936 resultados para construction techniques
Resumo:
A pressing cost issue facing construction is the procurement of off-site pre-manufactured assemblies. In order to encourage Australian adoption of off-site manufacture (OSM), a new approach to underlying processes is required. The advent of object oriented digital models for construction design assumes intelligent use of data. However, the construction production system relies on traditional methods and data sources and is expected to benefit from the application of well-established business process management techniques. The integration of the old and new data sources allows for the development of business process models which, by capturing typical construction processes involving OSM, provides insights into such processes. This integrative approach is the foundation of research into the use of OSM to increase construction productivity in Australia. The purpose of this study is to develop business process models capturing the procurement, resources and information flow of construction projects. For each stage of the construction value chain, a number of sub-processes are identified. Business Process Modelling Notation (BPMN), a mainstream business process modelling standard, is used to create base-line generic construction process models. These models identify OSM decision-making points that could provide cost reductions in procurement workflow and management systems. This paper reports on phase one of an on-going research aiming to develop a proto-type workflow application that can provide semi-automated support to construction processes involving OSM and assist in decision-making in the adoption of OSM thus contributing to a sustainable built environment.
Resumo:
Many construction industry decision-makers believe there is a lack of off-site manufacture (OSM) adoption for non-residential construction in Australia. Identification of construction business process was considered imperative in order to assist decision-makers to increase OSM utilisation. The premise that domain knowledge can be re-used to provide an intervention point in the construction process led a team of researchers to construct simple base-line process models for the complete construction process, segmented into six phases. Sixteen domain knowledge industry experts were asked to review the construction phase base-line models to answer the question “Where in the process illustrated by this base-line model phase is an OSM task?”. Through an iterative and generative process a number of off-site manufacture intervention points were identified and integrated into the process models. The re-use of industry expert domain knowledge provided suggestions for new ways to do basic tasks thus facilitating changes to current practice. It is expected that implementation of the new processes will lead to systemic industry change and thus a growth in productivity due to increased adoption of OSM.
Resumo:
The focus of knowledge management (KM) in the construction industry is moving towards capability building for value creation. The study reported by this paper is motivated by recent assertions about the genesis and evolution of knowledge management capability (KMC) in the strategic management field. It attempts to shed light on the governance of learning mechanisms that develop KMC within the context of construction firms. A questionnaire survey was administered to a sample of construction contractors operating in the very dynamic Hong Kong market to elicit opinions on the learning mechanisms and business outcomes of targeted firms. On the basis of a total of 149 usable responses, structural equation modeling (SEM) analysis identified relationships among knowledge-governance mechanisms, knowledge processes, and business performance, thereby supporting the existence of strategic learning loops. The study findings provide evidence from the construction context for capability assertions that knowledge-governance mechanisms and processes form learning mechanisms that carry out strategic learning to create value, effect performance outcomes, and ultimately drive the evolution of KMC. The findings imply that it is feasible for managing construction firms to govern learning mechanisms through managing the capability-based holistic KM system, thereby reconfiguring KMC to match needs in the dynamic market environment over time.
Resumo:
A firm, as a dynamic, evolving, and quasi-autonomous system of knowledge production and application, develops knowledge management capability (KMC) through strategic learning in order to sustain competitive advantages in a dynamic environment. Knowledge governance mechanisms and knowledge processes connect and interact with each other forming learning mechanisms, which carry out double loop learning that drives genesis and evolution of KMC to modify operating routines that effect desired performance. This paper reports a study that was carried out within a context of construction contractors, a type of project-based firms, operating within the dynamic Hong Kong construction market. A multiple-case design was used to incorporate evidence from the literature and interviews, with the help of system dynamics modeling, to visualize the evolution of KMC. The study demonstrates the feasibility to visualize how a firm's KMC matches its operating environment over time. The findings imply that knowledge management (KM) applications can be better planned and controlled through evaluation of KM performance over time from a capability perspective.
