861 resultados para Pedagogic projects
Resumo:
It is impossible to talk about planning as a scientific meta-discipline without mentioning one of the most influential worldwide figures in the second half of the twentieth century: John Friedmann. His contribution to the planning concept on his "Planning as Social Learning" theory is still very relevant. This paper shows the intellectual connection between Friedmann and Angel Ramos and Ignacio Trueba, two of the Spanish intellectual drivers in the engineering project knowledge area, who contributed to founding the Engineering Projects Spanish Association. The three of them share a broad vision of the project and abandon the "blue print" planning model. They also see the project as a transformational tool that requires a different planning style to the one which prevailed in the 70s - both in public and private domains. They were pioneers in structuring Knowledge / Action in a different way, both in academic institutions where disciples helped to bring about change- and with direct action via projects.
Resumo:
This study analyzes the effect of organizational characteristics on the innovation project performance. This research applies fuzzy set Qualitative Comparative Analysis (fsQCA) to a large sample of Spanish firms appearing in the Community Innovation survey (CIS). The results show that the combination of organizational innovation, firm size and cooperationwith national and, especially, international firms is a sufficient condition for the success of innovation projects within the organization. Evidence also suggests that variables such as the investment on R&D peremployee or the seniority of the company do not affect the success of innovation projects. These findings help complement some results in previous studies on innovation projects performance.
Resumo:
La presente tesis doctoral se enmarca dentro del concepto de la sistematización del conocimiento en arquitectura, más concretamente en el campo de las construcciones arquitectónicas y la toma de decisiones en la fase de proyecto de envolventes arquitectónicas multicapa. Por tanto, el objetivo principal es el establecimiento de las bases para una toma de decisiones informadas durante el proyecto de una envolvente multicapa con el fin de colaborar en su optimización. Del mismo modo que la historia de la arquitectura está relacionada con la historia de la innovación en construcción, la construcción está sujeta a cambios como respuesta a los fracasos anteriores. En base a esto, se identifica la toma de decisiones en la fase de proyecto como el estadio inicial para establecer un punto estratégico de reflexión y de control sobre los procesos constructivos. La presente investigación, conceptualmente, define los parámetros intervinientes en el proyecto de envolventes arquitectónicas multicapa a partir de una clasificación y sistematización de todos los componentes (elementos, unidades y sistemas constructivos) utilizados en las fachadas multicapa. Dicha sistematización se materializa en una hoja matriz de datos en la que, dentro de una organización a modo de árbol, se puede acceder a la consulta de cada componente y de su caracterización. Dicha matriz permite la incorporación futura de cualquier componente o sistema nuevo que aparezca en el mercado, relacionándolo con aquellos con los que comparta ubicación, tipo de material, etc. Con base en esa matriz de datos, se diseña la sistematización de la toma de decisiones en la fase de proyecto de una envolvente arquitectónica, en concreto, en el caso de una fachada. Operativamente, el resultado se presenta como una herramienta que permite al arquitecto o proyectista reflexionar y seleccionar el sistema constructivo más adecuado, al enfrentarse con las distintas decisiones o elecciones posibles. La herramienta se basa en las elecciones iniciales tomadas por el proyectista y se estructura, a continuación y sucesivamente, en distintas aproximaciones, criterios, subcriterios y posibilidades que responden a los distintos avances en la definición del sistema constructivo. Se proponen una serie de fichas operativas de comprobación que informan sobre el estadio de decisión y de definición de proyecto alcanzados en cada caso. Asimismo, el sistema permite la conexión con otros sistemas de revisión de proyectos para fomentar la reflexión sobre la normalización de los riesgos asociados tanto al proprio sistema como a su proceso constructivo y comportamiento futuros. La herramienta proporciona un sistema de ayuda para ser utilizado en el proceso de toma de decisiones en la fase de diseño de una fachada multicapa, minimizando la arbitrariedad y ofreciendo una cualificación previa a la cuantificación