984 resultados para Civil Engineering
Resumo:
The 2011 floods illustrated once again Queensland’s vulnerability to flooding and similar disasters. Climate change will increase the frequency and magnitude of such events and will have a variety of other impacts. To deal with these impacts governments at all levels need to be prepared and work together. Like the rest of the nation most of the population of the state is located in the coastal areas and these areas are more vulnerable to the impacts of climate change. This paper examines climate change adaptation efforts in coastal Queensland. The aim is increasing local disaster resilience of people and property through fostering coordination between local and state government planning activities in coastal high hazard areas. By increasing the ability of local governments and state agencies to coordinate planning activities, we can help adapt to impacts of climate change. Towards that end, we will look at the ways that these groups currently interact, especially with regard to issues involving uncertainty related to climate change impacts. Through an examination of climate change related activities by Queensland’s coastal local governments and state level planning agencies and how they coordinate their planning activities at different levels we aim to identify the weaknesses of the current planning system in responding to the challenges of climate change adaptation and opportunities for improving the ways we plan and coordinate planning, and make recommendations to improve resilience in advance of disasters so as to help speed up recovery when they occur.
Resumo:
A newly developed computational approach is proposed in the paper for the analysis of multiple crack problems based on the eigen crack opening displacement (COD) boundary integral equations. The eigen COD particularly refers to a crack in an infinite domain under fictitious traction acting on the crack surface. With the concept of eigen COD, the multiple cracks in great number can be solved by using the conventional displacement discontinuity boundary integral equations in an iterative fashion with a small size of system matrix to determine all the unknown CODs step by step. To deal with the interactions among cracks for multiple crack problems, all cracks in the problem are divided into two groups, namely the adjacent group and the far-field group, according to the distance to the current crack in consideration. The adjacent group contains cracks with relatively small distances but strong effects to the current crack, while the others, the cracks of far-field group are composed of those with relatively large distances. Correspondingly, the eigen COD of the current crack is computed in two parts. The first part is computed by using the fictitious tractions of adjacent cracks via the local Eshelby matrix derived from the traction boundary integral equations in discretized form, while the second part is computed by using those of far-field cracks so that the high computational efficiency can be achieved in the proposed approach. The numerical results of the proposed approach are compared not only with those using the dual boundary integral equations (D-BIE) and the BIE with numerical Green's functions (NGF) but also with those of the analytical solutions in literature. The effectiveness and the efficiency of the proposed approach is verified. Numerical examples are provided for the stress intensity factors of cracks, up to several thousands in number, in both the finite and infinite plates.
Resumo:
Infrastructure forms a vital component in supporting today’s way of life and has a significant role or impact on economic, environmental and social outcomes of the region around it. The design, construction and operation of such assets are a multi-billion dollar industry in Australia alone. Another issue that will play a major role in our way life is that of climate change and the greater concept of sustainability. With limited resources and a changing natural world it is necessary for infrastructure to be developed and maintained in a manner that is sustainable. In order to achieve infrastructure sustainability in operations it is necessary for there to be: a sustainability assessment scheme that provides a scientifically sound and realistic approach to measuring an assets level of sustainability; and, systems and tools to support the making of decisions that result in sustainable outcomes by providing feedback in a timely manner. Having these in place will then help drive the consideration of sustainability during the decision making process for infrastructure operations and maintenance. In this paper we provide two main contributions; a comparison and review of sustainability assessment schemes for infrastructure and their suitability for use in the operations phase; and, a review of decision support systems/tools in the area of infrastructure sustainability in operations. For this paper, sustainability covers not just the environment, but also finance/economic and societal/community aspects as well. This is often referred to as the Triple Bottom Line and forms one of the three dimensions of corporate sustainability [Stapledon, 2004].
