907 resultados para Proceedings of the Institution of Civil Engineers. Waste and Resource Management
Resumo:
The proceedings of the conference
Resumo:
The proceedings of the conference
Resumo:
The proceedings of the conference
Resumo:
The author contends that many of the conventions of Italian film studies derive from the conflicts and the critical vocabulary that shaped the Italian reception of neorealism in the first decade after the Second World War. Those conflicts, and that critical vocabulary, which lie at the foundation of what has been called the ‘institution of neorealism,’ established an irreconcilable binary: Cronaca and Narrativa. For the neorealists and their critics, Cronaca stood for the effort to record data faithfully, while Narrativa represented the effort to employ the shaping force of human invention in the representation of information. This essay’s first section analyzes the earliest reviews of Rossellini’s Roma città aperta alongside the contemporaneous literary debates over Cronaca and Narrativa. The second section reconsiders the reception of Pratolini’s Metello and Visconti’s Senso, which similarly centered upon the conflict between Cronaca and Narrativa. The third section proposes that the concepts which have often been employed to unify neorealism are destabilized by the Cronaca/Narrativa binary. In search of a solution to neorealism’s conceptual instability, this essay proposes more critical and purposeful appropriations of the movement’s problematic genealogy.
Resumo:
In today's global economic conditions, improving the productivity of the construction industry is becoming more pressing than ever. Several factors impact the efficiency of construction operatives, but motivation is among the most important. Since low productivity is one of the significant challenges facing the construction industry in the State of Kuwait, the objective of this case study is to identify, explore, and rank the relative importance of the factors perceived to impact the motivational level of master craftsmen involved in primary construction trades. To achieve this objective, a structured questionnaire survey comprising 23 factors, which were shortlisted based on relevant previous research on motivation, the input of local industry experts, and numerous interviews with skilled operatives, was distributed to a large number of master craftsmen. Using the “Relative Importance Index” technique, the following prominent factors are identified: (1) payment delay; (2) rework; (3) lack of a financial incentive scheme; (4) the extent of change orders during execution; (5) incompetent supervisors; (6) delays in responding to Requests For Information (RFI); (7) overcrowding and operatives interface; (8) unrealistic scheduling and performance expectation; (9) shortage of materials on site; and (10) drawings quality level. The findings can be used to provide industry practitioners with guidance for focusing, acting upon, and controlling the critical factors influencing the performance of master craftsmen, hence, assist in achieving an efficient utilization of the workforce, and a reasonable level of competitiveness and cost effective operation.
Resumo:
This conference was an unusual and interesting event. Celebrating 25 years of Construction Management and Economics provides us with an opportunity to reflect on the research that has been reported over the years, to consider where we are now, and to think about the future of academic research in this area. Hence the sub-title of this conference: “past, present and future”. Looking through these papers, some things are clear. First, the range of topics considered interesting has expanded hugely since the journal was first published. Second, the research methods are also more diverse. Third, the involvement of wider groups of stakeholder is evident. There is a danger that this might lead to dilution of the field. But my instinct has always been to argue against the notion that Construction Management and Economics represents a discipline, as such. Granted, there are plenty of university departments around the world that would justify the idea of a discipline. But the vast majority of academic departments who contribute to the life of this journal carry different names to this. Indeed, the range and breadth of methodological approaches to the research reported in Construction Management and Economics indicates that there are several different academic disciplines being brought to bear on the construction sector. Some papers are based on economics, some on psychology and others on operational research, sociology, law, statistics, information technology, and so on. This is why I maintain that construction management is not an academic discipline, but a field of study to which a range of academic disciplines are applied. This may be why it is so interesting to be involved in this journal. The problems to which the papers are applied develop and grow. But the broad topics of the earliest papers in the journal are still relevant today. What has changed a lot is our interpretation of the problems that confront the construction sector all over the world, and the methodological approaches to resolving them. There is a constant difficulty in dealing with topics as inherently practical as these. While the demands of the academic world are driven by the need for the rigorous application of sound methods, the demands of the practical world are quite different. It can be difficult to meet the needs of both sets of stakeholders at the same time. However, increasing numbers of postgraduate courses in our area result in larger numbers of practitioners with a deeper appreciation of what research is all about, and how to interpret and apply the lessons from research. It also seems that there are contributions coming not just from construction-related university departments, but also from departments with identifiable methodological traditions of their own. I like to think that our authors can publish in journals beyond the construction-related areas, to disseminate their theoretical insights into other disciplines, and to contribute to the strength of this journal by citing our articles in more mono-disciplinary journals. This would contribute to the future of the journal in a very strong and developmental way. The greatest danger we face is in excessive self-citation, i.e. referring only to sources within the CM&E literature or, worse, referring only to other articles in the same journal. The only way to ensure a strong and influential position for journals and university departments like ours is to be sure that our work is informing other academic disciplines. This is what I would see as the future, our logical next step. If, as a community of researchers, we are not producing papers that challenge and inform the fundamentals of research methods and analytical processes, then no matter how practically relevant our output is to the industry, it will remain derivative and secondary, based on the methodological insights of others. The balancing act between methodological rigour and practical relevance is a difficult one, but not, of course, a balance that has to be struck in every single paper.
