838 resultados para Action design research (ADR)


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The authors have post-tensioned and monitored two Iowa bridges and have field tested the post-tensioning of a composite bridge in Florida. In order to provide the practical post-tensioning distribution factors given in this manual, the authors developed a finite element model of a composite bridge and checked the model against a one-half scale laboratory bridge and two actual composite bridges, one of which had a 45 deg skew. Following a brief discussion of this background research, this manual explains the use of elastic, composite beam and bridge section properties, the distribution fractions for symmetrically post-tensioned exterior beams, and a method for computing the strength of a post-tensioned beam. Also included is a design example for a typical, 51.25-ft (15.62-m) span, four-beam composite bridge. Moments for Iowa Department of Transportation rating trucks, H 20 and HS 20 trucks, have been tabulated for design convenience and are included in the appendix.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Recent construction of new generation power plants burning western coal within Iowa has resulted in fly Ash production on the order of 760,000 tons annually. Although fly ash has long been accepted as a valuable replacement for portland cement in concrete, most experience has been with fly ash generated from eastern bituminous coals. A few years ago, fly ash in Iowa was not a significant factor because production was small and economics dictated disposal as the better alternative than construction use. Today, the economic climate, coupled with abundance of the material, makes constructive use in concrete feasible. The problem is, however, fly ash produced from new power plants is different than that for which information was available. It seems fly ash types have outgrown existing standards. The objective of this study was to develop fundamental information about fly ashes available to construction in Iowa such that its advantages and limitations as replacement to portland cement can be defined. Evaluative techniques used in this work involve sophisticated laboratory equipment, not readily available to potential fly ash users, so a second goal was preliminary development of rapid diagnostic tests founded on fundamental information. Lastly, Iowa Department of Transportation research indicated an interesting interdependency among coarse aggregate type, fly ash and concrete's resistance to freeze-thaw action. Thus a third charge of this research project was to verify and determine the cause for the phenomena. One objective of this project was to determine properties of Iowa fly ashes and evaluate their relevance to use of the material as an admixture of PCC. This phase of the research involved two approaches. The first involved the development of a rapid method for determining quantitative elemental composition while the second was aimed at both qualitative and quantitative determination of compounds. X-ray fluorescence techniques were adapted for rapid determination of elemental composition of fly ash. The analysis was performed using a Siemens SR-200 sequential x-ray spectrometer controlled by a PDP-11-03 microcomputer. The spectrometer was equipped with a ten sample specimen chamber and four interchangeable analyzing crystals. Unfiltered excitation radiation was generated using a chromium tube at 50 KV and 48 ma. Programs for the spectrometer were developed by the Siemens Corporation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Culverts are common means to convey flow through the roadway system for small streams. In general, larger flows and road embankment heights entail the use of multibarrel culverts (a.k.a. multi-box) culverts. Box culverts are generally designed to handle events with a 50-year return period, and therefore convey considerably lower flows much of the time. While there are no issues with conveying high flows, many multi-box culverts in Iowa pose a significant problem related to sedimentation. The highly erosive Iowa soils can easily lead to the situation that some of the barrels can silt-in early after their construction, becoming partially filled with sediment in few years. Silting can reduce considerably the capacity of the culvert to handle larger flow events. Phase I of this Iowa Highway Research Board project (TR-545) led to an innovative solution for preventing sedimentation. The solution was comprehensively investigated through laboratory experiments and numerical modeling aimed at screening design alternatives and testing their hydraulic and sediment conveyance performance. Following this study phase, the Technical Advisory Committee suggested to implement the recommended sediment mitigation design to a field site. The site selected for implementation was a 3-box culvert crossing Willow Creek on IA Hwy 1W in Iowa City. The culvert was constructed in 1981 and the first cleanup was needed in 2000. Phase II of the TR 545 entailed the monitoring of the site with and without the selfcleaning sedimentation structure in place (similarly with the study conducted in laboratory). The first monitoring stage (Sept 2010 to December 2012) was aimed at providing a baseline for the operation of the as-designed culvert. In order to support Phase II research, a cleanup of the IA Hwy 1W culvert was conducted in September 2011. Subsequently, a monitoring program was initiated to document the sedimentation produced by individual and multiple storms propagating through the culvert. The first two years of monitoring showed inception of the sedimentation in the first spring following the cleanup. Sedimentation continued to increase throughout the monitoring program following the depositional patterns observed in the laboratory tests and those documented in the pre-cleaning