Resumo:
There is a worldwide demand for an increasingly sustainable built environment. This has resulted in the need for a more accurate evaluation of the level of sustainability of construction projects. To do this it involves the development of better measurement and benchmarking methods. One approach is to use a theoretical model to assess construction projects in terms of their sustainable development value (SDV) and sustainable development ability (SDA) for implementation in the project life cycle, where SDA measures the contribution of a project to development sustainability and as a major criterion for assessing its feasibility. This paper develops an improved SDA prototype model that incorporates the effects of dynamical factors on project sustainability. This involves the introduction of two major factors concerning technological advancement and changes in people's perceptions. A case study is used to demonstrate the procedures involved in simulation and modeling, one outcome of which is to demonstrate the greater influence of technological advancement on project sustainability than changes in perception.
Resumo:
Purpose – Within the construction industry there is a growing awareness of the need for linking knowledge management (KM) to business strategy, organisational objectives and existing performance measures. This study was undertaken within the context of construction organisations, and attempts to provide the empirical evidence about the relationships between KM activities and organisational business performance. Design/methodology/approach – A questionnaire survey was administered to a sample of construction contractors operating in Hong Kong to investigate the opinions of construction professionals regarding the intensity of KM activities and business performance within their organisations. In parallel to the survey, semi-structured interviews were undertaken to provide qualitative insights that helped to clarify and deepen understanding of the KM process within the context of the research target. Findings – The investigation shows that knowledge utilisation is the strongest contributor to general business performance. In addition, the impact of KM activities on the lagging performance indicators of the Balanced Scorecard (BSC), such as “financial performance”, is in an indirect manner, and through the leading indicators such as performance from “internal process” as well as “learning and growth” perspectives. Originality/value – The study empirically establishes the linkage between intensity of KM activities and business performance, and demonstrates that KM strategies need to be explicitly formulated and measured according to organisational business objectives.
Resumo:
Building information modeling (BIM) is an emerging technology and process that provides rich and intelligent design information models of a facility, enabling enhanced communication, coordination, analysis, and quality control throughout all phases of a building project. Although there are many documented benefits of BIM for construction, identifying essential construction-specific information out of a BIM in an efficient and meaningful way is still a challenging task. This paper presents a framework that combines feature-based modeling and query processing to leverage BIM for construction. The feature-based modeling representation implemented enriches a BIM by representing construction-specific design features relevant to different construction management (CM) functions. The query processing implemented allows for increased flexibility to specify queries and rapidly generate the desired view from a given BIM according to the varied requirements of a specific practitioner or domain. Central to the framework is the formalization of construction domain knowledge in the form of a feature ontology and query specifications. The implementation of our framework enables the automatic extraction and querying of a wide-range of design conditions that are relevant to construction practitioners. The validation studies conducted demonstrate that our approach is significantly more effective than existing solutions. The research described in this paper has the potential to improve the efficiency and effectiveness of decision-making processes in different CM functions.
Resumo:
As a novel sensitive element and due to its advantages of immunity to electrical interference, distributed measurement, etc., fiber Bragg grating (FBG) has been researched widely. To realize the substitution of high accurate electronic temperature sensors, high sensitive FBG temperature sensors can be made by taking advantage of its characters of being sensitive to both temperature and strain. Although there are reports about high sensitive FBG temperature sensors, however, few about their stability have been done. We manufactured a high sensitive FBG temperature sensor, and put it together with an average FBG temperature sensor and an electronic crystal temperature sensor into a stainless steel container filled by water to observe the room temperature change. By comparing their results in two weeks, we have found out that: although the high sensitive FBG temperature sensor is in much better agreement with the electronic crystal sensor than the average FBG sensor is, it has occurred some small drifts. Because the drifts appeared in the process of further pulling the FBG, it might be a result of the slip of the FBG fixing points. This contributes some good experiences to the application of FBG in high accuracy temperature measurement.
High-sensitivity fiber Bragg grating temperature sensor at high temperature [一种高温下高灵敏光纤光栅温度传感器的制作方法]
Resumo:
A method of making full use of the durable strain which fiber Bragg grating (FBG) can undertake is presented, which hugely improves the sensitivities of FBG temperature sensors at high temperature. When a sensor is manufactured at room temperature, its FBG should be given a pre-relaxing length according to the temperature it is asked to measure; once the temperature rise to the asked one, its FBG starts to be stretched and it starts to work with high sensitivity. The relationship between the pre-relaxing length and the working temperature is analyzed. In experiments, when the pre-relaxing lengths are 0.2mm、0.5mm、0.6mm, the working temperatures rise 25℃、50℃、61℃, respectively, and the sensitivities are almost the same (675pm/℃). The facts that the experimental results agree well with the theoretical analyses verify this method’s validity.
