Animal Agriculture Compliance Fund Penalties, canyover funds plus interest earned on the Watershed Improvement Fund allowed the Board to issue a Request For Applications from June 15 to July 27,2012. On August 17, the Board awarded grants to twelve applicants for a total of $946,952. In addition to providing environmental benefits, these implementation projects stimulate economic recovery and create jobs through the purchasing of local goods and services. A second Request For Applications was open from October 9 to December 14, 2012. Applications from this request will be reviewed in February 2013.
Resumo:
Managing existing and newly constructed highway corridors has recently become a significant concern in many states, including Iowa. As urban land and land on the urban fringe develops, there is pressure to add features such as commercial driveways, at-grade public road intersections, and traffic signals to arterial highway routes that should primarily serve high-speed traffic. This diminishes the speed and traffic capacity of such roadways and can also cause significant safety issues. if mobility and safety are diminished, the value of the highway investment is diminished. Since a major highway corridor improvement may cost tens of millions of dollars or more, corridor management is as critical to preserving that investment as is more "hard side" management practices such as pavement or bridge management. Corridor management is a process that applies access management principles to highway corridors in an attempt to balance the competing needs of traffic service, safety, and support for land development. This project helped to identify routes that should be given high priority for corridor management. The pilot study in the form of two corridor management case studies provides an analytical process that can be replicated along the other Iowa commuting corridors using commonly available transportation and land use data resources. It also offers a general set of guidelines for the Iowa Department of Transportation to use in the development of its own comprehensive corridor management program.