958 resultados para RADIOISOTOPE GENERATORS
Resumo:
We describe a modification to a previously published pseudorandom number generator improving security while maintaining high performance. The proposed generator is based on the powers of a word-packed block upper triangular matrix and it is designed to be fast and easy to implement in software since it mainly involves bitwise operations between machine registers and, in our tests, it presents excellent security and statistical characteristics. The modifications include a new, key-derived s-box based nonlinear output filter and improved seeding and extraction mechanisms. This output filter can also be applied to other generators.
Resumo:
This paper introduces a new optimization model for the simultaneous synthesis of heat and work exchange networks. The work integration is performed in the work exchange network (WEN), while the heat integration is carried out in the heat exchanger network (HEN). In the WEN synthesis, streams at high-pressure (HP) and low-pressure (LP) are subjected to pressure manipulation stages, via turbines and compressors running on common shafts and stand-alone equipment. The model allows the use of several units of single-shaft-turbine-compressor (SSTC), as well as helper motors and generators to respond to any shortage and/or excess of energy, respectively, in the SSTC axes. The heat integration of the streams occurs in the HEN between each WEN stage. Thus, as the inlet and outlet streams temperatures in the HEN are dependent of the WEN design, they must be considered as optimization variables. The proposed multi-stage superstructure is formulated in mixed-integer nonlinear programming (MINLP), in order to minimize the total annualized cost composed by capital and operational expenses. A case study is conducted to verify the accuracy of the proposed approach. The results indicate that the heat integration between the WEN stages is essential to enhance the work integration, and to reduce the total cost of process due the need of a smaller amount of hot and cold utilities.
Resumo:
The most straightforward European single energy market design would entail a European system operator regulated by a single European regulator. This would ensure the predictable development of rules for the entire EU, significantly reducing regulatory uncertainty for electricity sector investments. But such a first-best market design is unlikely to be politically realistic in the European context for three reasons. First, the necessary changes compared to the current situation are substantial and would produce significant redistributive effects. Second, a European solution would deprive member states of the ability to manage their energy systems nationally. And third, a single European solution might fall short of being well-tailored to consumers’ preferences, which differ substantially across the EU. To nevertheless reap significant benefits from an integrated European electricity market, we propose the following blueprint: First, we suggest adding a European system-management layer to complement national operation centres and help them to better exchange information about the status of the system, expected changes and planned modifications. The ultimate aim should be to transfer the day-to-day responsibility for the safe and economic operation of the system to the European control centre. To further increase efficiency, electricity prices should be allowed to differ between all network points between and within countries. This would enable throughput of electricity through national and international lines to be safely increased without any major investments in infrastructure. Second, to ensure the consistency of national network plans and to ensure that they contribute to providing the infrastructure for a functioning single market, the role of the European ten year network development plan (TYNDP) needs to be upgraded by obliging national regulators to only approve projects planned at European level unless they can prove that deviations are beneficial. This boosted role of the TYNDP would need to be underpinned by resolving the issues of conflicting interests and information asymmetry. Therefore, the network planning process should be opened to all affected stakeholders (generators, network owners and operators, consumers, residents and others) and enable the European Agency for the Cooperation of Energy Regulators (ACER) to act as a welfare-maximising referee. An ultimate political decision by the European Parliament on the entire plan will open a negotiation process around selecting alternatives and agreeing compensation. This ensures that all stakeholders have an interest in guaranteeing a certain degree of balance of interest in the earlier stages. In fact, transparent planning, early stakeholder involvement and democratic legitimisation are well suited for minimising as much as possible local opposition to new lines. Third, sharing the cost of network investments in Europe is a critical issue. One reason is that so far even the most sophisticated models have been unable to identify the individual long-term net benefit in an uncertain environment. A workable compromise to finance new network investments would consist of three components: (i) all easily attributable cost should be levied on the responsible party; (ii) all network users that sit at nodes that are expected to receive more imports through a line extension should be obliged to pay a share of the line extension cost through their network charges; (iii) the rest of the cost is socialised to all consumers. Such a cost-distribution scheme will involve some intra-European redistribution from the well-developed countries (infrastructure-wise) to those that are catching up. However, such a scheme would perform this redistribution in a much more efficient way than the Connecting Europe Facility’s ad-hoc disbursements to politically chosen projects, because it would provide the infrastructure that is really needed.
