900 resultados para Architectural metal-work.


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This edited book brings together empirical studies of young people in paid employment from a variety of disciplinary perspectives and in different national settings. In the context of increasing youth labour market participation rates and debates about the value of early employment, it draws on multi-level analyses to reflect the complexity of the field. Each of the three sections of the book explores a key aspect of young people's employment: their experience of work, intersections between work and education, and the impact of other actors and institutions. The book contributes to broadening and strengthening knowledge about the opportunities and constraints that young people face during their formative experiences in the labour market.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The exchange pavilion offers a dialogue between two Expositions: 1998 in Brisbane and 2010 in Shanghai; and a chance to examine the impact that climate change will have on urban best practice outcomes in cities of the future. The Exchange exhibits the proposition that environmentally sustainable buildings need to interact responsively with a range of technical innovations to enable communities (and hence cities) to control and better manage their immediate environment. The 'Exchange' pavilion is a design experiment that integrates 3 key research elements: * An interactive digital exchange * A living green system wall (vertical and temporal) * A public urban star (horizontal and spatial) The proposition argues that the environmentally sustainability of any city is reliant on harnessing the full spectrum of intellectual and creative capital of the winder community (from universities to Government bodies to citizens) - a true knowledge city.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bio-diverse-city was a group exhibition curated by Barry Fitzpatrick, showcasing different approaches to designing for resilient and sustainable futures. Elastic urbanism was exhibited within the framework of artworks exploring the different solutions to designing for the future. A design proposition for new models of sustainable and ecological urban growth structured around natural water and infrastructure. The project integrates four different modelling techniques and is developing an alternative system for predicting the impact of urban growth in the future. The design proposition and exhibition is part of an ongoing research project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project involved the complete refurbishment and extension of a 1980’s two-storey domestic brick building, previously used as a Boarding House (Class 3), into Middle School facilities (Class 9b) on a heritage listed site at Nudgee College secondary school, Brisbane. The building now accommodates 12 technologically advanced classrooms, computer lab and learning support rooms, tuckshop, art room, mini library/reading/stage area, dedicated work areas for science and large projects with access to water on both floors, staff facilities and an undercover play area suitable for assemblies and presentations. The project was based on a Reggio Emilia approach, in which the organisation of the physical environment is referred to as the child’s third teacher, creating opportunities for complex, varied, sustained and changing relationships between people and ideas. Classrooms open to a communal centre piazza and are integrated with the rest of the school and the school with the surrounding community. In order to achieve this linkage of the building with the overall masterplan of the site, a key strategy of the internal planning was to orientate teaching areas around a well defined active circulation space that breaks out of the building form to legibly define the new access points to the building and connect up to the pathway network of the campus. The width of the building allowed for classrooms and a generous corridor that has become ‘breakout’ teaching areas for art, IT, and small group activities. Large sliding glass walls allow teachers to maintain supervision of students across all areas and allow maximum light penetration through small domestic window openings into the deep and low-height spaces. The building was also designed with an effort to uphold cultural characteristics from the Edmund Rice Education Charter (2004). Coherent planning is accompanied by a quality fit-out, creating a vibrant and memorable environment in which to deliver the upper primary curriculum. Consistent with the Reggio Emilia approach, materials, expressive of the school’s colours, are used in a contemporary, adventurous manner to create panels of colour useful for massing and defining the ‘breakout’ teaching areas and paths of travel, and storage elements are detailed and arranged to draw attention to their aesthetic features. Modifications were difficult due to the random placement of load bearing walls, minimum ceiling heights, the general standard of finishes and new fire and energy requirements, however the reuse of this building was assessed to be up to 30% cheaper than an equivalent new building, The fit out integrates information technology and services at a level not usually found in primary school facilities. This has been achieved within the existing building fabric through thoughtful detailing and co-ordination with allied disciplines.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The case study 3 team viewed the mitigation of noise and air pollution generated in the transport corridor that borders the study site to be a paramount driver of the urban design solution. These key urban planning strategies were adopted: * Spatial separation from transport corridor pollution source. A linear green zone and environmental buffer was proposed adjacent to the transport corridor to mitigate the environmental noise and air quality impacts of the corridor, and to offer residents opportunities for recreation * Open space forming the key structural principle for neighbourhood design. A significant open space system underpins the planning and manages surface water flows. * Urban blocks running on east-west axis. The open space rationale emphasises an east-west pattern for local streets. Street alignment allows for predominantly north-south facing terrace type buildings which both face the street and overlook the green courtyard formed by the perimeter buildings. The results of the ESD assessment of the typologies conclude that the design will achieve good outcomes through: * Lower than average construction costs compared with other similar projects * Thermal comfort; A good balance between daylight access and solar gains is achieved * The energy rating achieved for the units is 8.5 stars.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The QUT Team developed an idea for a new residential housing typology that is appropriate for sites where the best views are in the opposing direction to the preferable climatic orientation. The interlocking configuration creates a double height external living space in every apartment, creating further opportunities for cross ventilation and natural daylight. Unlike conventional double loaded housing typologies, the interlocking configuration only requires a continuous public circulation corridor every second level. The cores that service this corridor are separated to either end of the tower and open areas. The configuration of the interlocking apartments creates an interesting composition of solid and void when viewed externally. This undulating facade petternation assists in articulating the large building mass. The project was evaluated by independent consultants and found to be cost effective, and at the same time delivering energy efficient high density liveability. The project was presented to a meeting of the Australian Council on Tall Buildings seminar on 15 September 2010.