938 resultados para Cost and standard of living--Maryland--Baltimore


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Quality of life has been shown to be poor among people living with chronic hepatitis C However, it is not clear how this relates to the presence of symptoms and their severity. The aim of this study was to describe the typology of a broad array of symptoms that were attributed to hepatitis C virus (HCV) infection. Phase I used qualitative methods to identify symptoms. In Phase 2, 188 treatment-naive people living with HCV participated in a quantitative survey. The most prevalent symptom was physical tiredness (86%) followed by irritability (75%), depression (70%), mental tiredness (70%), and abdominal pain (68%). Temporal clustering of symptoms was reported in 62% of participants. Principal components analysis identified four symptom clusters: neuropsychiatric (mental tiredness, poor concentration, forgetfulness, depression, irritability, physical tiredness, and sleep problems); gastrointestinal (day sweats, nausea, food intolerance, night sweats, abdominal pain, poor appetite, and diarrhea); algesic (joint pain, muscle pain, and general body pain); and dysesthetic (noise sensitivity, light sensitivity, skin. problems, and headaches). These data demonstrate that symptoms are prevalent in treatment-naive people with HCV and support the hypothesis that symptom clustering occurs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Email has been used for some years as a low-cost telemedicine medium to provide support for developing countries. However, all operations have been relatively small scale and fairly labour intensive to administer. A scalable, automatic message-routing system was constructed which automates many of the tasks. During a four-month study period in 2002, 485 messages were processed automatically. There were 31 referrals from eight hospitals in three countries. These referrals were handled by 25 volunteer specialists from a panel of 42. Two system operators, located 10 time zones apart, managed the system. The median time from receipt of a new referral to its allocation to a specialist was 1.0 days (interquartile range 0.7-2.4). The median interval between allocation and first reply was 0.7 days (interquartile range 0.3-2.3). Automatic message handling solves many of the problems of manual email telemedicine systems and represents a potentially scalable way of doing low-cost telemedicine in the developing world.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of the thesis was to analyse several process configurations for the production of electricity from biomass. Process simulation models using AspenPlus aimed at calculating the industrial performance of power plant concepts were built, tested, and used for analysis. The criteria used in analysis were performance and cost. All of the advanced systems appear to have higher efficiencies than the commercial reference, the Rankine cycle. However, advanced systems typically have a higher cost of electricity (COE) than the Rankine power plant. High efficiencies do not reduce fuel costs enough to compensate for the high capital costs of advanced concepts. The successful reduction of capital costs would appear to be the key to the introduction of the new systems. Capital costs account for a considerable, often dominant, part of the cost of electricity in these concepts. All of the systems have higher specific investment costs than the conventional industrial alternative, i.e. the Rankine power plant; Combined beat and power production (CUP) is currently the only industrial area of application in which bio-power costs can be considerably reduced to make them competitive. Based on the results of this work, AsperiPlus is an appropriate simulation platform. How-ever, the usefulness of the models could be improved if a number of unit operations were modelled in greater detail. The dryer, gasifier, fast pyrolysis, gas engine and gas turbine models could be improved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This exploratory study is concerned with the integrated appraisal of multi-storey dwelling blocks which incorporate large concrete panel systems (LPS). The first step was to look at U.K. multi-storey dwelling stock in general, and under the management of Birmingham City Council in particular. The information has been taken from the databases of three departments in the City of Birmingham, and rearranged in a new database using a suite of PC software called `PROXIMA' for clarity and analysis. One hundred of their stock were built large concrete panel system. Thirteen LPS blocks were chosen for the purpose of this study as case-studies depending mainly on the height and age factors of the block. A new integrated appraisal technique has been created for the LPS dwelling blocks, which takes into account the most physical and social factors affecting the condition and acceptability of these blocks. This appraisal technique is built up in a hierarchical form moving from the general approach to particular elements (a tree model). It comprises two main approaches; physical and social. In the physical approach, the building is viewed as a series of manageable elements and sub-elements to cover every single physical or environmental factor of the block, in which the condition of the block is analysed. A quality score system has been developed which depends mainly on the qualitative and quantitative conditions of each category in the appraisal tree model, and leads to physical ranking order of the study blocks. In the social appraisal approach, the residents' satisfaction and attitude toward their multi-storey dwelling block was analysed in relation to: a. biographical and housing related characteristics; and b. social, physical and environmental factors associated with this sort of dwelling, block and estate in general.The random sample consisted of 268 residents living in the 13 case study blocks. Data collected was analysed using frequency counts, percentages, means, standard deviations, Kendall's tue, r-correlation coefficients, t-test, analysis of variance (ANOVA) and multiple regression analysis. The analysis showed a marginally positive satisfaction and attitude towards living in the block. The five most significant factors associated with the residents' satisfaction and attitude in descending order were: the estate, in general; the service categories in the block, including heating system and lift services; vandalism; the neighbours; and the security system of the block. An important attribute of this method, is that it is relatively inexpensive to implement, especially when compared to alternatives adopted by some local authorities and the BRE. It is designed to save time, money and effort, to aid decision making, and to provide ranked priority to the multi-storey dwelling stock, in