986 resultados para Halth personnel


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Monthly newsletter produced by Iowa Department of Education

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Monthly newsletter produced by Iowa Department of Education

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Monthly newsletter produced by Iowa Department of Education

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Monthly newsletter produced by Iowa Department of Education

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Monthly newsletter produced by Iowa Department of Education

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Monthly newsletter produced by Iowa Department of Education

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Monthly newsletter produced by Iowa Department of Education

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Monthly newsletter produced by Iowa Department of Education

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Monthly newsletter produced by Iowa Department of Education

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Calendrier des spectacles et des répétitions. - Ne comporte plus la liste du personnel de la régie. - Contient 10 pièces additionnelles

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Monthly newsletter produced by Iowa Department of Education

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Monthly newsletter produced by Iowa Department of Education

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Winter maintenance, particularly snow removal and the stress of snow removal materials on public structures, is an enormous budgetary burden on municipalities and nongovernmental maintenance organizations in cold climates. Lately, geospatial technologies such as remote sensing, geographic information systems (GIS), and decision support tools are roviding a valuable tool for planning snow removal operations. A few researchers recently used geospatial technologies to develop winter maintenance tools. However, most of these winter maintenance tools, while having the potential to address some of these information needs, are not typically placed in the hands of planners and other interested stakeholders. Most tools are not constructed with a nontechnical user in mind and lack an easyto-use, easily understood interface. A major goal of this project was to implement a web-based Winter Maintenance Decision Support System (WMDSS) that enhances the capacity of stakeholders (city/county planners, resource managers, transportation personnel, citizens, and policy makers) to evaluate different procedures for managing snow removal assets optimally. This was accomplished by integrating geospatial analytical techniques (GIS and remote sensing), the existing snow removal asset management system, and webbased spatial decision support systems. The web-based system was implemented using the ESRI ArcIMS ActiveX Connector and related web technologies, such as Active Server Pages, JavaScript, HTML, and XML. The expert knowledge on snow removal procedures is gathered and integrated into the system in the form of encoded business rules using Visual Rule Studio. The system developed not only manages the resources but also provides expert advice to assist complex decision making, such as routing, optimal resource allocation, and monitoring live weather information. This system was developed in collaboration with Black Hawk County, IA, the city of Columbia, MO, and the Iowa Department of transportation. This product was also demonstrated for these agencies to improve the usability and applicability of the system.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A questionnaire was developed by the members of WG12 of EURADOS in order to establish an overview of the current status of eye lens radiation dose monitoring in hospitals. The questionnaire was sent to medical physicists and radiation protection officers in hospitals across Europe. Specific topics were addressed in the questionnaire such as: knowledge of the proposed eye lens dose limit; monitoring and dosimetry issues; training and radiation protection measures. The results of the survey highlighted that the new eye lens dose limit can be exceeded in interventional radiology procedures and that eye lens protection is crucial. Personnel should be properly trained in how to use protective equipment in order to keep eye lens doses as low as reasonably achievable. Finally, the results also highlighted the need to improve the design of eye dosemeters in order to ensure satisfactory use by workers.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Monthly newsletter produced by Iowa Department of Education