que supondrá la elaboración del detalle constructivo y de su medición en las sucesivas fases del proyecto. Al mismo tiempo, la sistematización de dicha toma de decisiones en la fase del proyecto puede constituirse como un sistema de comprobación en las diferentes fases del proceso de decisión proyectual y de definición de la envolvente de un edificio. ABSTRACT The central issue of this doctoral Thesis is founded on the framework of the concept of the systematization of knowledge in architecture, in particular, in respect of the field of building construction and the decision making in the design stage of multilayer building envelope projects. Therefore, the main objective is to establish the bases for knowledgeable decision making during a multilayer building envelope design process, in order to collaborate with its optimization. Just as the history of architecture is connected to the history of innovation in construction, construction itself is subject to changes as a response to previous failures. On this basis, the decisions made during the project design phase are identified as the initial state to establish an strategic point for reflection and control, referred to the constructive processes. Conceptually, this research defines the parameters involving the multilayer building envelope projects, on the basis of a classification and systematization for all the components (elements, constructive units and constructive systems) used in multilayer façades. The mentioned systematization is materialized into a data matrix sheet in which, following a tree‐like organization, the access to every single component and its characterization is possible. The above data matrix allows the future inclusion of any new component or system that may appear in the construction market. That new component or system can be put into a relationship with another, which it shares location, type of material,… with. Based on the data matrix, the systematization of the decision making process for a building envelope design stage is designed, more particularly in the case of a façade. Putting this into practice, it is represented as a tool which allows the architect or the designer, to reflect and to select the appropriate building system when facing the different elections or the different options. The tool is based on the initial elections taken by the designer. Then and successively, it is shaped on the form of different operative steps, criteria, sub‐criteria and possibilities which respond to a different progress in the definition of the building construction system. In order to inform about the stage of the decision and the definition reached by the project in every particular case, a range of operative sheets are proposed. Additionally, the system allows the connection with other reviewing methods for building projects. The aim of this last possibility is to encourage the reflection on standardization of the associated risks to the building system itself and its future performance. The tool provides a helping system to be used during the decision making process for a multilayer façade design. It minimizes the arbitrariness and offers a qualification previous to the quantification that will be done with the development of the construction details and their bill of quantities, that in subsequent project stages will be executed. At the same time, the systematization of the mentioned decision making during the design phase, can be found as a checking system in the different stages of the decision making design process and in the different stages of the building envelope definition.
Resumo:
Esta tesis doctoral trata de investigar cuánto hubo de presencia del cine en el pensamiento de Le Corbusier y Pierre Jeanneret, a la hora de acometer la publicación y maquetación de las páginas dedicadas a la Villa Stein-de Monzie en Garches, en “Le Corbusier et Pierre Jeanneret. Oeuvre Complète 1910-1929”. Qué mecanismos cinematográficos pusieron en juego, cuando montaban las páginas de L´Oeuvre Complète. Más que encontrar elementos cinematográficos utilizados de manera directa; el objetivo de esta tesis es profundizar en los mecanismos, procedimientos, sistemas de generación de ideas a lo largo del proceso de proyecto; en las maneras de percibir y experimentar los espacios, o de observar las formas. El armazón lo compone por lo tanto el análisis del modo en que Le Corbusier representa la villa en L´Oeuvre Complète, sus intenciones y la función pedagógica de este modo de representar; así como sus diferencias con respecto a lo realmente construido. Una realidad elaborada sobre un tablero; maquetando su representación, eligiendo los fragmentos, y componiendo las láminas (cercana a la de un director de cine). La justificación del objeto a estudiar se plantea en el primer capítulo: L´Oeuvre Complète (1937), la reedición en francés, alemán e inglés de la primera edición en alemán, Ihr Gesamtes Werk (1929).Se establecen las intenciones de Le Corbusier de que se convierta en un modelo de Tratado de Arquitectura Moderna, eminentemente visual. Se estudian los mecanismos formales y geométricos de composición del libro, y el modo en el que L´Oeuvre Complète debe ser leída. El desarrollo de los siguientes capítulos (del 2 al 9) recoge el método principal de investigación de esta tesis, basado en una lectura longitudinal, crítica y sistemática, a partir de la observación atenta de la representación de la villa Stein-de Monzie en Garches, en las páginas nº 140 a 149 de L´Oeuvre Complète. Se efectúa mediante un desarrollo lineal y secuenciado, como si de un guión cinematográfico se tratara. Cada capítulo describe y analiza cada uno de los diferentes fragmentos, permitiendo al mismo tiempo enlazar temas de interés que ayudan a comprender aspectos de la villa de Garches, de su concepción en la intensa labor de proyecto (con numerosas variantes y propuestas), e incluso de su aparición en el cine. Además, la tesis arroja luz sobre unos documentos bastante desconocidos: las láminas de la colección del Museo Cooper-Hewitt de nueva York, para la villa de Garches. El análisis de la presentación de la villa de Garches en L´Oeuvre Complète, constata que para Le Corbusier, el fragmento, per se, ha de ser perfecto, produciendo la máxima emoción. Como un prestidigitador, Le Corbusier los manipula, o le niega información al espectador mediante el uso de la elipsis en el relato. Los textos concatenan las imágenes, soportan el hilo de la narración. Los bocetos quieren siempre seducir al espectador: son dibujos que rezuman vitalidad, con una técnica muy cercana a la ligne claire del cómic. Las plantas son un laboratorio para demostrar su jerarquía y su libertad de composición; eliminando elementos, distorsionando la valoración de líneas y apareciendo algún elemento no ejecutado. Los alzados, esquemáticos y abstractos, demuestran el control de la geometría para garantizar la emoción. Las fotografías son controladas en su fase de captura (elección del punto de vista, cuidada puesta en escena de los objetos, composición con la luz, uso de las sombras para la aparición del fuera de campo); pero también en la fase de postproducción y edición, donde son cortadas, alisadas superficies, borrando o dibujando elementos sobre ellas. El montaje compone asimismo una representación dinámica, fragmentada y múltiple de la villa. Como sucede en el cine, los fragmentos sólo encuentran su razón de ser una vez son re-creados y montados en la cabeza del espectador. La falta de raccord es un mecanismo buscado por Le Corbusier, trasladando a la representación una de las primordiales características de la villa de Garches: su permanente dualidad simultánea. Todos estos mecanismos son desplegados por Le Corbusier, para ofrecer una versión idealizada de la villa, que recoja todas las virtudes de los distintos proyectos e incorpore el factor tiempo. ABSTRACT This doctoral thesis tries to investigate how much the cinema affected Le Corbusier and Pierre Jeanneret´s thoughts, at the moment of undertaking the publication and layout of the pages dedicated to the villa Stein-de Monzie in Garches, in the book “Le Corbusier et Pierre Jeanneret. Oeuvre Complète 1910-1929”. Which cinematographic mechanisms they brought into play, when they were mounting those pages. Instead of finding cinematographic elements, used directly; the aim of this thesis is to go deeply into the mechanisms, methods, systems of generation of ideas along the project process; into the ways of seeing and feeling the spaces, or of watching the forms. The body is composed therefore by the analysis of the way in which Le Corbusier represents the villa in L'Oeuvre Complète, his intentions and the pedagogic function of that way of representation; as well as its differences with the real built villa. One reality elaborated on a board; laying out its representation, choosing the fragments, and composing the sheets (near to the work of a director of cinema). The justification of the object to studying appears in the first chapter: L'Oeuvre Complète (1937), the reissue in French, German and English of the first edition in German, Ihr Gesamtes Werk (1929). This chapter shows the intentions of Le Corbusier of turning the book into a model of modern architecture, highly visual. The formal and geometric mechanisms of composition of the book are studied, and the way in which L'Oeuvre Complète must be