890 resultados para Code of Civil Procedure (CPC)


Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Distraction whilst driving on an approach to a signalized intersection is particularly dangerous, as potential vehicular conflicts and resulting angle collisions tend to be severe. This study examines the decisions of distracted drivers during the onset of amber lights. Driving simulator data were obtained from a sample of 58 drivers under baseline and handheld mobile phone conditions at the University of IOWA - National Advanced Driving Simulator. Explanatory variables include age, gender, cell phone use, distance to stop-line, and speed. An iterative combination of decision tree and logistic regression analyses are employed to identify main effects, non-linearities, and interactions effects. Results show that novice (16-17 years) and younger (18-25 years) drivers’ had heightened amber light running risk while distracted by cell phone, and speed and distance thresholds yielded significant interaction effects. Driver experience captured by age has a multiplicative effect with distraction, making the combined effect of being inexperienced and distracted particularly risky. Solutions are needed to combat the use of mobile phones whilst driving.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Commonwealth Department of Industry, Science and Resources is identifying best practice case study examples of supply chain management within the building and construction industry to illustrate the concepts, innovations and initiatives that are at work. The projects provide individual enterprises with examples of how to improve their performance, and the competitiveness of the industry as a whole.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many accidents occur world-wide in the use of construction plant and equipment, and safety training is considered by many to be one of the best approaches to their prevention. However, current safety training methods/tools are unable to provide trainees with the hands-on practice needed. Game technology-based safety training platforms have the potential to overcome this problem in a virtual environment. One such platform is described in this paper - its characteristics are analysed and its possible contribution to safety training identified. This is developed and tested by means of a case study involving three major pieces of construction plant, which successfully demonstrates that the platform can improve the process and performance of the safety training involved in their operation. This research not only presents a new and useful solution to the safety training of construction operations, but illustrates the potential use of advanced technologies in solving construction industry problems in general.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Green building is building that the focus is to maximize the energy efficiency and resources used. While, retrofitting is the process of renovate or refurnish the existing building. Therefore by retrofit existing buildings that comply with green building requirement, it improves the environmental attributes of the buildings. In Malaysia, existing buildings and its communities contribute over 40% of green house gases to the environment. This paper describes a study that explores the potential to retrofit existing campus buildings that response to sustainable green building standard. A validation survey was carried out and the data collected was analysed using SPSS in order to confirm the significance of retrofitting Universiti Teknologi Malaysia (UTM) buildings toward green building initiative. The results show that all the twenty eight identified green elements recorded average index of higher than 3.5 which means that there is significant needs to retrofit the existing buildings to green buildings. This study concludes that it is urgently need for the campus to response to green building requirements in order to achieve higher energy effeciency and this can be done through effective etrofitting of existing buildings.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Data mining techniques extract repeated and useful patterns from a large data set that in turn are utilized to predict the outcome of future events. The main purpose of the research presented in this paper is to investigate data mining strategies and develop an efficient framework for multi-attribute project information analysis to predict the performance of construction projects. The research team first reviewed existing data mining algorithms, applied them to systematically analyze a large project data set collected by the survey, and finally proposed a data-mining-based decision support framework for project performance prediction. To evaluate the potential of the framework, a case study was conducted using data collected from 139 capital projects and analyzed the relationship between use of information technology and project cost performance. The study results showed that the proposed framework has potential to promote fast, easy to use, interpretable, and accurate project data analysis.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The design-build (DB) system is a popular and effective delivery method of construction projects worldwide. After owners decide to procure their projects through the DB system, they may wish to determine the optimal proportion of design to be provided in the DB request for proposals (RFPs), which serve as solicitations for design-builders and describe the scope of work. However, this presents difficulties to DB owners and there is little, if any, systematic research in this area. This paper reports on an empirical study in the USA entailing both an online questionnaire survey and Delphi survey to identify and evaluate the factors influencing owners’ decisions in determining the proportion of design to include in DB RFPs. Eleven factors are identified, i.e. (1) clarity of project scope; (2) applicability of performance specifications; (3) desire for design innovation; (4) site constraints; (5) availability of competent design-builders; (6) project control requirements; (7) user group involvement level; (8) third party requirements; (9) owner experience with DB; (10) project complexity; and (11) schedule constraints. A statistically significant agreement on the eleven factors was also obtained from the (mainly non-owner) Delphi experts. Although some of the experts hold different opinions on how these factors affect the proportion of design, these findings furnish various stakeholders with a better understanding of the delivery process of DB projects and the appropriate provision of project information in DB RFPs. As the result is mainly industry opinion concerning the optimal proportion of design, in addition and for completeness, future studies should be conducted to obtain a big picture of the optimal proportion of design by means of seeking owners’ inputs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Clients and Design-build (DB) contractors are two key stakeholders in DB projects, and contribute significantly to the successful project performance. This study aims to identify and compare such key competences in the construction market of the PRC. After the survey of available literature and face-to-face interviews, a two-round Delphi questionnaire survey was conducted to identify the key competences of clients and DB contractors in DB projects. Relative importance of these identified competences were ranked and compared. The questionnaire results indicated distinct differences between the key competences of clients and that of contractors. The contractor’s key competences emphasize on DB experience, corporate management capability, building and design expertise, financial capability, enterprise qualification and reputation. While the client’s competences focus on the ability to clearly define the project scope & requirements, financial capacity, contract management ability, adequate staff, effective coordination with DB contractor and similar DB experience. Both clients and DB contractors should clearly understand the competence requirements in DB projects and possess all the necessary competences for the successful outcome of DB projects. The identification of these key competences provides clients and DB contractors with indicators to assess their capabilities before going for the DB option. Furthermore, the comparison of competences for clients and DB contractors will result in better understanding of DB system and improve the communication between these stakeholders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A recent District Court case is believed to be the first in Queensland in which UCPR r 5 has been used to support the setting aside of a regularly entered default judgment without a costs order.