Resumo:
This paper presents a methodology for real-time estimation of exit movement-specific average travel time on urban routes by integrating real-time cumulative plots, probe vehicles, and historic cumulative plots. Two approaches, component based and extreme based, are discussed for route travel time estimation. The methodology is tested with simulation and is validated with real data from Lucerne, Switzerland, that demonstrate its potential for accurate estimation. Both approaches provide similar results. The component-based approach is more reliable, with a greater chance of obtaining a probe vehicle in each interval, although additional data from each component is required. The extreme-based approach is simple and requires only data from upstream and downstream of the route, but the chances of obtaining a probe that traverses the entire route might be low. The performance of the methodology is also compared with a probe-only method. The proposed methodology requires only a few probes for accurate estimation; the probe-only method requires significantly more probes.
Resumo:
As a novel sensing element, fiber Bragg grating (FBG) is sensitive to both temperature and strain. Basing on this character, high sensitivity FBG temperature sensor can be made. However, as a result of the strain limit of the fiber, the temperature range it can endure is quite narrow. This drawback limits its application and complicates its storage and transport. We design and manufacture a FBG temperature sensor with tunable sensitivity. By tuning its sensitivity, its temperature range is changed, which enlarges its application field, solves the problem of storage and transport, and brighten the future of FBG in temperature measurement. In experiment, by changing the fixing position of the bimetal we tuned the sensitivity of the high sensitivity FBG sensor to different values (-47 pm/℃,-97.7 pm/℃,-153.3 pm/℃).
Resumo:
Basing on the character that Fiber Bragg Grating (FBG) is sensitive to both temperature and strain, by using Al and Fe-Ni alloy’s bimetal structure, we successfully design and manufacture a high accuracy FBG temperature sensor for earthquake premonition. Furthermore, we analyze the accuracy of the FBG sensors with enhanced sensitivity for the first time, and get its accuracy is up to ±0.05℃ with highest resolution ever in all FBG temperature sensors (0.0014℃/pm). This work experimentally proves the feasibility of using FBG in the earthquake premonition monitoring, and builds the foundation for the application of optic technology in earthquake premonition monitoring.
Resumo:
Purpose: Recent knowledge management (KM) literature suggests that KM activities are influenced by the elements of the internal business environment (BE) of organisations. This paper attempts to provide some unique insights into the contextual input of the KM process through empirically identifying the major factors (i.e. “forces”) within the internal BE of construction organisations operating in Hong Kong, and investigating their impact on the intensity of KM activities. Design/methodology/approach: A questionnaire survey was administered to a sample of construction contractors operating in Hong Kong to elicit opinions on the internal BE and intensity of KM activities as executed by targeted organisations. A total of 149 usable responses were received from 99 organisations representing about 38 percent of the research population. In parallel, to the survey, a total of 15 semi-structured interviews were undertaken to provide more insights into the phenomenon under investigation. Findings: Supported by the empirical and qualitative evidence, this study established that firstly, both organisational and technical environments have the capacity to either positively or negatively impact the intensity of KM activities, and both environments serve as stimuli in increasing each other's dynamism; secondly, certain types of KM activities are stronger “energy receivers” and easily to be “powered up” by manipulating factors representing these two environments. Then, through interactions between KM activities, the intensity of the whole strategic KM cycle will be increased thus helping to strengthen organisational competitive advantage.