read. The development of the following chapters (from 2 to 9) gathers the principal method of investigation of this thesis, based on a longitudinal, critical and systematic reading; from the watching of the representation of the villa Stein-de Monzie in Garches, in the pages nr. 140 to 149 of L'Oeuvre Complète. It is carried out by a linear and sequenced development, as a cinematographic script. Every chapter describes and analyzes each of the different fragments, allowing at the same time to connect interesting issues that help to understand aspects of the villa in Garches, of its conception in the intense project process (with numerous variants and designs), and even of its appearance in films. Also, the thesis throws light on some unknown documents: the sheets of the collection of the Museum Cooper-Hewitt in New York, for the villa in Garches. The analysis of the presentation of the villa in Garches in L'Oeuvre Complète, proves that for Le Corbusier, the fragment, itself, has to be perfect, getting the maximum emotion. As a prestidigitator, Le Corbusier manipulates them, or denies information to the spectator by means of the use of the ellipsis in the story. The texts concatenate the images, support the thread of the story. The sketches always attempt to seduce the spectator: they are drawings that leak vitality, with lines very near to the ligne claire of the cómic. The plans are a laboratory to demonstrate their hierarchy and their freedom of composition; deleting elements, distorting the thickness of lines and showing some not executed elements. The elevations, schematic and abstract, shows the control of the geometry to guarantee the emotion in architecture. The pictures are controlled in their instant of capture (choice of the point of view, elegant mise-en-scène of the objects, composition with light, use of the shadows for the appearance of out of vision); but also in the postproduction and edition time, when surfaces are cut, smoothing, erasing or drawing elements in them. The montage composes in the same way a dynamic, fragmented and multiple representation of the villa. As in the films, the fragments only find their raison d'être once they have been re-created and mounted into the mind of the viewer. The continuity error is a mechanism allowed by Le Corbusier, transfering to the representation in the book one of the basic characteristics of the villa in Garches: its constant simultaneous duality. All these methods are displayed by Le Corbusier, to offer an idealized version of the villa, which gathers all the virtues of the different projects, and incorporates the time factor.
Resumo:
GOLD is a comprehensive resource for accessing information related to completed and ongoing genome projects world-wide. The database currently provides information on 350 genome projects, of which 48 have been completely sequenced and their analysis published. GOLD was created in 1997 and since April 2000 it has been licensed to Integrated Genomics. The database is freely available through the URL: http://igweb.integratedgenomics.com/GOLD/.
Resumo:
Crop gene pools have adapted to and sustained the demands of agricultural systems for thousands of years. Yet, very little is known about their content, distribution, architecture, or circuitry. The presumably shallow elite gene pools often continue to yield genetic gains while the exotic pools remain mostly untapped, uncharacterized, and underutilized. The concept and content of a crop’s gene pools are being changed by advancements in plant science and technology. In the first generation of plant genomics, DNA markers have refined some perceptions of genetic variation by providing a glimpse of a primary source, DNA polymorphism. The markers have provided new and more powerful ways of assessing genetic relationships, diversity, and merit by infusing genetic information for the first time in many scenarios or in a more comprehensive manner for others. As a result, crop gene pools may be supplemented through more rapid and directed methods from a greater variety of sources. Previously limited by the barriers of sexual reproduction, the native gene pools will soon be complemented by another gene pool (transgenes) and perhaps by other native exotic gene pools through comparative analyses of plants’ biological repertoire. Plant genomics will be an important force of change for crop improvement. The plant science community and crop gene pools may be united and enriched as never before. Also, the genomes and gene pools, the products of evolution and crop domestication, will be reduced and subjected to the vagaries and potential divisiveness of intellectual property considerations. Let the gains begin.
