868 resultados para ostoprosessi, ajankäyttö, time-based management


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Dynamic optimization methods have become increasingly important over the last years in economics. Within the dynamic optimization techniques employed, optimal control has emerged as the most powerful tool for the theoretical economic analysis. However, there is the need to advance further and take account that many dynamic economic processes are, in addition, dependent on some other parameter different than time. One can think of relaxing the assumption of a representative (homogeneous) agent in macro- and micro-economic applications allowing for heterogeneity among the agents. For instance, the optimal adaptation and diffusion of a new technology over time, may depend on the age of the person that adopted the new technology. Therefore, the economic models must take account of heterogeneity conditions within the dynamic framework. This thesis intends to accomplish two goals. The first goal is to analyze and revise existing environmental policies that focus on defining the optimal management of natural resources over time, by taking account of the heterogeneity of environmental conditions. Thus, the thesis makes a policy orientated contribution in the field of environmental policy by defining the necessary changes to transform an environmental policy based on the assumption of homogeneity into an environmental policy which takes account of heterogeneity. As a result the newly defined environmental policy will be more efficient and likely also politically more acceptable since it is tailored more specifically to the heterogeneous environmental conditions. Additionally to its policy orientated contribution, this thesis aims making a methodological contribution by applying a new optimization technique for solving problems where the control variables depend on two or more arguments --- the so-called two-stage solution approach ---, and by applying a numerical method --- the Escalator Boxcar Train Method --- for solving distributed optimal control problems, i.e., problems where the state variables, in addition to the control variables, depend on two or more arguments. Chapter 2 presents a theoretical framework to determine optimal resource allocation over time for the production of a good by heterogeneous producers, who generate a stock externalit and derives government policies to modify the behavior of competitive producers in order to achieve optimality. Chapter 3 illustrates the method in a more specific context, and integrates the aspects of quality and time, presenting a theoretical model that allows to determine the socially optimal outcome over time and space for the problem of waterlogging in irrigated agricultural production. Chapter 4 of this thesis concentrates on forestry resources and analyses the optimal selective-logging regime of a size-distributed forest.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The main objective pursued in this thesis targets the development and systematization of a methodology that allows addressing management problems in the dynamic operation of Urban Wastewater Systems. The proposed methodology will suggest operational strategies that can improve the overall performance of the system under certain problematic situations through a model-based approach. The proposed methodology has three main steps: The first step includes the characterization and modeling of the case-study, the definition of scenarios, the evaluation criteria and the operational settings that can be manipulated to improve the system’s performance. In the second step, Monte Carlo simulations are launched to evaluate how the system performs for a wide range of operational settings combinations, and a global sensitivity analysis is conducted to rank the most influential operational settings. Finally, the third step consists on a screening methodology applying a multi-criteria analysis to select the best combinations of operational settings.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

El foc bacterià és una malaltia que afecta a plantes de la família de la rosàcies, causada pel bacteri Erwinia amylovora. El seu rang d'hostes inclou arbres fruiters, com la perera, la pomera o el codonyer, i plantes ornamentals de gran interès comercial i econòmic. Actualment, la malaltia s'ha dispersat i es troba àmpliament distribuïda en totes les zones de clima temperat del món. A Espanya, on la malaltia no és endèmica, el foc bacterià es va detectar per primer cop al 1995 al nord del país (Euskadi) i posteriorment, han aparegut varis focus en altres localitzacions, que han estat convenientment eradicats. El control del foc bacterià, és molt poc efectiu en plantes afectades per la malaltia, de manera que es basa en mesures encaminades a evitar la dispersió del patogen, i la introducció de la malaltia en regions no endèmiques. En aquest treball, la termoteràpia ha estat