868 resultados para Gamification Human-Vehicle HCI Energy-management


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper deals with a hierarchical structure composed by an event-based supervisor in a higher level and two distinct proportional integral (PI) controllers in a lower level. The controllers are applied to a variable speed wind energy conversion system with doubly-fed induction generator, namely, the fuzzy PI control and the fractional-order PI control. The event-based supervisor analyses the operation state of the wind energy conversion system among four possible operational states: park, start-up, generating or brake and sends the operation state to the controllers in the lower level. In start-up state, the controllers only act on electric torque while pitch angle is equal to zero. In generating state, the controllers must act on the pitch angle of the blades in order to maintain the electric power around the nominal value, thus ensuring that the safety conditions required for integration in the electric grid are met. Comparisons between fuzzy PI and fractional-order PI pitch controllers applied to a wind turbine benchmark model are given and simulation results by Matlab/Simulink are shown. From the results regarding the closed loop point of view, fuzzy PI controller allows a smoother response at the expense of larger number of variations of the pitch angle, implying frequent switches between operational states. On the other hand fractional-order PI controller allows an oscillatory response with less control effort, reducing switches between operational states. (C) 2015 Elsevier Ltd. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The energy resource scheduling is becoming increasingly important, as the use of distributed resources is intensified and massive gridable vehicle (V2G) use is envisaged. This paper presents a methodology for day-ahead energy resource scheduling for smart grids considering the intensive use of distributed generation and V2G. The main focus is the comparison of different EV management approaches in the day-ahead energy resources management, namely uncontrolled charging, smart charging, V2G and Demand Response (DR) programs i n the V2G approach. Three different DR programs are designed and tested (trip reduce, shifting reduce and reduce+shifting). Othe r important contribution of the paper is the comparison between deterministic and computational intelligence techniques to reduce the execution time. The proposed scheduling is solved with a modified particle swarm optimization. Mixed integer non-linear programming is also used for comparison purposes. Full ac power flow calculation is included to allow taking into account the network constraints. A case study with a 33-bus distribution network and 2000 V2G resources is used to illustrate the performance of the proposed method.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação apresentada na faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para a obtenção do grau de Mestre em Engenharia Electrotécnica e de Computadores

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Thesis to obtain the Master Degree in Electronics and Telecommunications Engineering

Relevância:

30.00% 30.00%

Publicador:

Resumo:

O presente trabalho de dissertação teve como objetivo a implementação de metodologias de Lean Management e avaliação do seu impacto no processo de Desenvolvimento de Produto. A abordagem utilizada consistiu em efetuar uma revisão da literatura e levantamento do Estado da Arte para obter a fundamentação teórica necessária à implementação de metodologias Lean. Prosseguiu com o levantamento da situação inicial da organização em estudo ao nível das atividades de desenvolvimento de produto, práticas de gestão documental e operacional e ainda de atividades de suporte através da realização de inquéritos e medições experimentais. Este conhecimento permitiu criar um modelo de referência para a implementação de Lean Management nesta área específica do desenvolvimento de produto. Após implementado, este modelo foi validado pela sua experimentação prática e recolha de indicadores. A implementação deste modelo de referência permitiu introduzir na Unidade de Desenvolvimento de Produto e Sistemas (DPS) da organização INEGI, as bases do pensamento Lean, contribuindo para a criação de um ambiente de Respeito pela Humanidade e de Melhoria Contínua. Neste ambiente foi possível obter ganhos qualitativos e quantitativos nas várias áreas em estudo, contribuindo de forma global para um aumento da eficiência e eficácia da DPS. Prevê-se que este aumento de eficiência represente um aumento da capacidade instalada na Organização, pela redução anual de 2290 horas de desperdício (6.5% da capacidade total da unidade) e pela redução significativa em custos operacionais. Algumas das implementações de melhoria propostas no decorrer deste trabalho, após verificado o seu sucesso, extravasaram a unidade em estudo e foram aplicadas transversalmente à da organização. Foram também obtidos ganhos qualitativos, tais como a normalização de práticas de gestão documental e a centralização e agilização de fluxos de informação. Isso permitiu um aumento de qualidade dos serviços prestados pela redução de correções e retrabalho. Adicionalmente, com o desenvolvimento de uma nova ferramenta que permite a monitorização do estado atual dos projetos a nível da sua percentagem de execução (cumprimento de objetivos), prazos e custos, bem como a estimação das datas de conclusão dos projetos possibilitando o replaneamento do projeto bem como a detecção atempada de desvios. A ferramenta permite também a criação de um histórico que identifica o esforço horário associado à realização das atividades/tarefas das várias áreas de Desenvolvimento de Produto e desta forma pode ser usada como suporte à orçamentação futura de atividades similares. No decorrer do projeto, foram também criados os mecanismos que permitem o cálculo de indicadores das competências técnicas e motivações intrínsecas individuais da equipa DPS. Estes indicadores podem ser usados na definição por parte dos gestores dos projetos da composição das equipas de trabalho, dos executantes de tarefas individuais do projeto e dos destinatários de ações de formação. Com esta informação é expectável que se consiga um maior aproveitamento do potencial humano e como consequência um aumento do desempenho e da satisfação pessoal dos recursos humanos da organização. Este caso de estudo veio demonstrar que o potencial de melhoria dos processos associados ao desenvolvimento de produto através de metodologias de Lean Management é muito significativo, e que estes resultam em ganhos visíveis para a organização bem como para os seus elementos individualmente.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertation presented to obtain a Master degree in Biotechnology at the Universidade Nova de Lisboa, Faculdade de Ciências e Tecnologia

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertation submitted to Faculdade de Ciências e Tecnologia - Universidade Nova de Lisboa in fulfilment of the requirements for the degree of Doctor of Philosophy (Biochemistry - Biotechnology)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Forty-nine American Trypanosomiasis (Chagas' disease) patients, with xenodiagnosis proven parasitemia were treated by the authors. Forty-one of these patients were given benznidazole, at dosages ranging from 5mg/kg/day to 8mg/kg/day, during a pre-established period of 60 days. In this group, 17 patients had an undetermined form of the disease, whereas 22 had cardiologic disease and 4 had digestive disease (two patients had a mixed form of the disease). Side effects were frequent, and led to the discontinuation of treatment in 17 patients. The follow-up period ranged from 1 to 20 years (mean follow-up period of 6 yrs. 7 mo). 26 (63.4%) of the patients became parasitemia-negative. The other eight patients were treated with nifurtimox, during 120 days, following a variable dose regime of 5mg/kg/day (initial dose) to 17 mg/kg/day (final dose). Six of them had severe side effects, and only one patient remained parasitemia-negative throughout the observation period (ranging from 1 to 18 years). Benznidazole proved to be better tolerated and more effective in the management of parasitemia when compared to nifurtimox, although more effective and less toxic drugs are still desirable.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

