958 resultados para Management|Environmental management|Civil engineering


Relevância:

100.00% 100.00%

Publicador:

Resumo:

World Heritage Landscapes (WHLs) are receiving increased attention from researchers, urban planners, managers, and policy makers and many heritage values and resources are becoming irreversibly lost. This phenomenon is especially prominent for WHLs located in cities, where greater development opportunities are involved. Decision making for sustainable urban landscape planning, conservation and management of WHLs often takes place from an economic perspective, especially in developing countries. This, together with the uncertain source of funding to cover WHL operating and maintenance costs, has resulted in many urban managers seeking private sector funding either in the form of visitor access fees or leasing part of the site for high-rental facilities such as five star hotels, clubs and expensive restaurants. For the former, this can result in low-income urban citizens being unable to afford the access fees and hence contradicting the principle of equal access for all; while, for the latter, the principle of open access for all is equally violated. To resolve this conflict, a game model is developed to determine how urban managers should allocate WHL spaces to maximize the combination of economic, social and ecological benefits and cultural values. A case study is provided of the Hangzhou's West Lake Scenic Area, a WHL located at the centre of Hangzhou city, in which several high-rental facilities have recently been closed down by the local authorities due to charges of elitism and misuse of public funds by government officials. The result shows that the best solution is to lease a small space with high rents and leave the remainder of the site to the public. This solution is likely to be applicable only in cities with a strong economy.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With the increase in complexity of engineering projects and design quality in the construction industry, the traditional two-dimensional "Information Island" approach to design is becoming less able to meet current design needs due to its lack of coordination and information sharing. Collaborative design using a Build Information Modeling (BIM) technology platform promises to provide an effective means of designing and communicating through networking and real-time data sharing. This paper first analyzes the shortcomings of the two-dimensional design process and the potential application of collaborative design. By combining the attributes of BIM, a preliminary BIM-based building design collaborative platform is developed to improve the design approach and support a more collaborative design process. A real-life case is presented to demonstrate the feasibility and validity of the platform and its use in practice. From this, it is shown that BIM has the potential to realize effective information sharing and reduce errors, thereby improving design quality. The BIM-based building design collaborative platform presented is expected to provide the support needed for the extensive application of BIM in collaborative design and promote a new attitude to project management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction workforce in Hong Kong is experiencing a severe ageing problem and labour shortage. One initiative to enhance the supply of manpower is to assist ethnic minorities joining the industry. It is foreseeable that the percentage of ethnic minorities in the construction workforce will keep increasing. Statistics show that ethnic minorities were nearly 30% more likely to have work-related injuries than local workers in some developed countries. However, official statistics on the safety of ethnic minorities are not available in Hong Kong. A search in newspaper archive revealed that ethnic minorities in the construction industry of Hong Kong are subjected to higher fatality rate than local workers, just as is the case in many developed countries. This reflects that the safety of ethnic minorities has not received the attention it rightly deserves. Safety communication has been one of the key factors leading to accidents. Safety communication barriers of ethnic minorities impede them from receiving safety training and acquiring safety information effectively. Research towards improving the safety communication of ethnic minorities in the construction industry of Hong Kong becomes more urgent. This paper will provides an initial report on a research project which focuses on improving the safety communication of ethnic minorities in the construction industry of Hong Kong. Quantitative and qualitative research methods including Social Network Analysis (SNA) applied in conducting the research are first discussed. Preliminary statistics of construction accidents related to ethnic minorities in Hong Kong are then presented.