891 resultados para expert system, fuzzy logic, pan stage models, supervisory control


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the legal domain, it is rare to find solutions to problems by simply applying algorithms or invoking deductive rules in some knowledge‐based program. Instead, expert practitioners often supplement domain‐specific knowledge with field experience. This type of expertise is often applied in the form of an analogy. This research proposes to combine both reasoning with precedents and reasoning with statutes and regulations in a way that will enhance the statutory interpretation task. This is being attempted through the integration of database and expert system technologies. Case‐based reasoning is being used to model legal precedents while rule‐based reasoning modules are being used to model the legislation and other types of causal knowledge. It is hoped to generalise these findings and to develop a formal methodology for integrating case‐based databases with rule‐based expert systems in the legal domain.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The technical feasibility of roll motion control devices has been amply demonstrated for over 100 years. Performance, however, can still fall short of expectations because of deficiencies in control system designs, which have proven to be far from trivial due to fundamental performance limitations. This tutorial paper presents an account of the development of various ship roll motion control systems and the challenges associated with their design. The paper discusses how to assess performance, the applicability of different models, and control methods that have been applied in the past.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper suggests a supervisory control for storage units to provide load leveling in distribution networks. This approach coordinates storage units to charge during high generation and discharge during peak load times, while utilized to improve the network voltage profile indirectly. The aim of this control strategy is to establish power sharing on a pro rata basis for storage units. As a case study, a practical distribution network with 30 buses is simulated and the results are provided.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The continuous changing impacts appeared in all solution understanding approaches in the projects management field (especially in the construction field of work) by adopting dynamic solution paths. The paper will define what argue to be a better relational model for project management constraints (time, cost, and scope). This new model will increase the success factors of any complex program / project. This is a qualitative research adopting a new avenue of investigation by following different approach of attributing project activities with social phenomena, and supporting phenomenon with field of observations rather than mathematical method by emerging solution from human, and ants' colonies successful practices. The results will show the correct approach of relation between the triple constraints considering the relation as multi agents system having specified communication channels based on agents locations. Information will be transferred between agents, and action would be taken based on constraint agents locations in the project structure allowing immediate changes abilities in order to overcome issues of over budget, behind schedule, and additional scope impact. This is complex adaptive system having self organizes technique, and cybernetic control. Resulted model can be used for improving existing project management methodologies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Supervisory Control and Data Acquisition (SCADA) systems are one of the key foundations of smart grids. The Distributed Network Protocol version 3 (DNP3) is a standard SCADA protocol designed to facilitate communications in substations and smart grid nodes. The protocol is embedded with a security mechanism called Secure Authentication (DNP3-SA). This mechanism ensures that end-to-end communication security is provided in substations. This paper presents a formal model for the behavioural analysis of DNP3-SA using Coloured Petri Nets (CPN). Our DNP3-SA CPN model is capable of testing and verifying various attack scenarios: modification, replay and spoofing, combined complex attack and mitigation strategies. Using the model has revealed a previously unidentified flaw in the DNP3-SA protocol that can be exploited by an attacker that has access to the network interconnecting DNP3 devices. An attacker can launch a successful attack on an outstation without possessing the pre-shared keys by replaying a previously authenticated command with arbitrary parameters. We propose an update to the DNP3-SA protocol that removes the flaw and prevents such attacks. The update is validated and verified using our CPN model proving the effectiveness of the model and importance of the formal protocol analysis.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the mining optimisation literature, most researchers focused on two strategic-level and tactical-level open-pit mine optimisation problems, which are respectively termed ultimate pit limit (UPIT) or constrained pit limit (CPIT). However, many researchers indicate that the substantial numbers of variables and constraints in real-world instances (e.g., with 50-1000 thousand blocks) make the CPIT’s mixed integer programming (MIP) model intractable for use. Thus, it becomes a considerable challenge to solve the large scale CPIT instances without relying on exact MIP optimiser as well as the complicated MIP relaxation/decomposition methods. To take this challenge, two new graph-based algorithms based on network flow graph and conjunctive graph theory are developed by taking advantage of problem properties. The performance of our proposed algorithms is validated by testing recent large scale benchmark UPIT and CPIT instances’ datasets of MineLib in 2013. In comparison to best known results from MineLib, it is shown that the proposed algorithms outperform other CPIT solution approaches existing in the literature. The proposed graph-based algorithms leads to a more competent mine scheduling optimisation expert system because the third-party MIP optimiser is no longer indispensable and random neighbourhood search is not necessary.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Even though crashes between trains and road users are rare events at railway level crossings, they are one of the major safety concerns for the Australian railway industry. Nearmiss events at level crossings occur more frequently, and can provide more information about factors leading to level crossing incidents. In this paper we introduce a video analytic approach for automatically detecting and localizing vehicles from cameras mounted on trains for detecting near-miss events. To detect and localize vehicles at level crossings we extract patches from an image and classify each patch for detecting vehicles. We developed a region proposals algorithm for generating patches, and we use a Convolutional Neural Network (CNN) for classifying each patch. To localize vehicles in images we combine the patches that are classified as vehicles according to their CNN scores and positions. We compared our system with the Deformable Part Models (DPM) and Regions with CNN features (R-CNN) object detectors. Experimental results on a railway dataset show that the recall rate of our proposed system is 29% higher than what can be achieved with DPM or R-CNN detectors.