avaluada com a mètode d'eradicació d'E. amylovora de material vegetal de propagació asimptomàtic. S'ha demostrat que la termoteràpia és un mètode viable d'eradicar E. amylovora de material de propagació. Gairebé totes les espècies i varietats de rosàcies mantingudes en condicions d'humitat sobrevivien 7 hores a 45 ºC i més de 3 hores a 50 ºC, mentre que més d'1 hora d'exposició a 50 ºC amb calor seca produïa danys en el material vegetal i reduïa la brotació. Tractaments de 60 min a 45 ºC o 30 min a 50 ºC van ser suficients per reduir la població epífita d'E. amylovora a nivells no detectables (5 x 102 ufc g-1 p.f.) en branques de perera. Els derivats dels fosfonats i el benzotiadiazol són efectius en el control del foc bacterià en perera i pomera, tant en condicions de laboratori, com d'hivernacle i camp. Els inductors de defensa de les plantes redueixen els nivells de malaltia fins al 40-60%. Els intervals de temps mínims per aconseguir el millor control de la malaltia van ser 5 dies pel fosetil-Al, i 7 dies per l'etefon i el benzotiadiazol, i les dosis òptimes pel fosetil-Al i el benzotiadiazol van ser 3.72 g HPO32- L-1 i 150 mg i.a. L-1, respectivament. Es millora l'eficàcia del fosetil-Al i del benzotiadiazol en el control del foc bacterià, quan es combinen amb els antibiòtics a la meitat de la dosi d'aquests últims. Tot i que l'estratègia de barrejar productes és més pràctica i fàcil de dur a terme a camp, que l'estratègia de combinar productes, el millor nivell de control de la malaltia s'aconsegueix amb l'estratègia de combinar productes. Es va analitzar a nivell histològic i ultrastructural l'efecte del benzotiadiazol i dels fosfonats en la interacció Erwinia amylovora-perera. Ni el benzotiadiazol, ni el fosetil-Al, ni l'etefon van induir canvis estructurals en els teixits de perera 7 dies després de la seva aplicació. No obstant, després de la inoculació d'E. amylovora es va observar en plantes tractades amb fosetil-Al i etefon una desorganització estructural cel·lular, mentre que en les plantes tractades amb benzotiadiazol aquestes alteracions tissulars van ser retardades. S'han avaluat dos models (Maryblyt, Cougarblight) en un camp a Espanya afectat per la malaltia, per determinar la precisió de les prediccions. Es van utilitzar dos models per elaborar el mapa de risc, el BRS-Powell combinat i el BIS95 modificat. Els resultats van mostrar dos zones amb elevat i baix risc de la malaltia. Maryblyt i Cougarblight són dos models de fàcil ús, tot i que la seva implementació en programes de maneig de la malaltia requereix que siguin avaluats i validats per un període de temps més llarg i en àrees on la malaltia hi estigui present.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

La gestió de xarxes és un camp molt ampli i inclou molts aspectes diferents. Aquesta tesi doctoral està centrada en la gestió dels recursos en les xarxes de banda ampla que disposin de mecanismes per fer reserves de recursos, com per exemple Asynchronous Transfer Mode (ATM) o Multi-Protocol Label Switching (MPLS). Es poden establir xarxes lògiques utilitzant els Virtual Paths (VP) d'ATM o els Label Switched Paths (LSP) de MPLS, als que anomenem genèricament camins lògics. Els usuaris de la xarxa utilitzen doncs aquests camins lògics, que poden tenir recursos assignats, per establir les seves comunicacions. A més, els camins lògics són molt flexibles i les seves característiques es poden canviar dinàmicament. Aquest treball, se centra, en particular, en la gestió dinàmica d'aquesta xarxa lògica per tal de maximitzar-ne el rendiment i adaptar-la a les connexions ofertes. En aquest escenari, hi ha diversos mecanismes que poden afectar i modificar les característiques dels camins lògics (ample de banda, ruta, etc.). Aquests mecanismes inclouen els de balanceig de la càrrega (reassignació d'ample de banda i reencaminament) i els de restauració de fallades (ús de camins lògics de backup). Aquests dos mecanismes poden modificar la xarxa lògica i gestionar els recursos (ample de banda) dels enllaços físics. Per tant, existeix la necessitat de coordinar aquests mecanismes per evitar possibles interferències. La gestió de recursos convencional que fa ús de la xarxa lògica, recalcula periòdicament (per exemple cada hora o cada dia) tota la xarxa lògica d'una forma centralitzada. Això introdueix el problema que els reajustaments de la xarxa lògica no es realitzen en el moment en què realment hi ha problemes. D'altra banda també introdueix la necessitat de mantenir una visió centralitzada de tota la xarxa. En aquesta tesi, es proposa una arquitectura distribuïda basada en un sistema multi agent. L'objectiu principal d'aquesta arquitectura és realitzar de forma conjunta i coordinada la gestió de recursos a nivell de xarxa lògica, integrant els mecanismes de reajustament d'ample de banda amb els mecanismes de restauració preplanejada, inclosa la gestió de l'ample de banda reservada per a la restauració. Es proposa que