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The literature advocates more widespread adoption of a particular type of house – a manufactured high performance green house and/or house components (MHPGH) and this is the focus of the research proposal outlined in this conceptual paper. The aim of the current paper is to outline a robust program of work to improve adoption of MHPGH. The contribution of houses to climate change is investigated, the conservatism of the construction industry is documented, a conceptual framework through which to understand the problem is presented; a program of research to bring about change is outlined; and the benefits of doing so are summarised. The contribution of the paper is the presentation of novel theory and methods to address sustainability problems in the construction industry. Future work will involve execution of the proposal. A limitation of the paper is that the effectiveness of the proposed theory and methods are yet to be tested.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose To examine the implementation of quality management systems (QMSs) of Grade 7 (G-7) Indonesian construction companies. This includes the initial motives that have driven the development of QMSs, barriers to effective QMS implementation, the current practice and integration of QMS-ISO 9001 principles and elements, and the performance of contractors implementing such QMSs. Design/methodology/approach A survey was conducted involving 403 respondents (Quality Management Representatives, Managers, and Project and Site Engineers) from 77 G-7 as well as ISO 9001 certified Indonesian construction companies. Findings The main motive for G-7 contractors in establishing and implementing ISO 9001 based QMSs are identified as being to effectively and efficiently control project activities. Respondents apparently do not often experience problems related to QMS implementation. However, issues of management attitude and purpose are identified as barriers that may affect effective QMS implementation. The study highlights the ISO 9001 principles and elements that still require to be more critically applied by G-7 contractors in order to fully implement and improve their current QMS effectiveness. The findings also suggest that, although certified, many G-7 contractors have not yet achieved a satisfactory level of performance to be truly competitive in global markets outside Indonesia. Originality/value To date, only limited research has been conducted into the application of ISO 9001 in the Indonesian construction industry. The research findings reinforced the value of pursuing more effective QMS implementation. They also support current attempts to introduce ISO 9001 QMSs to a much wider base of Indonesian construction companies, particularly small and medium sized contractors and builders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Identifying appropriate decision criteria and making optimal decisions in a structured way is a complex process. This paper presents an approach for doing this in the form of a hybrid Quality Function Deployment (QFD) and Cybernetic Analytic Network Process (CANP) model for project manager selection. This involves the use of QFD to translate the owner's project management expectations into selection criteria and the CANP to weight the expectations and selection criteria. The supermatrix approach then prioritises the candidates with respect to the overall decision-making goal. A case study is used to demonstrate the use of the model in selecting a renovation project manager. This involves the development of 18 selection criteria in response to the owner's three main expectations of time, cost and quality.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose Knowledge-based urban development (KBUD) has been an effective strategy and an opportunity for emerging economies for catching up with the developed economies. The paper aims to investigate and provide insights on KBUD in the context of emerging economies. Design/methodology/approach The paper scrutinizes the Multimedia Super Corridor of Malaysia (MSC) by focusing on the planning, development and orchestration of the knowledge corridor. Findings The paper reveals a number of lessons and insights drawn from the development of MSC as the largest manifestation of KBUD initiative in Malaysia. Originality/value The paper provides lessons and recommendations on the planning, development and management of KBUD for emerging economies that are seeking a prosperous development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