Resumo:
On 11 October 2013, the CEOs of 10 large European energy utilities issued a warning that the European energy infrastructure is “in jeopardy” and called for an end to support for renewables on grounds that wind and solar were mature technologies that no longer required such support. Given the unlikelihood, however, that EU decision-makers would renege on their decarbonisation or renewable energy targets, Fabio Genoese asks in this commentary whether it would not be a better strategy for conventional generators to explore new business models built around a ‘reliability pricing system’, in which nearly 100% reliability would be guaranteed for base load but not for peak demand.
Resumo:
Todos os anos milhares de hectares são consumidos pelas chamas durante a época de incêndios. As medidas preventivas têm-se revelado insuficientes e as capacidades dos meios de combate estão condicionadas por terrenos inacessíveis, condições de visibilidade reduzida e condições meteorológicas adversas. Com a introdução do projéctil projectado nesta dissertação pretende-se preencher de algum modo o vazio deixado por essas condicionantes. Este projecto dá continuidade ao projecto FIREND® que é a última evolução de um conceito idealizado em 2005 e que se tem vindo a desenvolver numa parceria entre a Academia Militar e o Instituto Superior técnico. O conhecimento assimilado pela revisão bibliográfica de algumas patentes, dos projectos FIREND® anteriores e sobre o funcionamento de projécteis de artilharia convencionais, foi complementada com os conhecimentos de balística e de projecto mecânico, resultando no desenvolvimento sólido de um projéctil de 155mm de detonação electrónica. O projéctil funciona com base num micro gerador de gás que aumenta a pressão interior e desta forma ejecta a carga contida no compartimento de carga. Foram utilizadas as capacidades de desenho tridimensional do software SolidWorks® e estimou-se, através deste, o peso, volume, momentos de inércia dos componentes e a capacidade de carga do projéctil. Estes dados são fundamentais neste projecto para garantir a sua compatibilidade com os obuses e tábuas de tiro utilizadas pela Artilharia do Exército Português. Como resultado, projectou-se um projéctil de 155mm com peso equivalente ao de uma granada convencional e com cotas máximas que lhe conferem total compatibilidade com os Obuses de Artilharia existentes. O projéctil consegue conter, no seu compartimento de carga, aproximadamente 7,5 dm3 de volume, o que lhe confere a capacidade para actuar numa área de aproximadamente 75m2.
Resumo:
We report a measurement of the νµ-nucleus inclusive charged current cross section (=σ cc) on ironusing data from exposed to the J-PARC neutrino beam. The detector consists of 14 modules in total, which are spread over a range of off-axis angles from 0◦ to 1.1◦. The variation in the neutrino energy spectrum as a function of the off-axis angle, combined with event topology information, is used to calculate this cross section as a function of neutrino energy. The cross section is measured to be σcc(1.1 GeV) = 1.10±0.15 (10^−38cm^2/nucleon), σcc(2.0 GeV) = 2.07±0.27 (10^−38cm^2/nucleon), and σcc(3.3 GeV) = 2.29 ± 0.45 (10^−38cm^2/nucleon), at energies of 1.1, 2.0, and 3.3 GeV, respectively. These results are consistent with the cross section calculated by the neutrino interaction generators currently used by T2K. More importantly, the method described here opens up a new way to determine the energy dependence of neutrino-nucleus cross sections.
Resumo:
A detector based on doped silica and optical fibers was developed to monitor the profile of particle accelerator beams of intensity ranging from 1 pA to tens of µA. Scintillation light produced in a fiber moving across the beam is measured, giving information on its position, shape and intensity. The detector was tested with a continuous proton beam at the 18 MeV Bern medical cyclotron used for radioisotope production and multi-disciplinary research. For currents from 1 pA to 20 µA, Ce3+ and Sb3+ doped silica fibers were used as sensors. Read out systems based on photodiodes, photomultipliers and solid state photomultipliers were employed. Profiles down to the pA range were measured with this method for the first time. For currents ranging from 1 pA to 3 µA, the integral of the profile was found to be linear with respect to the beam current, which can be measured by this detector with an accuracy of ∼1%. The profile was determined with a spatial resolution of 0.25 mm. For currents ranging from 5 µA to 20 µA, thermal effects affect light yield and transmission, causing distortions of the profile and limitations in monitoring capabilities. For currents higher than ∼1 µA, non doped optical fibers for both producing and transporting scintillation light were also successfully employed.
Resumo:
The cyclotron laboratory for radioisotope production and multi-disciplinary research at the Bern University Hospital (Inselspital) is based on an 18-MeV proton accelerator, equipped with a specifically conceived 6-m long external beam line, ending in a separate bunker. This facility allows performing daily positron emission tomography (PET) radioisotope production and research activities running in parallel. Some of the latest developments on accelerator and detector physics are reported. They encompass novel detectors for beam monitoring and studies of low current beams.