aquesta gestió es porti a terme d'una forma contínua, no periòdica, actuant quan es detecta el problema (quan un camí lògic està congestionat, o sigui, quan està rebutjant peticions de connexió dels usuaris perquè està saturat) i d'una forma completament distribuïda, o sigui, sense mantenir una visió global de la xarxa. Així doncs, l'arquitectura proposada realitza petits rearranjaments a la xarxa lògica adaptant-la d'una forma contínua a la demanda dels usuaris. L'arquitectura proposada també té en consideració altres objectius com l'escalabilitat, la modularitat, la robustesa, la flexibilitat i la simplicitat. El sistema multi agent proposat està estructurat en dues capes d'agents: els agents de monitorització (M) i els de rendiment (P). Aquests agents estan situats en els diferents nodes de la xarxa: hi ha un agent P i diversos agents M a cada node; aquests últims subordinats als P. Per tant l'arquitectura proposada es pot veure com una jerarquia d'agents. Cada agent és responsable de monitoritzar i controlar els recursos als que està assignat. S'han realitzat diferents experiments utilitzant un simulador distribuït a nivell de connexió proposat per nosaltres mateixos. Els resultats mostren que l'arquitectura proposada és capaç de realitzar les tasques assignades de detecció de la congestió, reassignació dinàmica d'ample de banda i reencaminament d'una forma coordinada amb els mecanismes de restauració preplanejada i gestió de l'ample de banda reservat per la restauració. L'arquitectura distribuïda ofereix una escalabilitat i robustesa acceptables gràcies a la seva flexibilitat i modularitat.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an extension to existing buildings to provide a warehouse, services block and packing line. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of building provision can be viewed as systems and subsystems which are differentiated from each other at decision points. Further to this, the subsystems can be viewed as the interaction of managing system and operating system. Using Walker's model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficacy of the organizational structure used. The causes of the client's dissatisfaction with the outcome of the project were lack of integration and complexity of the managing system. However, there was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's propositions.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Olsen method is an indicator of plant-available phosphorus (P). The effect of time and temperature on residual phosphate in soils was measured using the Olsen method in a pot experiment. Four soils were investigated: two from Pakistan and one each from England (calcareous) and Colombia (acidic). Two levels of residual phosphate were developed in each soil after addition of phosphate by incubation at either 10degreesC or 45degreesC. The amount of phosphate added was based on the P maximum of each soil, calculated using the Langmuir equation. Rvegrass was used as the test crop. The pooled data for the four soils incubated at 10degreesC showed good correlation between Olsen P and dry matter yield or P uptake (r(2) = 0.85 and 0.77, respectively), whereas at 45 degreesC, each soil had its own relationship and pooled data did not show correlation of Olsen P with dry matter yield or P uptake. When the data at both temperatures were pooled, Olsen P was a good indicator of yield and uptake for the English soil. For the Pakistani soils, Olsen P after 45 degreesC treatment was an underestimate relative to the 10 degreesC data and for the Colombian soil it was an overestimate. The reasons for these differences need to be explored further before high temperature incubation can be used to simulate long-term changes in the field.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The management of a public sector project is analysed using a model developed from systems theory. Linear responsibility analysis is used to identify the primary and key decision structure of the project and to generate quantitative data regarding differentiation and integration of the operating system, the managing system and the client/project team. The environmental context of the project is identified. Conclusions are drawn regarding the project organization structure's ability to cope with the prevailing environmental conditions. It is found that the complexity of the managing system imposed on the project was unable to achieve this and created serious deficiencies in the outcome of the project.