Resumo:
The proceedings of the conference
Resumo:
Construction professional services (CPSs), such as architecture, engineering, and consultancy, are not only high value-added profit centers in their own right but also have a knock-on effect on other businesses, such as construction and the export of materials and machinery. Arguably, competition in the international construction market has shifted to these knowledge-intensive CPS areas. Yet CPSs represent a research frontier that has received scant attention. This research aims to enrich the body of knowledge on CPSs by examining strengths, weaknesses, opportunities, and threats (SWOT) of Chinese CPSs (CCPSs) in the international context. It does so by triangulating theories with quantitative and qualitative data gleaned from yearbooks, annual reports, interviews, seminars, and interactions with managers in major CCPS companies. It is found that CCPSs present both strengths and weaknesses in talents, administration systems, and development strategies in dealing with the external opportunities and threats brought about by globalization and market evolution. Low price, which has helped the Chinese construction business to succeed in the international market, is also a major CCPS strength. An opportunity for CCPSs is the relatively strong delivery capability possessed by Chinese contractors; by partnering with them CCPSs can better establish themselves in the international arena. This is probably the first ever comprehensive study on the performance of CCPSs in the international marketplace. The research is conducted at an opportune time, particularly when the world is witnessing the burgeoning force of Chinese businesses in many areas including manufacturing, construction, and, potentially, professional services. It adds new insights to the knowledge body of CPSs and provides valuable references to other countries faced with the challenge of developing CPS business efficiently in the international market.
Resumo:
In contrast to their bustling construction counterparts, Chinese construction professional services (CPS) such as architecture, engineering, and consultancy, seem still to be stagnant in the international market. CPS are not only high value-added profit centers in their own right, but also have a knock-on effect on subsequent businesses such as construction, and the export of materials and machinery. Arguably, competition in the international construction market has shifted to knowledge-intensive CPS. Yet,CPS represent a research area that has been paid scant attention. This research aims to add to the body of knowledge of CPS by examining strengths, weaknesses, opportunities, and threats (SWOT) of Chinese CPS (CCPS) in the international context. It does so by triangulating theories with quantitative and qualitative data gleaned from yearbooks, annual reports, interviews, seminars, and interactions with managers in major CCPS companies. It is found that CCPS present both strengths and weaknesses in talents, administration systems, and development strategies in dealing with the external opportunities and threats brought about by globalization and market evolvement. Low price, which has helped the Chinese construction business to succeed in the international market, is also a CCPS major strength. An opportunity for CCPS is the relatively strong delivery capability possessed by Chinese contractors. By partnering with them CCPS can better edge into the international arena. This is probably the first ever comprehensive study in investigating the performance of CCPS in the international market. The research is also timely, particularly when the world is witnessing the burgeoning force of Chinese businesses in many areas including manufacturing, construction, and potentially, professional services.
Resumo:
The construction field is dynamic and dominated by complex, ill-defined problems for which myriad possible solutions exist. Teaching students to solve construction-related problems requires an understanding of the nature of these complex problems as well as the implementation of effective instructional strategies to address them. Traditional approaches to teaching construction planning and management have long been criticized for presenting students primarily with well-defined problems - an approach inconsistent with the challenges encountered in the industry. However, growing evidence suggests that employing innovative teaching approaches, such as interactive simulation games, offers more active, hands-on and problem-based learning opportunities for students to synthesize and test acquired knowledge more closely aligned with real-life construction scenarios. Simulation games have demonstrated educational value in increasing student problem solving skills and motivation through critical attributes such as interaction and feedback-supported active learning. Nevertheless, broad acceptance of simulation games in construction engineering education remains limited. While recognizing benefits, research focused on the role of simulation games in educational settings lacks a unified approach to developing, implementing and evaluating these games. To address this gap, this paper provides an overview of the challenges associated with evaluating the effectiveness of simulation games in construction education that still impede their wide adoption. An overview of the current status, as well as the results from recently implemented Virtual Construction Simulator (VCS) game at Penn State provide lessons learned, and are intended to guide future efforts in developing interactive simulation games to reach their full potential.
Resumo:
This paper discusses the development of the Virtual Construction Simulator (VCS) 3 - a simulation game-based educational tool for teaching construction schedule planning and management. The VCS3 simulation game engages students in learning the concepts of planning and managing construction schedules through goal driven exploration, employed strategies, and immediate feedback. Through the planning and simulation mode, students learn the difference between the as-planned and as-built schedules resulting from varying factors such as resource availability, weather and labor productivity. This paper focuses on the development of the VCS3 and its construction physics model. Challenges inherent in the process of identifying variables and their relationships to reliably represent and simulate the dynamic nature of planning and managing of construction projects are also addressed.
Resumo:
This paper reports part of a qualitative study into evolving practice in the implementation of the Dispute Adjudication Board (DAB) construction dispute resolution technique, a variant of the Dispute Review Board (DRB) concept used in the US and Canada. Data was collected through a focus group interview of 20 highly experienced dispute resolution practitioners from engineering and the law. The group was assembled from members of FIDIC-NET with direct experience of project DABs. The part reported here concerns practice and procedure for establishing DABs. The main findings are that: constitution of the DABs is often delayed because of either project owners' ignorance of the DAB process or deterrence by the cost of the DABs; such owners also tend to insist on appointing DAB members from local engineers and lawyers without sufficient understanding of the DAB process; rates of remuneration of DAB members vary widely; the training provision for DAB membership and advocacy skills is inadequate; the process of selecting candidates for DAB membership and negotiating the tripartite agreement between each member and the contractual parties needs to be navigated with great care to avoid raising ethical problems. The research contribution is threefold. First, it highlights the importance of realistic fees for DAB members within a standard framework in achieving timely establishment of a board that works well as a team. Second, it illustrates the use of qualitative focus group interview to study the impact of new contract terms from multiple stakeholder perspectives. Finally, it identifies areas where further research is needed.