887 resultados para Computer System Management


Relevância:

40.00% 40.00%

Publicador:

Resumo:

The research investigates the processes of adoption and implementation, by organisations, of computer aided production management systems (CAPM). It is organised around two different theoretical perspectives. The first part is informed by the Rogers model of the diffusion, adoption and implementation of innovations, and the second part by a social constructionist approach to technology. Rogers' work is critically evaluated and a model of adoption and implementation is distilled from it and applied to a set of empirical case studies. In the light of the case study data, strengths and weaknesses of the model are identified. It is argued that the model is too rational and linear to provide an adequate explanation of adoption processes. It is useful for understanding processes of implementation but requires further development. The model is not able to adequately encompass complex computer based technologies. However, the idea of 'reinvention' is identified as Roger's key concept but it needs to be conceptually extended. Both Roger's model and definition of CAPM found in the literature from production engineering tend to treat CAPM in objectivist terms. The problems with this view are addressed through a review of the literature on the sociology of technology, and it is argued that a social constructionist approach offers a more useful framework for understanding CAPM, its nature, adoption, implementation, and use. CAPM it is argued, must be understood on terms of the ways in which it is constituted in discourse, as part of a 'struggle for meaning' on the part of academics, professional engineers, suppliers, and users.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In recent years, UK industry has seen an explosive growth in the number of `Computer Aided Production Management' (CAPM) system installations. Of the many CAPM systems, materials requirement planning/manufacturing resource planning (MRP/MRPII) is the most widely implemented. Despite the huge investments in MRP systems, over 80 percent are said to have failed within 3 to 5 years of installation. Many people now assume that Just-In-Time (JIT) is the best manufacturing technique. However, those who have implemented JIT have found that it also has many problems. The author argues that the success of a manufacturing company will not be due to a system which complies with a single technique; but due to the integration of many techniques and the ability to make them complement each other in a specific manufacturing environment. This dissertation examines the potential for integrating MRP with JIT and Two-Bin systems to reduce operational costs involved in managing bought-out inventory. Within this framework it shows that controlling MRP is essential to facilitate the integrating process. The behaviour of MRP systems is dependent on the complex interactions between the numerous control parameters used. Methodologies/models are developed to set these parameters. The models are based on the Pareto principle. The idea is to use business targets to set a coherent set of parameters, which not only enables those business targets to be realised, but also facilitates JIT implementation. It illustrates this approach in the context of an actual manufacturing plant - IBM Havant. (IBM Havant is a high volume electronics assembly plant with the majority of the materials bought-out). The parameter setting models are applicable to control bought-out items in a wide range of industries and are not dependent on specific MRP software. The models have produced successful results in several companies and are now being developed as commercial products.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Thesis is about the enterprise reform in China in general, and the Contract Management Responsibility System (the CMRS) in particular. The latter is a new institutional arrangement to deal with the relation between the government and the state-owned enterprise which has always been at the centre of the enterprise reform. The focus of the research is on the process of institutionalization in order to study the problems of the emergence of a free enterprise system in China. The research is conducted by four in-depth case studies to reveal how the CMRS is running and what interaction is taking place between the government and the state-owned enterprise under the system. Drawing on the empirical work, the thesis analyzes the features of the CMRS and the characteristics of its implementation process with respect to the structural-institutional paradigm, and the property rights approach. The research shows that to establish a market-type relation between the government and the enterprise is a complicated and dynamic process. It involves the understanding of the two different economic mechanisms, market and planning, and the interations taken by two parties. It concludes that the CMRS is an unstable system, either going back to the previous system or moving towards a market system, because its dynamic and control dimension are dysfunctional.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Computer integrated manufacture has brought about great advances in manufacturing technology and its recognition is world wide. Cold roll forming of thin-walled sections, and in particular the design and manufacture of form-rolls, the special tooling used in the cold roll forming process, is but one such area where computer integrated manufacture can make a positive contribution. The work reported in this thesis, concerned with the development of an integrated manufacturing system for assisting the design and manufacture of form-rolls, was undertaken in collaboration with a leading manufacturer of thin-walled sections. A suit of computer programs, written in FORTRAN 77, have been developed to provide computer aids for every aspect of work in form-roll design and manufacture including cost estimation and stock control aids. The first phase of the development programme dealt with the establishment of CAD facilities for form-roll design, comprising the design of the finished section, the flower pattern, the roll design and the interactive roll editor program. Concerning the CAM facilities, dealt with in the second phase, an expert system roll machining processor and a general post-processor have been developed for considering the roll geometry and automatically generating NC tape programs for any required CNC lathe system. These programs have been successfully implemented, as an integrated manufacturing software system, on the VAX 11/750 super-minicomputer with graphics facilities for displaying drawings interactively on the terminal screen. The development of the integrated system has been found beneficial in all aspects of form-roll design and manufacture. Design and manufacturing lead times have been reduced by several weeks, quality has improved considerably and productivity has increased. The work has also demonstrated the promising nature of the expert systems approach to computer integrated manufacture.