With the introduction of the electrics cars into the market new technologies regarding the battery are being developed and new problems to be solved, one of them the battery management system because each type of cell requires a specific way of handling. This research is done using the active research method to find out the actual problem on this subject and features a BMS should have, understand how they work and how to develop them applied to the purpose on this work. Once the features the BMS should have are clarified, it’s possible to develop a BMS for an electric racing car. The decisions are made taking into consideration the nature of the vehicle being developed. After the project done it’s clear to see that what was developed was not only the BMS itself but all the other factors around it, such as CAN communication, safety control, diagnostics and so on.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents a methodology for multi-objective day-ahead energy resource scheduling for smart grids considering intensive use of distributed generation and Vehicle- To-Grid (V2G). The main focus is the application of weighted Pareto to a multi-objective parallel particle swarm approach aiming to solve the dual-objective V2G scheduling: minimizing total operation costs and maximizing V2G income. A realistic mathematical formulation, considering the network constraints and V2G charging and discharging efficiencies is presented and parallel computing is applied to the Pareto weights. AC power flow calculation is included in the metaheuristics approach to allow taking into account the network constraints. A case study with a 33-bus distribution network and 1800 V2G resources is used to illustrate the performance of the proposed method.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The power systems operation in the smart grid context increases significantly the complexity of their management. New approaches for ancillary services procurement are essential to ensure the operation of electric power systems with appropriate levels of stability, safety, quality, equity and competitiveness. These approaches should include market mechanisms which allow the participation of small and medium distributed energy resources players in a competitive market environment. In this paper, an energy and ancillary services joint market model used by an aggregator is proposed, considering bids of several types of distributed energy resources. In order to improve economic efficiency in the market, ancillary services cascading market mechanism is also considered in the model. The proposed model is included in MASCEM – a multi-agent system electricity market simulator. A case study considering a distribution network with high penetration of distributed energy resources is presented.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents a decision support tool methodology to help virtual power players (VPPs) in the Smart Grid (SGs) context to solve the day-ahead energy resource scheduling considering the intensive use of Distributed Generation (DG) and Vehicle-To-Grid (V2G). The main focus is the application of a new hybrid method combing a particle swarm approach and a deterministic technique based on mixedinteger linear programming (MILP) to solve the day-ahead scheduling minimizing total operation costs from the aggregator point of view. A realistic mathematical formulation, considering the electric network constraints and V2G charging and discharging efficiencies is presented. Full AC power flow calculation is included in the hybrid method to allow taking into account the network constraints. A case study with a 33-bus distribution network and 1800 V2G resources is used to illustrate the performance of the proposed method.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The reactive power management in distribution network with large penetration of distributed energy resources is an important task in future power systems. The control of reactive power allows the inclusion of more distributed recourses and a more efficient operation of distributed network. Currently, the reactive power is only controlled in large power plants and in high and very high voltage substations. In this paper, several reactive power control strategies considering a smart grids paradigm are proposed. In this context, the management of distributed energy resources and of the distribution network by an aggregator, namely Virtual Power Player (VPP), is proposed and implemented in a MAS simulation tool. The proposed methods have been computationally implemented and tested using a 32-bus distribution network with intensive use of distributed resources, mainly the distributed generation based on renewable resources. Results concerning the evaluation of the reactive power management algorithms are also presented and compared.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The rising usage of distributed energy resources has been creating several problems in power systems operation. Virtual Power Players arise as a solution for the management of such resources. Additionally, approaching the main network as a series of subsystems gives birth to the concepts of smart grid and micro grid. Simulation, particularly based on multi-agent technology is suitable to model all these new and evolving concepts. MASGriP (Multi-Agent Smart Grid simulation Platform) is a system that was developed to allow deep studies of the mentioned concepts. This paper focuses on a laboratorial test bed which represents a house managed by a MASGriP player. This player is able to control a real installation, responding to requests sent by the system operators and reacting to observed events depending on the context.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The high penetration of distributed energy resources (DER) in distribution networks and the competitiveenvironment of electricity markets impose the use of new approaches in several domains. The networkcost allocation, traditionally used in transmission networks, should be adapted and used in the distribu-tion networks considering the specifications of the connected resources. The main goal is to develop afairer methodology trying to distribute the distribution network use costs to all players which are usingthe network in each period. In this paper, a model considering different type of costs (fixed, losses, andcongestion costs) is proposed comprising the use of a large set of DER, namely distributed generation(DG), demand response (DR) of direct load control type, energy storage systems (ESS), and electric vehi-cles with capability of discharging energy to the network, which is known as vehicle-to-grid (V2G). Theproposed model includes three distinct phases of operation. The first phase of the model consists in aneconomic dispatch based on an AC optimal power flow (AC-OPF); in the second phase Kirschen’s andBialek’s tracing algorithms are used and compared to evaluate the impact of each resource in the net-work. Finally, the MW-mile method is used in the third phase of the proposed model. A distributionnetwork of 33 buses with large penetration of DER is used to illustrate the application of the proposedmodel.