surveys. The second part of Phase II of the study was aimed at monitoring the constructed self-cleaning structure. Since its construction in December 2012, the culvert site was continuously monitored through systematic observations. The evidence garnered in this phase of the study demonstrates the good performance of the self-cleaning structure in mitigating the sediment deposition at culverts. Besides their beneficial role in sediment mitigation, the designed self-cleaning structures maintain a clean and clear area upstream the culvert, keep a healthy flow through the central barrel offering hydraulic and aquatic habitat similar with that in the undisturbed stream reaches upstream and downstream the culvert. It can be concluded that the proposed self-cleaning structural solution “streamlines” the area upstream the culvert in a way that secures the safety of the culvert structure at high flows while producing much less disturbance in the stream behavior compared with the current constructive approaches.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Expansion joints increase both the initial cost and the maintenance cost of bridges. Integral abutment bridges provide an attractive design alternative because expansion joints are eliminated from the bridge itself. However, the piles in these bridges are subjected to horizontal movement as the bridge expands and contracts during temperature changes. The objective of this research was to develop a method of designing piles for these conditions. Separate field tests simulating a pile and a bridge girder were conducted for three loading cases: (1) vertical load only, (2) horizontal displacement of pile head only, and (3) combined horizontal displacement of pile head with subsequent vertical load. Both tests (1) and (3) reached the same ultimate vertical load, that is, the horizontal displacement had no effect on the vertical load capacity. Several model tests were conducted in sand with a scale factor of about 1:10. Experimental results from both the field and model tests were used to develop the vertical and horizontal load-displacement properties of the soil. These properties were input into the finite element computer program Integral Abutment Bridge Two-Dimensional (IAB2D), which was developed under a previous research contract. Experimental and analytical results compared well for the test cases. Two alternative design methods, both based upon the American Association of State Highway and Transportation Officials (AASHTO) Specification, were developed. Alternative One is quite conservative relative to IAB2D results and does not permit plastic redistribution of forces. Alternative Two is also conservative when compared to IAB2D, but plastic redistribution is permitted. To use Alternative Two, the pile cross section must have sufficient inelastic rotation capacity before local buckling occurs. A design example for a friction pile and an end-bearing pile illustrates both alternatives.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

BACKGROUND: Aromatase inhibitors provide superior disease control when compared with tamoxifen as adjuvant therapy for postmenopausal women with endocrine-responsive early breast cancer. PURPOSE: To present the design, history, and analytic challenges of the Breast International Group (BIG) 1-98 trial: an international, multicenter, randomized, double-blind, phase-III study comparing the aromatase inhibitor letrozole with tamoxifen in this clinical setting. METHODS: From 1998-2003, BIG 1-98 enrolled 8028 women to receive monotherapy with either tamoxifen or letrozole for 5 years, or sequential therapy of 2 years of one agent followed by 3 years of the other. Randomization to one of four treatment groups permitted two complementary analyses to be conducted several years apart. The first, reported in 2005, provided a head-to-head comparison of letrozole versus tamoxifen. Statistical power was increased by an enriched design, which included patients who were assigned sequential treatments until the time of the treatment switch. The second, reported in late 2008, used a conditional landmark approach to test the hypothesis that switching endocrine agents at approximately 2 years from randomization for patients who are disease-free is superior to continuing with the original agent. RESULTS: The 2005 analysis showed the superiority of letrozole compared with tamoxifen. The patients who were assigned tamoxifen alone were unblinded and offered the opportunity to switch to letrozole. Results from other trials increased the clinical relevance about whether or not to start treatment with letrozole or tamoxifen, and analysis plans were expanded to evaluate sequential versus single-agent strategies from randomization. LIMITATIONS: Due to the unblinding of patients assigned tamoxifen alone, analysis of updated data will require ascertainment of the influence of selective crossover from tamoxifen to letrozole. CONCLUSIONS: BIG 1-98 is an example of an enriched design, involving complementary analyses addressing different questions several years apart, and subject to evolving analytic plans influenced by new data that emerge over time.