Resumo:
This paper reports the findings of an in-depth literature review, which was designed as the first phase of a study that ultimately aims to rank the importance of key governance mechanisms on collaborative construction projects, in terms of impact on value-for-money. The absence of such information in the global knowledge base has prompted the current study. Seminal research completed recently concluded that deductive evidence with regard to the performance outcomes of collaborative procurement mechanisms is currently limited (Eriksson and Westerberg 2011). The authors aim to address this gap in current understanding. The literature review identifies key features of both formal and informal mechanisms which have been applied within collaborative contracting contexts. The literature review lays a solid foundation for designing a deductive research strategy to be implemented in the second phase of the study, which will employ a large-scale quantitative survey to shed light on the governance structures of collaborative contracts, and the ways in which they impact on realisation of VfM during project delivery in the Australian infrastructure industry. The current paper aims to identify the main categories of formal and informal governance mechanisms currently being employed globally. This will provide structure for the development of the survey in the second phase of the study.
Resumo:
Purpose: Tacit knowledge is perceived as the most strategically important resource of the construction organisation, and the only renewable and sustainable base for its activities and competitiveness. Knowledge management (KM) activities that deal with tacit knowledge are essential in helping an organisation to achieve its long-term organisational objectives. The purpose of this paper is to provide empirical evidence for the stronger strategic role of tacit KM in comparison to explicit KM. Design/methodology/approach: A questionnaire survey was administered in 2005 to a sample of construction contractors operating in Hong Kong to elicit opinions on the internal business environment, intensity of KM activities as executed by targeted organisations, and contribution of these activities to business performance (BP). A total of 149 usable responses were received from 99 organisations representing about 38 per cent of the sampling frame. The statistical analyses helped to map the reported KM activities into two groups that, respectively, deal with tacit and explicit knowledge. The sensitivity to variations of organisational policies and strength of association with BP in relation to the two groups of KM activities were also compared empirically. A total of 15 interviews with the managerial and professional staff of leading contractors was undertaken to provide insightful narratives of KM implementations. Findings: The effective implementation of organisational policies, such as encouraging innovations and strengthening strategic guidance for KM, would facilitate human interactions of tacit KM. Higher intensity of activities in managing tacit knowledge would ultimately help the organisations to achieve economic gain in the long run. Originality/value: The stronger strategic role of tacit KM is empirically investigated and established within the context of construction organisations.
Resumo:
CTAC2012 was the 16th biennial Computational Techniques and Applications Conference, and took place at Queensland University of Technology from 23 - 26 September, 2012. The ANZIAM Special Interest Group in Computational Techniques and Applications is responsible for the CTAC meetings, the first of which was held in 1981.
Resumo:
A building information model (BIM) provides a rich representation of a building's design. However, there are many challenges in getting construction-specific information from a BIM, limiting the usability of BIM for construction and other downstream processes. This paper describes a novel approach that utilizes ontology-based feature modeling, automatic feature extraction based on ifcXML, and query processing to extract information relevant to construction practitioners from a given BIM. The feature ontology generically represents construction-specific information that is useful for a broad range of construction management functions. The software prototype uses the ontology to transform the designer-focused BIM into a construction-specific feature-based model (FBM). The formal query methods operate on the FBM to further help construction users to quickly extract the necessary information from a BIM. Our tests demonstrate that this approach provides a richer representation of construction-specific information compared to existing BIM tools.
Resumo:
The design and construction community has shown increasing interest in adopting building information models (BIMs). The richness of information provided by BIMs has the potential to streamline the design and construction processes by enabling enhanced communication, coordination, automation and analysis. However, there are many challenges in extracting construction-specific information out of BIMs. In most cases, construction practitioners have to manually identify the required information, which is inefficient and prone to error, particularly for complex, large-scale projects. This paper describes the process and methods we have formalized to partially automate the extraction and querying of construction-specific information from a BIM. We describe methods for analyzing a BIM to query for spatial information that is relevant for construction practitioners, and that is typically represented implicitly in a BIM. Our approach integrates ifcXML data and other spatial data to develop a richer model for construction users. We employ custom 2D topological XQuery predicates to answer a variety of spatial queries. The validation results demonstrate that this approach provides a richer representation of construction-specific information compared to existing BIM tools.