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper the issue of finding uncertainty intervals for queries in a Bayesian Network is reconsidered. The investigation focuses on Bayesian Nets with discrete nodes and finite populations. An earlier asymptotic approach is compared with a simulation-based approach, together with further alternatives, one based on a single sample of the Bayesian Net of a particular finite population size, and another which uses expected population sizes together with exact probabilities. We conclude that a query of a Bayesian Net should be expressed as a probability embedded in an uncertainty interval. Based on an investigation of two Bayesian Net structures, the preferred method is the simulation method. However, both the single sample method and the expected sample size methods may be useful and are simpler to compute. Any method at all is more useful than none, when assessing a Bayesian Net under development, or when drawing conclusions from an ‘expert’ system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper considers the dynamic modelling and motion control of a Surface Effect Ship (SES) for safer transfer of personnel and equipment from vessel to-and-from an offshore wind-turbine. Such a vessel is a key enabling factor for operation and maintenance (O&M) of offshore wind-energy infrastructure. The control system designed is referred to as Boarding Control System (BCS). We investigate the performance of this system for a specific wind-farm service vessel–The Wave Craft. A two-modality vessel model is presented to account for the vessel free motion and motion whilst in contact with a wind-turbine. On a SES, the pressurized air cushion carries the majority of the vessel mass. The control problem considered relates to the actuation of the pressure such that wave-induced vessel motions are minimized. This leads to a safer personnel transfer in developed sea-states than what is possible today. Results for the BCS is presented through simulation and model-scale craft testing.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We explore the use of Gittins indices to search for near optimality in sequential clinical trials. Some adaptive allocation rules are proposed to achieve the following two objectives as far as possible: (i) to reduce the expected successes lost, (ii) to minimize the error probability at the end. Simulation results indicate the merits of the rules based on Gittins indices for small trial sizes. The rules are generalized to the case when neither of the response densities is known. Asymptotic optimality is derived for the constrained rules. A simple allocation rule is recommended for one-stage models. The simulation results indicate that it works better than both equal allocation and Bather's randomized allocation. We conclude with a discussion of possible further developments.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper, the validity of'single fault assumption in deriving diagnostic test sets is examined with respect to crosspoint faults in programmable logic arrays (PLA's). The control input procedure developed here can be used to convert PLA's having undetectable crosspoint faults to crosspoint-irredundant PLA's for testing purposes. All crosspoints will be testable in crosspoint-irredundant PLA's. The control inputs are used as extra variables during testing. They are maintained at logic I during normal operation. A useful heuristic for obtaining a near-minimal number of control inputs is suggested. Expressions for calculating bounds on the number of control inputs have also been obtained.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Onboard spacecraft computing system is a case of a functionally distributed system that requires continuous interaction among the nodes to control the operations at different nodes. A simple and reliable protocol is desired for such an application. This paper discusses a formal approach to specify the computing system with respect to some important issues encountered in the design and development of a protocol for the onboard distributed system. The issues considered in this paper are concurrency, exclusiveness and sequencing relationships among the various processes at different nodes. A 6-tuple model is developed for the precise specification of the system. The model also enables us to check the consistency of specification and deadlock caused due to improper specification. An example is given to illustrate the use of the proposed methodology for a typical spacecraft configuration. Although the theory is motivated by a specific application the same may be applied to other distributed computing system such as those encountered in process control industries, power plant control and other similar environments.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Electromechanical wave propagation characterizes the first-swing dynamic response in a spatially delayed manner. This paper investigates the characteristics of this phenomenon in two-dimensional and one-dimensional power systems. In 2-D systems, the wave front expands as a ripple in a pond. In 1-D systems, the wave front is more concentrated, retains most of its magnitude, and travels like a pulse on a string. This large wave front is more impactful upon any weak link and easily causes transient instability in 1-D systems. The initial disturbance injects both high and low frequency components, but the lumped nature of realistic systems only permits the lower frequency components to propagate through. The kinetic energy split at a junction is equal to the generator inertia ratio in each branch in an idealized continuum system. This prediction is approximately valid in a realistic power system. These insights can enhance understanding and control of the traveling waves.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Department of Forest Resource Management in the University of Helsinki has in years 2004?2007 carried out so-called SIMO -project to develop a new generation planning system for forest management. Project parties are organisations doing most of Finnish forest planning in government, industry and private owned forests. Aim of this study was to find out the needs and requirements for new forest planning system and to clarify how parties see targets and processes in today's forest planning. Representatives responsible for forest planning in each organisation were interviewed one by one. According to study the stand-based system for managing and treating forests continues in the future. Because of variable data acquisition methods with different accuracy and sources, and development of single tree interpretation, more and more forest data is collected without field work. The benefits of using more specific forest data also calls for use of information units smaller than tree stand. In Finland the traditional way to arrange forest planning computation is divided in two elements. After updating the forest data to present situation every stand unit's growth is simulated with different alternative treatment schedule. After simulation, optimisation selects for every stand one treatment schedule so that the management program satisfies the owner's goals in the best possible way. This arrangement will be maintained in the future system. The parties' requirements to add multi-criteria problem solving, group decision support methods as well as heuristic and spatial optimisation into system make the programming work more challenging. Generally the new system is expected to be adjustable and transparent. Strict documentation and free source code helps to bring these expectations into effect. Variable growing models and treatment schedules with different source information, accuracy, methods and the speed of processing are supposed to work easily in system. Also possibilities to calibrate models regionally and to set local parameters changing in time are required. In future the forest planning system will be integrated in comprehensive data management systems together with geographic, economic and work supervision information. This requires a modular method of implementing the system and the use of a simple data transmission interface between modules and together with other systems. No major differences in parties' view of the systems requirements were noticed in this study. Rather the interviews completed the full picture from slightly different angles. In organisation the forest management is considered quite inflexible and it only draws the strategic lines. It does not yet have a role in operative activity, although the need and benefits of team level forest planning are admitted. Demands and opportunities of variable forest data, new planning goals and development of information technology are known. Party organisations want to keep on track with development. One example is the engagement in extensive SIMO-project which connects the whole field of forest planning in Finland.