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Since integral abutment bridges decrease the initial and maintenance costs of bridges, they provide an attractive alternative for bridge designers. The objective of this project is to develop rational and experimentally verified design recommendations for these bridges. Field testing consisted of instrumenting two bridges in Iowa to monitor air and bridge temperatures, bridge displacements, and pile strains. Core samples were also collected to determine coefficients of thermal expansion for the two bridges. Design values for the coefficient of thermal expansion of concrete are recommended, as well as revised temperature ranges for the deck and girders of steel and concrete bridges. A girder extension model is developed to predict the longitudinal bridge displacements caused by changing bridge temperatures. Abutment rotations and passive soil pressures behind the abutment were neglected. The model is subdivided into segments that have uniform temperatures, coefficients of expansion, and moduli of elasticity. Weak axis pile strains were predicted using a fixed-head model. The pile is idealized as an equivalent cantilever with a length determined by the surrounding soil conditions and pile properties. Both the girder extension model and the fixed-head model are conservative for design purposes. A longitudinal frame model is developed to account for abutment rotations. The frame model better predicts both the longitudinal displacement and weak axis pile strains than do the simpler models. A lateral frame model is presented to predict the lateral motion of skewed bridges and the associated strong axis pile strains. Full passive soil pressure is assumed on the abutment face. Two alternatives for the pile design are presented. Alternative One is the more conservative and includes thermally induced stresses. Alternative Two neglects thermally induced stresses but allows for the partial formation of plastic hinges (inelastic redistribution of forces). Ductility criteria are presented for this alternative. Both alternatives are illustrated in a design example.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

BACKGROUND: Many clinical studies are ultimately not fully published in peer-reviewed journals. Underreporting of clinical research is wasteful and can result in biased estimates of treatment effect or harm, leading to recommendations that are inappropriate or even dangerous. METHODS: We assembled a cohort of clinical studies approved 2000-2002 by the Research Ethics Committee of the University of Freiburg, Germany. Published full articles were searched in electronic databases and investigators contacted. Data on study characteristics were extracted from protocols and corresponding publications. We characterized the cohort, quantified its publication outcome and compared protocols and publications for selected aspects. RESULTS: Of 917 approved studies, 807 were started and 110 were not, either locally or as a whole. Of the started studies, 576 (71%) were completed according to protocol, 128 (16%) discontinued and 42 (5%) are still ongoing; for 61 (8%) there was no information about their course. We identified 782 full publications corresponding to 419 of the 807 initiated studies; the publication proportion was 52% (95% CI: 0.48-0.55). Study design was not significantly associated with subsequent publication. Multicentre status, international collaboration, large sample size and commercial or non-commercial funding were positively associated with subsequent publication. Commercial funding was mentioned in 203 (48%) protocols and in 205 (49%) of the publications. In most published studies (339; 81%) this information corresponded between protocol and publication. Most studies were published in English (367; 88%); some in German (25; 6%) or both languages (27; 6%). The local investigators were listed as (co-)authors in the publications corresponding to 259 (62%) studies. CONCLUSION: Half of the clinical research conducted at a large German university medical centre remains unpublished; future research is built on an incomplete database. Research resources are likely wasted as neither health care professionals nor patients nor policy makers can use the results when making decisions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"Metric Training For The Highway Industry", HR-376 was designed to produce training materials for the various divisions of the Iowa DOT, local government and the highway construction industry. The project materials were to be used to introduce the highway industry in Iowa to metric measurements in their daily activities. Five modules were developed and used in training over 1,000 DOT, county, city, consultant and contractor staff in the use of metric measurements. The training modules developed deal with the planning through operation areas of highway transportation. The materials and selection of modules were developed with the aid of an advisory personnel from the highway industry. Each module is design as a four hour block of instruction and a stand along module for specific types of personnel. Each module is subdivided into four chapters with chapter one and four covering general topics common to all subjects. Chapters two and three are aimed at hands on experience for a specific group and subject. This module includes: Module 3 - Road and Bridge Design. This module provides hands on examples of how to use metric measurements in the design of roads and structures.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Discarded tires present major disposal and environmental problems. One method of recycling tires is to use finely ground rubber from tires in asphalt cement concrete (ACC). This process has been researched in Iowa since 1991. There are currently eight projects being researched. This project involved using crumb rubber modifier (CRM) in ACC using a dry process. This project is located on US 63 in Howard County. It involved 17 test sections. There were five test sections using 20 lb of CRM per ton, four test sections using 10 lb of CRM per ton and eight test sections using a conventional mix. Not only were different mixes used, but the overlay was also placed in various thicknesses ranging from 2 in. to 8 in. (5 cm to 20 cm). The project was completed in August 1994. The project construction went well with only minor problems. This report contains information about procedures and tests that were completed and those that will be completed. Evaluation on the project will continue for five years.