While the philosophical motivation behind Civil Infrastructure Management Systems is to achieve optimal level of service at a minimum cost, the allocation of scarce resources among competing alternatives is still a matter of debate. It appears to be widely accepted that results from tradeoff analysis can be measured by the degree of accomplishment of the objectives. Road management systems not only deal with different asset types but also with conflicting objectives. This paper presents a case study of lifecycle optimization with tradeoff analysis for a road corridor in New Brunswick. Objectives of the study included condition of bridge and roads and road safety. A road safety index was created based on potential for improvement. Road condition was based on roughness, rutting and cracking. Initial results show lack of sustainability in bridge performance. Therefore, bridges where broken by components: deck, superstructure and substructure. Visual inspections, in addition to construction age of each bridge, were combined to generate a surrogate apparent age. Two life cycle analysis were conducted; one aimed to minimize overall cost while achieving sustainable results and another one purely for optimization. -used to identify required levels of budget. Such analyses were used to identify the minimum required budget and to demonstrate that with the same amount of money it was possible to achieve better levels of performance. Dominance and performance driven criteria were combined to identify and select an optimal result. It was found that achievement of optimally sustained results is conditioned by the availability of treatments for all asset classes at across their life spans. For the case study a disaggregated bridge condition index was introduced to the original algorithm to attempt to achieve sustainability in all bridges components, however lack of early stage treatments for substructures produce declining trends for such a component.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Successful management of design changes is critical for the efficient delivery of construction projects. Building Information Modeling (BIM) is envisioned to play an important role in integrating design, construction and facility management processes through coordinated changes throughout the project life-cycle. BIM currently provides significant benefits in coordinating changes across different views in a single model, and identifying conflicts between different discipline-specific models. However, current BIM tools provide limited support in managing changes across several discipline-specific models. This paper describes an approach to represent, coordinate, and track changes within a collaborative multi-disciplinary BIM environment. This approach was informed by a detailed case study of a large, complex, fast-tracked BIM project where we investigated numerous design changes, analyzed change management processes, and evaluated existing BIM tools. Our approach characterises design changes in an ontology to represent changed component attributes, dependencies between components, and change impacts. It explores different types of dependencies amongst different design changes and describes how a graph based approach and dependency matrix could assist with automating the propagation and impact of changes in a BIM-based project delivery process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Hong Kong construction industry is currently facing ageing problem and labour shortage. There are opportunities for employing ethnic minority construction workers to join this hazardous industry. These ethnic minority workers are prone to accidents due to communication barriers. Safety communication is playing an important role for avoiding the accidents on construction sites. However, the ethnic minority workers are not very fluent in the local language and facing safety communication problems while working with local workers. Social network analysis (SNA), being an effective tool to identify the safety communication flow on the construction site, is used to attain the measures of safety communication like centrality, density and betweenness within the ethnic minorities and local workers, and to generate sociograms that visually represent communication pattern within the effective and ineffective safety networks. The aim of this paper is to present the application of SNA for improving the safety communication of ethnic minorities in the construction industry of Hong Kong. The paper provides the theoretical background of SNA approaches for the data collection and analysis using the software UCINET and NetDraw, to determine the predominant safety communication network structure and pattern of ethnic minorities on site.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The current state of the prefabricated housing market in Australia is systematically profiled, guided by a theoretical systems model. Particular focus is given to two original data collections. The first identifies manufacturers and builders using prefabrication innovations, and the second compares the context for prefabricated housing in Australia with that of key international jurisdictions. The results indicate a small but growing market for prefabricated housing in Australia, often building upon expertise developed through non-residential building applications. The international comparison highlighted the complexity of the interactions between macro policy decisions and historical influences and the uptake of prefabricated housing. The data suggest factors such as the small scale of the Australian market, and a lack of investment in research, development and training have not encouraged prefabrication. A lack of clear regulatory policy surrounding prefabricated housing is common both in Australia and internationally, with local effects in regards to home warranties and housing finance highlighted. Future research should target the continuing lack of consideration of prefabrication from within the housing construction industry, and build upon the research reported in this paper to further quantify the potential end user market and the continuing development of the industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Prefabrication has been promoted as a means to improve the efficiency of the Australian house building industry. Issues affecting the uptake of prefabrication were identified through interviews with small and medium sized building companies. Prefabrication’s specific impact on housing construction and smaller organisations has not been frequently investigated. Similar past research has been conducted without the use of a clear theoretical grounding guiding the identification of relevant issues. The current study is guided by a combination of the Theory of Planned Behaviour (TPB) and the Technology Acceptance Model (TAM). This allowed the identification of a broad range of issues across attitudinal, normative, behavioural control and technology adaptation domains. Results revealed improved quality was often offset against practical cost implications. While a high quality of prefabricated products was reported, key technical challenges included coordinating the transporting of modules, and balancing standardisation and product flexibility. Resistance from traditional industry stakeholders regarding build methods, financing, and openness to encouraging prefabrication was commonly reported. The key role of government decision making in facilitating greater demand and competitiveness of prefabricated businesses in the consumer marketplace was also highlighted. Further research is currently being undertaken by the authors, which builds on the exploratory results of the current study through confirmatory, quantitative surveying.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study presents the results of the first large scale survey of Australian builders’ beliefs about prefabrication, drawing on 454 surveys completed by representatives of building companies in Queensland and Western Australia. Previous literature has identified a number of broad themes affecting the uptake of prefabrication. The current study builds on this work by using a structured theoretical model based on the Theory of Planned Behaviour (TPB) and the Technology Acceptance Model (TAM), to further explore the specific factors influencing builders’ intentions to increase their use of prefabrication. Information was gathered concerning the characteristics of respondents in addition to three aims. The aims were: (1) To identify the relative importance of a number of key factors which may affect builders’ use of prefabrication, (2) To compare the characteristics of builders using various levels of prefabrication (including none), and; (3) To determine if a model based on the TPB, TAM, and other control variables can explain builders’ intentions to adopt prefabrication on their housing projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Queensland University of Technology, together with the Royal Melbourne Institute of Technology, the Alliancing Association of Australia, and the Australian Research Council, have recently commenced a 3 year research project which aims to explore the ways in which value for money can be optimised using collaborative contracting during delivery of Australian infrastructure projects.