Resumo:
There is a worldwide demand for an increasingly sustainable built environment. This has resulted in the need for a more accurate evaluation of the level of sustainability of construction projects. To do this it involves the development of better measurement and benchmarking methods. One approach is to use a theoretical model to assess construction projects in terms of their sustainable development value (SDV) and sustainable development ability (SDA) for implementation in the project life cycle, where SDA measures the contribution of a project to development sustainability and as a major criterion for assessing its feasibility. This paper develops an improved SDA prototype model that incorporates the effects of dynamical factors on project sustainability. This involves the introduction of two major factors concerning technological advancement and changes in people's perceptions. A case study is used to demonstrate the procedures involved in simulation and modeling, one outcome of which is to demonstrate the greater influence of technological advancement on project sustainability than changes in perception.
Resumo:
Building information modeling (BIM) is an emerging technology and process that provides rich and intelligent design information models of a facility, enabling enhanced communication, coordination, analysis, and quality control throughout all phases of a building project. Although there are many documented benefits of BIM for construction, identifying essential construction-specific information out of a BIM in an efficient and meaningful way is still a challenging task. This paper presents a framework that combines feature-based modeling and query processing to leverage BIM for construction. The feature-based modeling representation implemented enriches a BIM by representing construction-specific design features relevant to different construction management (CM) functions. The query processing implemented allows for increased flexibility to specify queries and rapidly generate the desired view from a given BIM according to the varied requirements of a specific practitioner or domain. Central to the framework is the formalization of construction domain knowledge in the form of a feature ontology and query specifications. The implementation of our framework enables the automatic extraction and querying of a wide-range of design conditions that are relevant to construction practitioners. The validation studies conducted demonstrate that our approach is significantly more effective than existing solutions. The research described in this paper has the potential to improve the efficiency and effectiveness of decision-making processes in different CM functions.
Resumo:
Purpose: Recent knowledge management (KM) literature suggests that KM activities are influenced by the elements of the internal business environment (BE) of organisations. This paper attempts to provide some unique insights into the contextual input of the KM process through empirically identifying the major factors (i.e. “forces”) within the internal BE of construction organisations operating in Hong Kong, and investigating their impact on the intensity of KM activities. Design/methodology/approach: A questionnaire survey was administered to a sample of construction contractors operating in Hong Kong to elicit opinions on the internal BE and intensity of KM activities as executed by targeted organisations. A total of 149 usable responses were received from 99 organisations representing about 38 percent of the research population. In parallel, to the survey, a total of 15 semi-structured interviews were undertaken to provide more insights into the phenomenon under investigation. Findings: Supported by the empirical and qualitative evidence, this study established that firstly, both organisational and technical environments have the capacity to either positively or negatively impact the intensity of KM activities, and both environments serve as stimuli in increasing each other's dynamism; secondly, certain types of KM activities are stronger “energy receivers” and easily to be “powered up” by manipulating factors representing these two environments. Then, through interactions between KM activities, the intensity of the whole strategic KM cycle will be increased thus helping to strengthen organisational competitive advantage.
Resumo:
An optical system which performs the multiplication of binary numbers is described and proof-of-principle experiments are performed. The simultaneous generation of all partial products, optical regrouping of bit products, and optical carry look-ahead addition are novel features of the proposed scheme which takes advantage of the parallel operations capability of optical computers. The proposed processor uses liquid crystal light valves (LCLVs). By space-sharing the LCLVs one such system could function as an array of multipliers. Together with the optical carry look-ahead adders described, this would constitute an optical matrix-vector multiplier.
Resumo:
Construction practitioners often experience unexpected results of their scheduling-related decisions. This is mainly due to lack of understanding of the dynamic nature of construction system. However, very little attention has been given to its significant importance and few empirical studies have been undertaken on this issue. This paper, therefore, analyzes the effect of aggressive scheduling, overtime, resource adding, and schedule slippage on construction performance, focusing on workers’ reactions to those scheduling decisions. Survey data from 102 construction practitioners in 38 construction sites are used for the analysis. The results indicate that efforts to increase work rate by working overtime, resource adding, and aggressive scheduling can be offset due to losses in productivity and quality. Based on the research findings, practical guidelines are then discussed to help site managers to effectively deal with the dynamics of scheduling and improve construction performance.