936 resultados para computer modelling


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Scoliosis is a spinal deformity, involving a side-to-side curvature of the spine in the coronal plane as well as a rotation of the spinal column in the transverse plane. The coronal curvature is measured using a Cobb angle. If the deformity is severe, treatment for scoliosis may require surgical intervention whereby a rod is attached to the spinal column to correct the abnormal curvature. In order to provide surgeons with an improved ability to predict the likely outcomes following surgery, techniques to create patient-specific finite element models (FEM) of scoliosis patients treated at the Mater Children’s Hospital (MCH) in Brisbane are being developed and validated. This paper presents a comparison of the simulated and clinical data for a scoliosis patient treated at MCH.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Introduction: Bone mineral density (BMD) is currently the preferred surrogate for bone strength in clinical practice. Finite element analysis (FEA) is a computer simulation technique that can predict the deformation of a structure when a load is applied, providing a measure of stiffness (Nmm−1). Finite element analysis of X-ray images (3D-FEXI) is a FEA technique whose analysis is derived froma single 2D radiographic image. Methods: 18 excised human femora had previously been quantitative computed tomography scanned, from which 2D BMD-equivalent radiographic images were derived, and mechanically tested to failure in a stance-loading configuration. A 3D proximal femur shape was generated from each 2D radiographic image and used to construct 3D-FEA models. Results: The coefficient of determination (R2%) to predict failure load was 54.5% for BMD and 80.4% for 3D-FEXI. Conclusions: This ex vivo study demonstrates that 3D-FEXI derived from a conventional 2D radiographic image has the potential to significantly increase the accuracy of failure load assessment of the proximal femur compared with that currently achieved with BMD. This approach may be readily extended to routine clinical BMD images derived by dual energy X-ray absorptiometry. Crown Copyright © 2009 Published by Elsevier Ltd on behalf of IPEM. All rights reserved

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The challenges of maintaining a building such as the Sydney Opera House are immense and are dependent upon a vast array of information. The value of information can be enhanced by its currency, accessibility and the ability to correlate data sets (integration of information sources). A building information model correlated to various information sources related to the facility is used as definition for a digital facility model. Such a digital facility model would give transparent and an integrated access to an array of datasets and obviously would support Facility Management processes. In order to construct such a digital facility model, two state-of-the-art Information and Communication technologies are considered: an internationally standardized building information model called the Industry Foundation Classes (IFC) and a variety of advanced communication and integration technologies often referred to as the Semantic Web such as the Resource Description Framework (RDF) and the Web Ontology Language (OWL). This paper reports on some technical aspects for developing a digital facility model focusing on Sydney Opera House. The proposed digital facility model enables IFC data to participate in an ontology driven, service-oriented software environment. A proof-of-concept prototype has been developed demonstrating the usability of IFC information to collaborate with Sydney Opera House’s specific data sources using semantic web ontologies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this computational study we investigate the role of turbulence in ideal axisymmetric vortex breakdown. A pipe geometry with a slight constriction near the inlet is used to stabilise the location of the breakdown within the computed domain. Eddy-viscosity and differential Reynolds stress models are used to model the turbulence. Changes in upstream turbulence levels, flow Reynolds and Swirl numbers are considered. The different computed solutions are monitored for indications of different breakdown flow configurations. Trends in vortex breakdown due to turbulent flow conditions are identified and discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Despite the size and growth of the computer and video gaming industry – as well as the increasing use of the medium for the placement of advertising and product placement – researchers have neglected this area. By drawing on existing literature and research in similar and related areas of film product placement, sponsorship and interactivity, the authors present a conceptual overview and identify areas for research.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This appendix describes the Order Fulfillment process followed by a fictitious company named Genko Oil. The process is freely inspired by the VICS (Voluntary Inter-industry Commerce Solutions) reference model1 and provides a demonstration of YAWL’s capabilities in modelling complex control-flow, data and resourcing requirements.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This chapter describes how the YAWL meta-model was extended to support the definition of variation points. These variation points can be used to describe different variants of a YAWL process model in a unified, configurable model. The model can then be configured to suit the needs of specific settings, e.g. for a new organization of project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Computers not only increase the speed and efficiency of our mental efforts, but in the process they also alter the problem-solving tasks we are faced with and, in so doing, they alter the cognitive processes we use to solve problems. Computers are fundamentally changing our forms of thinking (Colc & Griffin, 1980). Therefore, the computer should be seen as not only having the potential to amplify human mental capabilities, but also of providing a catalyst for intellectual development.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper reviews the main development of approaches to modelling urban public transit users’ route choice behaviour from 1960s to the present. The approaches reviewed include the early heuristic studies on finding the least cost transit route and all-or-nothing transit assignment, the bus common line problem and corresponding network representation methods, the disaggregate discrete choice models which are based on random utility maximization assumptions, the deterministic use equilibrium and stochastic user equilibrium transit assignment models, and the recent dynamic transit assignment models using either frequency or schedule based network formulation. In addition to reviewing past outcomes, this paper also gives an outlook into the possible future directions of modelling transit users’ route choice behaviour. Based on the comparison with the development of models for motorists’ route choice and traffic assignment problems in an urban road area, this paper points out that it is rewarding for transit route choice research to draw inspiration from the intellectual outcomes out of the road area. Particularly, in light of the recent advancement of modelling motorists’ complex road route choice behaviour, this paper advocates that the modelling practice of transit users’ route choice should further explore the complexities of the problem.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The fracture healing process is modulated by the mechanical environment created by imposed loads and motion between the bone fragments. Contact between the fragments obviously results in a significantly different stress and strain environment to a uniform fracture gap containing only soft tissue (e.g. haematoma). The assumption of the latter in existing computational models of the healing process will hence exaggerate the inter-fragmentary strain in many clinically-relevant cases. To address this issue, we introduce the concept of a contact zone that represents a variable degree of contact between cortices by the relative proportions of bone and soft tissue present. This is introduced as an initial condition in a two-dimensional iterative finite element model of a healing tibial fracture, in which material properties are defined by the volume fractions of each tissue present. The algorithm governing the formation of cartilage and bone in the fracture callus uses fuzzy logic rules based on strain energy density resulting from axial compression. The model predicts that increasing the degree of initial bone contact reduces the amount of callus formed (periosteal callus thickness 3.1mm without contact, down to 0.5mm with 10% bone in contact zone). This is consistent with the greater effective stiffness in the contact zone and hence, a smaller inter-fragmentary strain. These results demonstrate that the contact zone strategy reasonably simulates the differences in the healing sequence resulting from the closeness of reduction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Information uncertainty which is inherent in many real world applications brings more complexity to the visualisation problem. Despite the increasing number of research papers found in the literature, much more work is needed. The aims of this chapter are threefold: (1) to provide a comprehensive analysis of the requirements of visualisation of information uncertainty and their dimensions of complexity; (2) to review and assess current progress; and (3) to discuss remaining research challenges. We focus on four areas: information uncertainty modelling, visualisation techniques, management of information uncertainty modelling, propagation and visualisation, and the uptake of uncertainty visualisation in application domains.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.