998 resultados para North Branch (Mich.)
Resumo:
In order to develop a strategic plan that will guide their priorities and resource allocation for 2018-2021, North Carolina Sea Grant has implemented a multi-stage process designed to increase stakeholder engagement and to better assess and serve the coastal priorities of North Carolinians. This project explores strengths and potential areas for improvement within NC Sea Grant’s planning process with a specific focus on maximizing stakeholder engagement. By interviewing staff, observing focus groups, and creating a survey instrument for public distribution, we developed a set of recommendations highlighting the ways that NC Sea Grant can better facilitate inclusion of stakeholder, public, and staff input in its strategic planning process, such as holding some stakeholder events outside of typical business hours and discussing ways to incorporate diversity into the strategic plan.
Resumo:
Review of: Janis, C.M., Scott, K.M., & Jacobs, L.L. (eds.) 1998. Evolution of Tertiary Mammals of North America Volume 1: Terrestrial Carnivores, Ungulates, and Ungulatelike Mammals, i-x, 1491. Cambridge University Press, Cambridge, UK. £165
Resumo:
This paper concerns a preliminary numerical simulation study of the evacuation of the World Trade Centre North Tower on 11 September 2001 using the buildingEXODUS evacuation simulation software. The analysis makes use of response time data derived from a study of survivor accounts appearing in the public domain. While exact geometric details of the building were not available for this study, the building geometry was approximated from descriptions available in the public domain. The study attempts to reproduce the events of 11 September 2001 and pursue several ‘what if’ questions concerning the evacuation. In particular, the study explores the likely outcome had a single staircase survived in tact from top to bottom.
Resumo:
This work explores the impact of response time distributions on high-rise building evacuation. The analysis utilises response times extracted from printed accounts and interviews of evacuees from the WTC North Tower evacuation of 11 September 2001. Evacuation simulations produced using these “real” response time distributions are compared with simulations produced using instant and engineering response time distributions. Results suggest that while typical engineering approximations to the response time distribution may produce reasonable evacuation times for up to 90% of the building population, using this approach may underestimate total evacuation times by as much as 61%. These observations are applicable to situations involving large high-rise buildings in which travel times are generally expected to be greater than response times
Resumo:
This article concerns an investigation of the full scale evacuation of a building with a configuration similar to that of the World Trade Center (WTC) North Tower using computer simulation. A range of evacuation scenarios is explored in order to better understand the evacuation of the WTC on 11 September 2001. The analysis makes use of response time data derived from a study of published WTC survivor accounts. Geometric details of the building are obtained from architects' plans while the total building population used in the scenarios is based on estimates produced by the National Institute of Standards and Technology formal investigation into the evacuation. This paper attempts to approximate the events of 11 September 2001 and pursue several `what if' questions concerning the evacuation. In particular, the study explores the likely outcome had a single staircase survived intact from top to bottom. More generally, this paper explores issues associated with the practical limits of building size that can be expected to be efficiently evacuated using stairs alone.
Resumo:
Despite being exposed to the harsh sea-spray environment of the North Sea at Arbroath, Scotland, for over 63 years, many of the reinforced concrete precast beam elements of the 1.5 km long promenade railing are still in very good condition and show little evidence of reinforcement corrosion. In contrast, railing replacements constructed in about 1968 and in 1993 are almost all badly cracked as a result of extensive corrosion of the longitudinal reinforcement. This is despite the newer concrete appearing to be of better quality than the 1943 concrete. Statistics for maximum crack width for each of the three populations, based on measurements made in 2004 and in 2006, are presented. In situ and laboratory measurements show that the 1943 concrete appears to have high permeability but it also shows high electrical resistivity. Chloride penetration measurements show the 1943 and 1993 concretes to have similar chloride profiles and similar chloride concentrations at the reinforcement bars. This is inconsistent with the 1943 beams showing much less reinforcement corrosion than their later replacements and casts doubt on the conventional practice for durability design focusing on reducing concrete permeability through denser concretes or greater cover.
Resumo:
The spillway of Lake Waxahachie, Ellis County (Texas), exposes a > 17 m section of the Hutchins Member of the Austin Chalk Group, un-conformably overlain by Taylor Clay. The Austin sequence was regarded as a potential Global Stratotype Section for the base of the Campanian Stage at the 1995 Brussels meeting on Cretaceous Stage boundaries, with the last occurrence of the crinoid Marsupites testudinarius (von Schlotheim, 1820) as the potential boundary marker. An integrated study of the geochemistry, stable carbon and oxgen isotopes, nannofossils, planktonic foraminifera, inoceramid bivalves, ammonites and crinoids of this section place the last occurrence of M. testudinarius in a matrix of eighteen ancillary biostratigraphic markers, while the boundary can also be recognised on the basis of a delta C-13 excursion that can, in principle, be detected globally in marine sediments. A new forma of the crinoid Marsupites testudinarius is introduced. The Waxahachie section fulfils sufficient geological criteria as to be an excellent candidate GSSP for the base of the Campanian Stage, if problems of ownership and access to the section can be resolved.
Resumo:
This paper describes the condition of a reinforced concrete balustrade consisting of some 1000 individual beam elements all exposed similarly to the hostile marine environment of the North Sea at Arbroath, Scotland since 1943. A comparison is made of the condition of the original construction with the condition of repairs carried out in 1968 and in 1993. It is shown that the 1943 construction shows very little corrosion-induced cracking and little rust staining even though it does not appear to be of high construction quality. Only a very low percentage of the balustrade beams have been replaced. In contrast the beam installed in 1968 and later in 1993 show very considerable and large concrete cracks directly attributable to the corrosion of the longitudinal reinforcement, even though the concrete is of a higher quality and density. A detailed condition survey and statistics of crack sizes are presented in the paper. It is found that the higher corrosion resistance of the 1943 concrete is generally consistent with the concrete electrical resistivity measurements but the degree of corrosion of the reinforcing bars is inconsistent with chloride penetration measurements. The results are compared with the very few observations available in the literature for ageing concrete structures in marine environments. The results cast doubt on the conventional wisdom that chloride content at the reinforcement correlates well with reinforcement corrosion.
Resumo:
This covers the relation of size to sexual maturity in Pleuronectids, the destruction of immature fish in the North Sea and proposed remedial measures.