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Computer integrated monitoring is a very large area in engineering where on-line, real time data acquisition with the aid of sensors is the solution to many problems in the manufacturing industry as opposed to the old data logging method by graphics analysis. The raw data which is collected this way however is useless in the absence of a proper computerized management system. The transfer of data between the management and the shop floor processes has been impossible in the past unless all the computers in the system were totally compatible with each other. This limits the efficiency of the systems because they get governed by the limitations of the computers. General Motors of U.S.A. have recently started research on a new standard called the Manufacturing Automation Protocol (MAP) which is expected to allow data transfer between different types of computers. This is still in early development stages and also is currently very expensive. This research programme shows how such a shop floor data acquisition system and a complete management system on entirely different computers can be integrated together to form a single system by achieving data transfer communications using a cheaper but a superior alternative to MAP. Standard communication character sets and hardware such as ASCII and UARTs have been used in this method but the technique is so powerful that totally incompatible computers are shown to run different programs (in different languages) simultaneously and yet receive data from each other and process in their own CPUs with no human intervention.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The present study describes a pragmatic approach to the implementation of production planning and scheduling techniques in foundries of all types and looks at the use of `state-of-the-art' management control and information systems. Following a review of systems for the classification of manufacturing companies, a definitive statement is made which highlights the important differences between foundries (i.e. `component makers') and other manufacturing companies (i.e. `component buyers'). An investigation of the manual procedures which are used to plan and control the manufacture of components reveals the inherent problems facing foundry production management staff, which suggests the unsuitability of many manufacturing techniques which have been applied to general engineering companies. From the literature it was discovered that computer-assisted systems are required which are primarily `information-based' rather than `decision based', whilst the availability of low-cost computers and `packaged-software' has enabled foundries to `get their feet wet' without the financial penalties which characterized many of the early attempts at computer-assistance (i.e. pre-1980). Moreover, no evidence of a single methodology for foundry scheduling emerged from the review. A philosophy for the development of a CAPM system is presented, which details the essential information requirements and puts forward proposals for the subsequent interactions between types of information and the sub-system of CAPM which they support. The work developed was oriented specifically at the functions of production planning and scheduling and introduces the concept of `manual interaction' for effective scheduling. The techniques developed were designed to use the information which is readily available in foundries and were found to be practically successful following the implementation of the techniques into a wide variety of foundries. The limitations of the techniques developed are subsequently discussed within the wider issues which form a CAPM system, prior to a presentation of the conclusions which can be drawn from the study.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Many manufacturing companies have long endured the problems associated with the presence of `islands of automation'. Due to rapid computerisation, `islands' such as Computer-Aided Design (CAD), Computer-Aided Manufacturing (CAM), Flexible Manufacturing Systems (FMS) and Material Requirement Planning (MRP), have emerged, and with a lack of co-ordination, often lead to inefficient performance of the overall system. The main objective of Computer-Integrated Manufacturing (CIM) technology is to form a cohesive network between these islands. Unfortunately, a commonly used approach - the centralised system approach, has imposed major technical constraints and design complication on development strategies. As a consequence, small companies have experienced difficulties in participating in CIM technology. The research described in this thesis has aimed to examine alternative approaches to CIM system design. Through research and experimentation, the cellular system approach, which has existed in the form of manufacturing layouts, has been found to simplify the complexity of an integrated manufacturing system, leading to better control and far higher system flexibility. Based on the cellular principle, some central management functions have also been distributed to smaller cells within the system. This concept is known, specifically, as distributed planning and control. Through the development of an embryo cellular CIM system, the influence of both the cellular principle and the distribution methodology have been evaluated. Based on the evidence obtained, it has been concluded that distributed planning and control methodology can greatly enhance cellular features within an integrated system. Both the cellular system approach and the distributed control concept will therefore make significant contributions to the design of future CIM systems, particularly systems designed with respect to small company requirements.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In response to the increasing international competitiveness, many manufacturing businesses are rethinking their management strategies and philosophies towards achieving a computer integrated environment. The explosive growth in Advanced Manufacturing Technology (AMI) has resulted in the formation of functional "Islands of Automation" such as Computer Aided Design (CAD), Computer Aided Manufacturing (CAM), Computer Aided Process Planning (CAPP) and Manufacturing Resources Planning (MRPII). This has resulted in an environment which has focussed areas of excellence and poor overall efficiency, co-ordination and control. The main role of Computer Integrated Manufacturing (CIM) is to integrate these islands of automation and develop a totally integrated and controlled environment. However, the various perceptions of CIM, although developing, remain focussed on a very narrow integration scope and have consequently resulted in mere linked islands of automation with little improvement in overall co-ordination and control. This thesis, that is the research described within, develops and examines a more holistic view of CIM, which is based on the integration of various business elements. One particular business element, namely control, has been shown to have a multi-facetted and underpinning relationship with the CIM philosophy. This relationship impacts various CIM system design aspects including the CIM business analysis and modelling technique, the specification of systems integration requirements, the CIM system architectural form and the degree of business redesign. The research findings show that fundamental changes to CIM system design are required; these are incorporated in a generic CIM design methodology. The affect and influence of this holistic view of CIM on a manufacturing business has been evaluated through various industrial case study applications. Based on the evidence obtained, it has been concluded that this holistic, control based approach to CIM can provide a greatly improved means of achieving a totally integrated and controlled business environment. This generic CIM methodology will therefore make a significant contribution to the planning, modelling, design and development of future CIM systems.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