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A review of the Iowa Department of Transportation's field data collection and reporting system has been performed. Included were several systems used by the Office of Construction and Local Jurisdictions. The entire field data collection and reporting systems for asphalt cement concrete (ACC) paving, portland cement concrete (PCC) paving, and PCC structures were streamlined and computerized. The field procedures for materials acceptance were also reviewed. Best practices were identified and a method was developed to prioritize materials so transportation agencies could focus their efforts on high priority materials. Iowa State University researchers facilitated a discussion about Equal Employment Opportunity (EEO) and Affirmative Action (AA) procedures between the Office of Construction field staff and the Office of Contracts. A set of alternative procedures was developed. Later the Office of Contracts considered these alternatives as they developed new procedures that are currently being implemented. The job close-out package was reviewed and two unnecessary procedures were eliminated. Numerous other procedures were reviewed and flowcharted. Several changes have been recommended that will increase efficiency and allow staff time to be devoted to higher priority activities. It is estimated the improvements in ACC paving, PCC paving and structural concrete will by similar to three full time equivalent (FTE) positions to field construction, field materials and Office of Materials. Elimination of EEO interviews will be equivalent to one FTE position. It is estimated that other miscellaneous changes will be equivalent to at least one other FTE person. This is a total five FTEs. These are conservative estimates based on savings that are easily quantified. It is likely that total positive effect is greater when items that are difficult to quantify are considered.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

BACKGROUND: A few recent studies have found indications of the effectiveness of inpatient psychotherapy for depression, usually of an extended duration. However, there is a lack of controlled studies in this area and to date no study of adequate quality on brief psychodynamic psychotherapy for depression during short inpatient stay exists. The present article describes the protocol of a study that will examine the relative efficacy, the cost-effectiveness and the cost-utility of adding an Inpatient Brief Psychodynamic Psychotherapy to pharmacotherapy and treatment-as-usual for inpatients with unipolar depression. METHODS/DESIGN: The study is a one-month randomized controlled trial with a two parallel group design and a 12-month naturalistic follow-up. A sample of 130 consecutive adult inpatients with unipolar depression and Montgomery-Asberg Depression Rating Scale score over 18 will be recruited. The study is carried out in the university hospital section for mood disorders in Lausanne, Switzerland. Patients are assessed upon admission, and at 1-, 3- and 12- month follow-ups. Inpatient therapy is a manualized brief intervention, combining the virtues of inpatient setting and of time-limited dynamic therapies (focal orientation, fixed duration, resource-oriented interventions). Treatment-as-usual represents the best level of practice for a minimal treatment condition usually proposed to inpatients. Final analyses will follow an intention-to-treat strategy. Depressive symptomatology is the primary outcome and secondary outcome includes measures of psychiatric symptomatology, psychosocial role functioning, and psychodynamic-emotional functioning. The mediating role of the therapeutic alliance is also examined. Allocation to treatment groups uses a stratified block randomization method with permuted block. To guarantee allocation concealment, randomization is done by an independent researcher. DISCUSSION: Despite the large number of studies on treatment of depression, there is a clear lack of controlled research in inpatient psychotherapy during the acute phase of a major depressive episode. Research on brief therapy is important to take into account current short lengths of stay in psychiatry. The current study has the potential to scientifically inform appropriate inpatient treatment. This study is the first to address the issue of the economic evaluation of inpatient psychotherapy. TRIAL REGISTRATION: Australian New Zealand Clinical Trial Registry (ACTRN12612000909820).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Recent reports have indicated that 23.5% of the nation's highway bridges are structurally deficient and 17.7% are functionally obsolete. A significant number of these bridges are on the Iowa secondary road system where over 86% of the rural bridge management responsibilities are assigned to the counties. Some of the bridges can be strengthened or otherwise rehabilitated, but many more are in need of immediate replacement. In a recent investigation (HR-365 "Evaluation of Bridge Replacement Alternatives for the County Bridge System") several types of replacement bridges that are currently being used on low volume roads were identified. It was also determined that a large number of counties (69%) have the ability and are interested in utilizing their own forces to design and construct short span bridges. After reviewing the results from HR-365, the research team developed one "new" bridge replacement concept and a modification of a replacement system currently being used. Both of these bridge replacement alternatives were investigated in this study, the results of which are presented in two volumes. This volume (Volume 2) presents the results of Concept 2 - Modification of the Beam-in-Slab Bridge. Concept 1 - Steel Beam Precast Units is presented in Volume 1. Concept 2 involves various laboratory tests of the Beam-in-Slab bridge (BISB) currently being used by Benton County and several other Iowa counties. In this investigation, the behavior and strength of the BISB were determined; a new method of obtaining composite action between the steel beams and concrete was also tested. Since the Concept 2 bridge is primarily intended for use on low-volume roads, the system can be constructed with new or used beams. In the experimental part of the investigation, there were three types of laboratory tests: push-out tests, service and ultimate load tests of models of the BISB, and composite beam tests utilizing the newly developed shear connection. In addition to the laboratory tests, there was a field test in which an existing BISB was service load tested. An equation was developed for predicting the strength of the shear connection investigated; in addition, a finite element model for analyzing the BISB was also developed. Push-out tests were completed to determine the strength of the recently developed shear connector. A total of 36 specimens were tested, with variables such as hole diameter, hole spacing, presence of reinforcement, etc. being investigated. In the model tests of the BISB, two and four beam specimens [L=9,140 mm (30 ft)] were service load tested for behavior and load distribution data. Upon completion of these tests, both specimens were loaded to failure. In the composite beam tests, four beams, one with standard shear studs and three using the shear connection developed, were tested. Upon completion of the service load tests, all four beams were loaded to failure. The strength and behavior of the beams with the new shear connection were found to be essentially the same as that of the specimen with standard shear studs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

BACKGROUND: Upper limb paresis remains a relevant challenge in stroke rehabilitation. AIM: To evaluate if adding mirror therapy (MT) to conventional therapy (CT) can improve motor recovery of the upper limb in subacute stroke patients. DESIGN: Prospective, single-center, single-blind, randomised, controlled trial. SETTING: Subacute stroke patients referred to a Physical and Rehabilitation Medicine Unit between October 2009 and August 2011. POPULATION: Twenty-six subacute stroke patients (time from stroke <4 weeks) with upper limb paresis (Motricity Index â0/00¤ 77). METHODS: Patients were randomly allocated to the MT (N.=13) or to the CT group (N.=13). Both followed a comprehensive rehabilitative treatment. In addition, MT Group had 30 minutes of MT while the CT group had 30 minutes of sham therapy. Action Research Arm Test (ARAT) was the primary outcome measures. Motricity Index (MI) and the Functional Independence Measure (FIM) were the secondary outcome measures. RESULTS: After one month of treatment patients of both groups showed statistically significant improvements in all the variables measured (P<0.05). Moreover patients of the MT group had greater improvements in the ARAT, MI and FIM values compared to CT group (P<0.01, Glass's Î" Effect Size: 1.18). No relevant adverse event was recorded during the study. CONCLUSION: MT is a promising and easy method to improve motor recovery of the upper limb in subacute stroke patients. CLINICAL REHABILITATION IMPACT: While MT use has been advocated for acute patients with no or negligible motor function, it can be usefully extended to patients who show partial motor recovery. The easiness of implementation, the low cost and the acceptability makes this therapy an useful tool in stroke rehabilitation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This project continues the research which addresses the numerous bridge problems on the Iowa secondary road system. It is a continuation (Phase 2) of Project HR-382, in which two replacement alternatives (Concept 1: Steel Beam Precast Units and Concept 2: Modification of the Benton County Beam-in-Slab Bridge) were investigated. In previous research for concept 1, a precast unit bridge was developed through laboratory testing. The steel-beam precast unit bridge requires the fabrication of precast double-tee (PCDT) units, each consisting of two steel beams connected by a reinforced concrete deck. The weight of each PCDT unit is minimized by limiting the deck thickness to 4 in., which permits the units to be constructed off-site and then transported to the bridge site. The number of units required is a function of the width of bridge desired. Once the PCDT units are connected, a cast-in-place reinforced concrete deck is cast over the PCDT units and the bridge railing attached. Since the steel beam PCDT unit bridge design is intended primarily for use on low-volume roads, used steel beams can be utilized for a significant cost savings. In previous research for concept 2, an alternate shear connector (ASC) was developed and subjected to static loading. In this investigation, the ASC was subjected to cyclic loading in both pushout specimens and composite beam tests. Based on these tests, the fatigue strength of the ASC was determined to be significantly greater than that required in typical low volume road single span bridges. Based upon the construction and service load testing, the steel-beam precast unit bridge was successfully shown to be a viable low volume road bridge alternative. The construction process utilized standard methods resulting in a simple system that can be completed with a limited staff. Results from the service load tests indicated adequate strength for all legal loads. An inspection of the bridge one year after its construction revealed no change in the bridge's performance. Each of the systems previously described are relatively easy to construct. Use of the ASC rather than the welded studs significantly simplified the work, equipment, and materials required to develop composite action between the steel beams and the concrete deck.