addition to many other advantages. A series of solution options to the problems of the block was sought for selection and testing before implementation. The traditional solutions have usually resulted in either demolition or costly physical maintenance and social improvement of the blocks. However, a new solution has now emerged, which is particularly suited to structurally sound units. The solution of `re-cycling' might incorporate the reuse of an entire block or part of it, by removing panels, slabs and so forth from the upper floors in order to reconstruct them as low-rise accommodations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Despite the availability of various control techniques and project control software many construction projects still do not achieve their cost and time objectives. Research in this area so far has mainly been devoted to identifying causes of cost and time overruns. There is limited research geared towards studying factors inhibiting the ability of practitioners to effectively control their projects. To fill this gap, a survey was conducted on 250 construction project organizations in the UK, which was followed by face-to-face interviews with experienced practitioners from 15 of these organizations. The common factors that inhibit both time and cost control during construction projects were first identified. Subsequently 90 mitigating measures have been developed for the top five leading inhibiting factors—design changes, risks/uncertainties, inaccurate evaluation of project time/duration, complexities and non-performance of subcontractors were recommended. These mitigating measures were classified as: preventive, predictive, corrective and organizational measures. They can be used as a checklist of good practice and help project managers to improve the effectiveness of control of their projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fibre overlay is a cost-effective technique to alleviate wavelength blocking in some links of a wavelength-routed optical network by increasing the number of wavelengths in those links. In this letter, we investigate the effects of overlaying fibre in an all-optical network (AON) based on GÉANT2 topology. The constraint-based routing and wavelength assignment (CB-RWA) algorithm locates where cost-efficient upgrades should be implemented. Through numerical examples, we demonstrate that the network capacity improves by 25 per cent by overlaying fibre on 10 per cent of the links, and by 12 per cent by providing hop reduction links comprising 2 per cent of the links. For the upgraded network, we also show the impact of dynamic traffic allocation on the blocking probability. Copyright © 2010 John Wiley & Sons, Ltd.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this thesis, I present the studies on fabrication, spectral and polarisation characterisation of fibre gratings with tilted structures at 45º and > 45º (namely 45º- TFGs and ex 45º-TFGs throughout this thesis) and a range of novel applications with these two types of grating. One of the major contributions made in this thesis is the systematic investigation of the grating structures, inscription analysis and spectral and polarisation properties of both types of TFGs. I have inscribed 45º-TFGs in standard telecom and polarisation maintaining (PM) fibres. Two wavelength regions of interest have been explored including 1.55 µm and 1.06 µm. Detailed analysis on fabrication and characterisation of 45º-TFGs on PM fibres have also been carried out for the first time. For ex 45º- TFGs, fabrication has been investigated only on low-cost standard telecom fibre. Furthermore, thermal responses have been measured and analysed showing that both types of TFG have low responsivity to temperature change. More importantly, their refractive index (RI) responses have been characterised to verify the high responsivity to surrounding medium. Based on the unique polarisation properties, both types of TFG have been applied in fibre laser systems to improve the laser performance, which forms another major contribution of the research presented in this thesis. The integration of a 45º-TFG to the Erbium doped fibre laser (EDFL) enables single polarisation laser output at a single wavelength. When combing with ex 45º-TFGs, the EDFL can be transformed to a multi-wavelength switchable laser with single polarisation output. Furthermore, by utilising the polarisation property of the TFGs, a 45º-TFG based mode locked fibre laser is implemented. This laser can produce laser pulses at femtosecond scale and is the first application of TFG in the field of nonlinear optics. Another important contribution from the studies is the development of TFG based passive and active optical sensor systems. An ex 45º-TFG has been successfully developed into a liquid level sensor showing high sensitivity to water based solvents. Strain and twist sensors have been demonstrated via a fibre laser system using both 45°- and ex 45º-TFG with capability identifying not just the twist rate but also the direction. The sensor systems have shown the added advantage of low cost signal demodulation. In addition, load sensor applications have been demonstrated using the 45º-TFG based single polarisation EDFL and the experimental results show good agreement with the theoretical simulation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fibre overlay is a cost-effective technique to alleviate wavelength blocking in some links of a wavelength-routed optical network by increasing the number of wavelengths in those links. In this letter, we investigate the effects of overlaying fibre in an all-optical network (AON) based on GÉANT2 topology. The constraint-based routing and wavelength assignment (CB-RWA) algorithm locates where cost-efficient upgrades should be implemented. Through numerical examples, we demonstrate that the network capacity improves by 25 per cent by overlaying fibre on 10 per cent of the links, and by 12 per cent by providing hop reduction links comprising 2 per cent of the links. For the upgraded network, we also show the impact of dynamic traffic allocation on the blocking probability. Copyright © 2010 John Wiley & Sons, Ltd.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

JPEG2000 is a new coming image standard. In this paper we analyze the performance of error resilience tools in JPEG2000, and present an analytical model to estimate the quality of JPEG2000 encoded image transmitted over wireless channels. The effectiveness of the analytical model is validated by simulation results. Furthermore, analytical model is utilized by the base station to design efficient unequally error protection schemes for JPEG2000 transmission. In the design, a utility function is denned to make a tradeoff between the image quality and the cost for transmitting the image over wireless channel. © 2002 IEEE.