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this paper we present an architecture for network and applications management, which is based on the Active Networks paradigm and shows the advantages of network programmability. The stimulus to develop this architecture arises from an actual need to manage a cluster of active nodes, where it is often required to redeploy network assets and modify nodes connectivity. In our architecture, a remote front-end of the managing entity allows the operator to design new network topologies, to check the status of the nodes and to configure them. Moreover, the proposed framework allows to explore an active network, to monitor the active applications, to query each node and to install programmable traps. In order to take advantage of the Active Networks technology, we introduce active SNMP-like MIBs and agents, which are dynamic and programmable. The programmable management agents make tracing distributed applications a feasible task. We propose a general framework that can inter-operate with any active execution environment. In this framework, both the manager and the monitor front-ends communicate with an active node (the Active Network Access Point) through the XML language. A gateway service performs the translation of the queries from XML to an active packet language and injects the code in the network. We demonstrate the implementation of an active network gateway for PLAN (Packet Language for Active Networks) in a forty active nodes testbed. Finally, we discuss an application of the active management architecture to detect the causes of network failures by tracing network events in time.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Smooth flow of production in construction is hampered by disparity between individual trade teams' goals and the goals of stable production flow for the project as a whole. This is exacerbated by the difficulty of visualizing the flow of work in a construction project. While the addresses some of the issues in Building information modeling provides a powerful platform for visualizing work flow in control systems that also enable pull flow and deeper collaboration between teams on and off site. The requirements for implementation of a BIM-enabled pull flow construction management software system based on the Last Planner System™, called ‘KanBIM’, have been specified, and a set of functional mock-ups of the proposed system has been implemented and evaluated in a series of three focus group workshops. The requirements cover the areas of maintenance of work flow stability, enabling negotiation and commitment between teams, lean production planning with sophisticated pull flow control, and effective communication and visualization of flow. The evaluation results show that the system holds the potential to improve work flow and reduce waste by providing both process and product visualization at the work face.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Crop production is inherently sensitive to variability in climate. Temperature is a major determinant of the rate of plant development and, under climate change, warmer temperatures that shorten development stages of determinate crops will most probably reduce the yield of a given variety. Earlier crop flowering and maturity have been observed and documented in recent decades, and these are often associated with warmer (spring) temperatures. However, farm management practices have also changed and the attribution of observed changes in phenology to climate change per se is difficult. Increases in atmospheric [CO2] often advance the time of flowering by a few days, but measurements in FACE (free air CO2 enrichment) field-based experiments suggest that elevated [CO2] has little or no effect on the rate of development other than small advances in development associated with a warmer canopy temperature. The rate of development (inverse of the duration from sowing to flowering) is largely determined by responses to temperature and photoperiod, and the effects of temperature and of photoperiod at optimum and suboptimum temperatures can be quantified and predicted. However, responses to temperature, and more particularly photoperiod, at supraoptimal temperature are not well understood. Analysis of a comprehensive data set of time to tassel initiation in maize (Zea mays) with a wide range of photoperiods above and below the optimum suggests that photoperiod modulates the negative effects of temperature above the optimum. A simulation analysis of the effects of prescribed increases in temperature (0-6 degrees C in + 1 degrees C steps) and temperature variability (0% and + 50%) on days to tassel initiation showed that tassel initiation occurs later, and variability was increased, as the temperature exceeds the optimum in models both with and without photoperiod sensitivity. However, the inclusion of photoperiod sensitivity above the optimum temperature resulted in a higher apparent optimum temperature and less variability in the time of tassel initiation. Given the importance of changes in plant development for crop yield under climate change, the effects of photoperiod and temperature on development rates above the optimum temperature clearly merit further research, and some of the knowledge gaps are identified herein.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