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The design grows out of the rich culture of circus and the rugged dynamic topography of Chongqing. The site for this project is nestled on the banks of the mighty Yangzte, China's longest river: a vast sweeping watery ribbon carving its way through the mountainous terrain. This swirling sinuous environmental thread replicates in nature the tweisting ribbons circling the gyrating circus gymnast. The project grows from intertwining these swirling parallel conceptions of 'ribbon'. A multi-layered envelope of glass and steel ribbons creates a dome like enclosure that wraps itself around the dynamic performing heart of the circus. The main auditorium and stage area are accommodated in this space. Key public elements and facilities are located adjacent to the new riverfront boulevard maximising the positive relationship with this attractive landscape zone. Service and support areas are located along the southern boundary. Key Statistics; Client: Chongqing Broadcast Bureau Developer: Chongqing Real Estate Site: 3.3 Ha Development: Total G.F.A.: 36,800m2 Project Cost: Total Investment: RMB 300 Million (A$48 million) Other competition participants were BIG-Bjarke Ingels Group (Denmark)/arquitectonica (USA)/Beijing Architectural Design Institute/East China Architectural Design Institute/China Architectural Design Academy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The main limitations with existing fungal spore traps are that they are stationary and cannot be used in inaccessible or remote areas of Australia. This may result in delayed assessment, possible spread of harmful crop infestations and loss of crop yield and productivity. Fitted with the developed smart spore trap the UAV can fly, detect and monitor spores of plant pathogens in areas which previously were almost impossible to monitor. The technology will allow for earlier detection of emergency plant pests (EPPs) incursions by providing efficient and effective airborne surveillance, helping to protect Australia’s crops, pastures and the environment. The project is led by the Cooperative Research Centre for National Plant Biosecurity, with ARCAA/ QUT, CSIRO and the Queensland Government also providing resources. The prototype airplane was exhibited at the Innovation in Australia event December 7.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose - The web is now a significant component of the recruitment and job search process. However, very little is known about how companies and job seekers use the web, and the ultimate effectiveness of this process. The specific research questions guiding this study are: how do people search for job-related information on the web? How effective are these searches? And how likely are job seekers to find an appropriate job posting or application? Design/methodology/approach - The data used to examine these questions come from job seekers submitting job-related queries to a major web search engine at three points in time over a five-year period. Findings - Results indicate that individuals seeking job information generally submit only one query with several terms and over 45 percent of job-seeking queries contain a specific location reference. Of the documents retrieved, findings suggest that only 52 percent are relevant and only 40 percent of job-specific searches retrieve job postings. Research limitations/implications - This study provides an important contribution to web research and online recruiting literature. The data come from actual web searches, providing a realistic glimpse into how job seekers are actually using the web. Practical implications - The results of this research can assist organizations in seeking to use the web as part of their recruiting efforts, in designing corporate recruiting web sites, and in developing web systems to support job seeking and recruiting. Originality/value - This research is one of the first studies to investigate job searching on the web using longitudinal real world data. © Emerald Group Publishing Limited.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The mineral schlossmacherite (H3O,Ca)Al3(AsO4,PO4,SO4)2(OH)6 , a multi-cation-multi-anion mineral of the beudantite mineral subgroup has been characterised by Raman spectroscopy. The mineral and related minerals functions as a heavy metal collector and is often amorphous or poorly crystalline, such that XRD identification is difficult. The Raman spectra are dominated by an intense band at 864 cm-1, assigned to the symmetric stretching mode of the AsO43- anion. Raman bands at 809 and 819 cm-1 are assigned to the antisymmetric stretching mode of AsO43- . The sulphate anion is characterised by bands at 1000 cm-1 (ν1), and at 1031, 1082 and 1139 cm-1 (ν3). Two sets of bands in the OH stretching region are observed: firstly between 2800 and 3000 cm-1 with bands observed at 2850, 2868, 2918 cm-1 and secondly between 3300 and 3600 with bands observed at 3363, 3382, 3410, 3449 and 3537 cm-1. These bands enabled the calculation of hydrogen bond distances and show a wide range of H-bond distances.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recent surveys of information technology management professionals show that understanding business domains in terms of business productivity and cost reduction potential, knowledge of different vertical industry segments and their information requirements, understanding of business processes and client-facing skills are more critical for Information Systems personnel than ever before. In an attempt to restrucuture the information systems curriculum accordingly, our view it that information systems students need to develop an appreciation for organizational work systems in order to understand the operation and significance of information systems within such work systems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Flexible work practices spreading work times across the entire week have reduced the time to engage in leisure activities and for some have compounded the problem of a lack of defined break between work weeks. This study examines time spent outside of the workplace through a multiple case study of working time and leisure in the construction industry. A framework of synchronous leisure is used to examine the interplay of work and non-work arrangements. The effects of changing work arrangements to deliver a longer break between working weeks and the consequent impact on leisure activities are analysed. Interviews and focus groups across four construction sites revealed that while leisure is important to relieve fatigue and overwork, a work schedule allowing a long break between working weeks, specifically on a weekend, enables workers to achieve synchronous time, particularly with family, and improves work-life balance satisfaction. It was found that a well-defined break across a weekend also offers the opportunity to synchronize schedules with others to spend time away on short breaks.