Resumo:
Purpose – Recent knowledge management (KM) literature suggests that KM activities are not independent of each other, rather they interact with each other to form a process which receives input from both external and internal business environments, and then produces new knowledge for future utilisation. The purpose of this paper is to empirically investigate the relationships between KM activities within the construction business context in order to identify and map the pattern of their interactions. Design/methodology/approach – A questionnaire survey was administered to a sample of contracting organisations operating in Hong Kong to elicit opinions of construction professionals on the intensity of KM activities currently being executed by their organisations in order to facilitate knowledge capture, sharing and utilisation. More than 150 respondents from 99 organisations responded to the survey. Additionally, a total of 15 semi-structured interviews were undertaken to provide a unique perspective on many of the challenges facing local construction organisations when dealing with KM activities. Findings – Knowledge acquisition and utilisation play paramount roles in the development of the organisational knowledge asset. The higher the intensity of these two activities, the larger the organisational knowledge pool which, in turn, demands greater knowledge dissemination capacity. This dissemination capacity enables more active and intense responses to market changes and clients' needs, thus facilitating and stimulating acquisition and utilisation of new tacit knowledge, thus improving organisational business performance. Originality/value – Interactions between KM activities were empirically investigated, from a strategic perspective, in the construction business context.
Resumo:
Purpose: Within the context of high global competitiveness, knowledge management (KM) has proven to be one of the major factors contributing to enhanced business outcomes. Furthermore, knowledge sharing (KS) is one of the most critical of all KM activities. From a manufacturing industry perspective, supply chain management (SCM) and product development process (PDP) activities, require a high proportion of company resources such as budget and manpower. Therefore, manufacturing companies are striving to strengthen SCM, PDP and KS activities in order to accelerate rates of manufacturing process improvement, ultimately resulting in higher levels of business performance (BP). A theoretical framework along with a number of hypotheses are proposed and empirically tested through correlation, factor and path analyses. Design/methodology/approach: A questionnaire survey was administered to a sample of electronic manufacturing companies operating in Taiwan to facilitate testing the proposed relationships. More than 170 respondents from 83 organisations responded to the survey. The study identified top management commitment and employee empowerment, supplier evaluation and selection, and design simplification and modular design as the key business activities that are strongly associated with the business performance. Findings: The empirical study supports that key manufacturing business activities (i.e., SCM, PDP, and KS) are positively associated with BP. The findings also evealed that some specific business activities such as SCMF1,PDPF2, and KSF1 have the strongest influencing power on particular business outcomes (i.e., BPF1 and BPF2) within the context of electronic manufacturing companies operating in Taiwan. Practical implications: The finding regarding the relationship between SCM and BP identified the essential role of supplier evaluation and selection in improving business competitiveness and long term performance. The process of forming knowledge in companies, such as creation, storage/retrieval, and transfer do not necessarily lead to enhanced business performance; only through effectively applying knowledge to the right person at the right time does. Originality/value: Based on this finding it is recommended that companies should involve suppliers in partnerships to continuously improve operations and enhance product design efforts, which would ultimately enhance business performance. Business performance depends more on an employee’s ability to turn knowledge into effective action.
Resumo:
The regulation of overweight trucks is of increasing importance. Quickly growing heavy vehicle volumes over-proportionally contribute to roadway damage. Raising maintenance costs and compromised road safety are also becoming a major concern to managing agencies. Minimizing pavement wear is done by regulating overloaded trucks on major highways at weigh stations. However, due to lengthy inspections and insufficient capacities, weigh stations tend to be inefficient. New practices, using Radio Frequency Identification (RFID) transponders and weigh-in-motion technologies, called preclearance programs, have been set up in a number of countries. The primary aim of this study is to investigate the current issues with regard to the implementation and operation of the preclearance program. The State of Queensland, Australia, is used as a case study. The investigation focuses on three aspects; the first emphasizes on identifying the need for improvement of the current regulation programs in Queensland. Second, the operators of existing preclearance programs are interviewed for their lessons-learned and the marketing strategies used for promoting their programs. The trucking companies in Queensland are interviewed for their experiences with the current weighing practices and attitudes toward the potential preclearance system. Finally, the estimated benefit of the preclearance program deployment in Queensland is analyzed. The penultimate part brings the former four parts together and provides the study findings and recommendations. The framework and study findings could be valuable inputs for other roadway agencies considering a similar preclearance program or looking to promote their existing ones.