While building provides shelter for human being, the previous models for assessing the intelligence of a building seldom consider the responses of occupants. In addition, the assessment is usually conducted by an authority organization on a yearly basis, thus can seldom provide timely assistance for facility manager to improve his daily facility maintenance performance. By the extending the law of entropy into the area of intelligent building, this paper demonstrate that both energy consumption and the response of occupants are important when partially assessing the intelligence of a building. This study then develops a sensor based real time building intelligence (BI) assessment model. An experimental case study demonstrates how the model can be implemented. The developed model can address the two demerits of the previous BI assessment model.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper describes the development and validation of a novel web-based interface for the gathering of feedback from building occupants about their environmental discomfort including signs of Sick Building Syndrome (SBS). The gathering of such feedback may enable better targeting of environmental discomfort down to the individual as well as the early detection and subsequently resolution by building services of more complex issues such as SBS. The occupant's discomfort is interpreted and converted to air-conditioning system set points using Fuzzy Logic. Experimental results from a multi-zone air-conditioning test rig have been included in this paper.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose – Facilities managers have less visibility of how buildings are being used due to flexible working and unpredictable workers. The purpose of this paper is to examine the current issues in workspace management and an automatic solution through radio frequency identification (RFID) that could provide real time information on the volume and capacity of buildings. Design/methodology/approach – The study described in this paper is based on a case study at a facilities management (FM) department. The department is examining a ubiquitous technology in the form of innovative RFID for security and workspace management. Interviews and observations are conducted within the facilities department for the initial phase of the implementation of RFID technology. Findings – Research suggests that work methods are evolving and becoming more flexible. With this in mind, facilities managers face new challenges to create a suitable environment for an unpredictable workforce. RFID is one solution that could provide facilities managers with an automatic way of examining space in real time and over a wider area than currently possible. RFID alone for space management is financially expensive but by making the application multiple for other areas makes more business sense. Practical implications – This paper will provide practicing FM and academics with the knowledge gained from the application of RFID in this organisation. While the concept of flexible working seems attractive, there is an emerging need to provide various forms of spaces that enable employees' satisfaction and enhance the productivity of the organisation. Originality/value – The paper introduces new thinking on the subject of “workspace management”. It highlights the current difficulties in workspace management and how an RFID solution will benefit workspace methods.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Uncertainty contributes a major part in the accuracy of a decision-making process while its inconsistency is always difficult to be solved by existing decision-making tools. Entropy has been proved to be useful to evaluate the inconsistency of uncertainty among different respondents. The study demonstrates an entropy-based financial decision support system called e-FDSS. This integrated system provides decision support to evaluate attributes (funding options and multiple risks) available in projects. Fuzzy logic theory is included in the system to deal with the qualitative aspect of these options and risks. An adaptive genetic algorithm (AGA) is also employed to solve the decision algorithm in the system in order to provide optimal and consistent rates to these attributes. Seven simplified and parallel projects from a Hong Kong construction small and medium enterprise (SME) were assessed to evaluate the system. The result shows that the system calculates risk adjusted discount rates (RADR) of projects in an objective way. These rates discount project cash flow impartially. Inconsistency of uncertainty is also successfully evaluated by the use of the entropy method. Finally, the system identifies the favourable funding options that are managed by a scheme called SME Loan Guarantee Scheme (SGS). Based on these results, resource allocation could then be optimized and the best time to start a new project could also be identified throughout the overall project life cycle.