A study on heat pump thermodynamic characteristics has been made in the laboratory on a specially designed and instrumented air to water heat pump system. The design, using refrigerant R12, was based on the requirement to produce domestic hot water at a temperature of about 50 °C and was assembled in the laboratory. All the experimental data were fed to a microcomputer and stored on disk automatically from appropriate transducers via amplifier and 16 channel analogue to digital converters. The measurements taken were R12 pressures and temperatures, water and R12 mass flow rates, air speed, fan and compressor input powers, water and air inlet and outlet temperatures, wet and dry bulb temperatures. The time interval between the observations could be varied. The results showed, as expected, that the COP was higher at higher air inlet temperatures and at lower hot water output temperatures. The optimum air speed was found to be at a speed when the fan input power was about 4% of the condenser heat output. It was also found that the hot water can be produced at a temperature higher than the appropriate R12 condensing temperature corresponding to condensing pressure. This was achieved by condenser design to take advantage of discharge superheat and by further heating the water using heat recovery from the compressor. Of the input power to the compressor, typically about 85% was transferred to the refrigerant, 50 % by the compression work and 35% due to the heating of the refrigerant by the cylinder wall, and the remaining 15% (of the input power) was rejected to the cooling medium. The evaporator effectiveness was found to be about 75% and sensitive to the air speed. Using the data collected, a steady state computer model was developed. For given input conditions s air inlet temperature, air speed, the degree of suction superheat , water inlet and outlet temperatures; the model is capable of predicting the refrigerant cycle, compressor efficiency, evaporator effectiveness, condenser water flow rate and system Cop.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This thesis deals with the problem of Information Systems design for Corporate Management. It shows that the results of applying current approaches to Management Information Systems and Corporate Modelling fully justify a fresh look to the problem. The thesis develops an approach to design based on Cybernetic principles and theories. It looks at Management as an informational process and discusses the relevance of regulation theory to its practice. The work proceeds around the concept of change and its effects on the organization's stability and survival. The idea of looking at organizations as viable systems is discussed and a design to enhance survival capacity is developed. It takes Ashby's theory of adaptation and developments on ultra-stability as a theoretical framework and considering conditions for learning and foresight deduces that a design should include three basic components: A dynamic model of the organization- environment relationships; a method to spot significant changes in the value of the essential variables and in a certain set of parameters; and a Controller able to conceive and change the other two elements and to make choices among alternative policies. Further considerations of the conditions for rapid adaptation in organisms composed of many parts, and the law of Requisite Variety determine that successful adaptive behaviour requires certain functional organization. Beer's model of viable organizations is put in relation to Ashby's theory of adaptation and regulation. The use of the Ultra-stable system as abstract unit of analysis permits developing a rigorous taxonomy of change; it starts distinguishing between change with in behaviour and change of behaviour to complete the classification with organizational change. It relates these changes to the logical categories of learning connecting the topic of Information System design with that of organizational learning.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Faced with a future of rising energy costs there is a need for industry to manage energy more carefully in order to meet its economic objectives. A problem besetting the growth of energy conservation in the UK is that a large proportion of energy consumption is used in a low intensive manner in organisations where they would be responsibility for energy efficiency is spread over a large number of personnel who each see only small energy costs. In relation to this problem in the non-energy intensive industrial sector, an application of an energy management technique known as monitoring and targeting (M & T) has been installed at the Whetstone site of the General Electric Company Limited in an attempt to prove it as a means for motivating line management and personnel to save energy. The objective energy saving for which the M & T was devised is very specific. During early energy conservation work at the site there had been a change from continuous to intermittent heating but the maintenance of the strategy was receiving a poor level of commitment from line management and performance was some 5% - 10% less than expected. The M & T is concerned therefore with heat for space heating for which a heat metering system was required. Metering of the site high pressure hot water system posed technical difficulties and expenditure was also limited. This led to a ‘tin-house' design being installed for a price less than the commercial equivalent. The timespan of work to achieve an operational heat metering system was 3 years which meant that energy saving results from the scheme were not observed during the study. If successful the replication potential is the larger non energy intensive sites from which some 30 PT savings could be expected in the UK.