Resumo:
Early project termination is one of the most difficult decisions to be made by Research and Development managers. While there is the risk of terminating good projects, there is also the opposite risk of not terminating bad projects and overspend resources in unproductive research. Criteria used for identifying these projects are common subject of research in Business Administration. In addition, companies might take important lessons from its interrupted projects that could improve their overall portfolio technical and commercial success. Finally, the set and weight of criteria, as well as the procedures companies use for achieve learning from cancelled projects may vary depending on the project type. This research intends to contribute to the understanding of policies applied to projects that were once considered attractive, but by some reason is not appreciated anymore. The research addressed the question: How companies deal with projects that become unattractive? More specifically, this research tried to answer the following questions: (1) Are projects killed or (otherwise) they die naturally by lack of resources? (2) What criteria are used to terminate projects during development? (3) How companies learn from the terminated projects to improve the overall portfolio performance? (4) Are the criteria and learning procedures different for different types of projects? In order to answer these questions, we performed a multiple case study with four companies that are reference in business administration and innovation: (1) Oxiteno, considered the base case, (2) Natura, the literal replication, (3) Mahle and (4) AES, the theoretical replications. The case studies were performed using a semi-structured protocol for interviews, which were recorded and analyzed for comparison. We found that the criteria companies use for selecting projects for termination are very similar to those anticipated by the literature, except for a criteria related to compliance. We have evidences to confirm that the set of criteria is not altered when dealing with different project types, however the weight they are applied indeed varies. We also found that learning with cancelled projects is yet very incipient, with very few structured formal procedures being described for capturing learning with early-terminated projects. However, we could observe that these procedures are more common when dealing with projects labeled as innovative, risky, big and costly, while those smaller and cheaper derivative projects aren\'t subject of a complete investigation on the learning they brought to the company. For these, the most common learning route is the informal, where the project team learns and passes the knowledge though interpersonal information exchange. We explain that as a matter of cost versus benefit of spending time to deeply investigate projects with little potential to bring new knowledge to the project team and the organization
Resumo:
Utah lacks a NEPA-equivalent environmental law for state funded projects. UDOT policies provide guidance on complying with NEPA but not on environmental reviews of state funded transportation projects. These projects are either not evaluated for impacts or are evaluated without a formal process, resulting in inconsistent and inadequate consideration of resources and project alternatives, with limited public involvement. This capstone provides a standard policy for UDOT. The policy incorporates elements from other state DOT polices and is based on federal NEPA, CEQ regulations, FHWA technical guidance, and existing UDOT procedures. Implementation will ensure consideration of project impacts to resources, analysis of project alternatives, encourage meaningful public involvement, and improve interagency coordination.
Resumo:
Renewable energy such as biomass has given markets, including dairy farms, an effective approach to reducing the costs of sustaining a profitable business. Anaerobic digestion systems offer dairy farms a very effective way to reduce manure odor, comply with soil and water pollution regulations, manufacture compost for general market sales, produce irrigation capacity and generate on-site electricity as well as the ability to sell excess electricity back to the local utilities. This project defines anaerobic digestion technologies and practices, analyzes case studies and presents a step-by-step anaerobic digestion project startup checklist. The result is an anaerobic digestion project working guide that acts as a tool to aid dairy farmers in their own potential anaerobic digestion project.
Resumo:
An extensive and growing road system in the United States bisects vital wildlife habitat and is causing deleterious ecological effects on many wildlife species. The primary impacts include collisions between wildlife and vehicles, altered movement patterns within habitat, and/or the complete blockage of movements between vital habitats. The increasing size of the road network and number of vehicles will only intensify the problem unless proactive wildlife mitigation measures are developed to minimize these adverse effects. Therefore, this capstone project examines the role of citizen advocacy for promoting wildlife protection in the planning and development of wildlife-sensitive transportation projects in the United States. Based upon a data analysis of 21 questionnaires from qualified participants, it was determined that citizen participation is an important component associated with the development of wildlife-sensitive transportation projects. However, four major barriers to facilitating effective citizen participation processes were identified. 1) A lack of awareness. Citizens are only minimally aware of wildlife and transportation issues, including: a) the ecological impacts of roads, b) the solutions available to mitigate these impacts, and c) the opportunities to advocate for the protection of wildlife during transportation planning processes; 2) Public apathy or a lack of citizen interest in wildlife and transportation issues; 3) Ineffective citizen participation techniques and processes; and 4) Poor communication with citizens. Four recommendations were provided to assist in overcoming these barriers and to help define a better role for citizen advocacy in protecting wildlife from the growing road network.
Resumo:
The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. The research identified the logarithmic form of construction speed as the most appropriate response variable. GFA has greater influence than cost on project duration but both factors are necessary to achieve a forecast model with the highest accuracy. We developed an analysis to verify the stability of forecasted values and showed how a model with high values of fit and accuracy may display an anomalous behavior in the forecasted values. The sensitivity of the proposed forecast model was also analyzed versus the variability of construction costs.
Resumo:
It has been widely documented that when Building Information Modelling (BIM) is used, there is a shift in effort to the design phase. Little investigation into the impact of this shift in effort has been done and how it impacts on costs. It can be difficult to justify the increased expenditure on BIM in a market that is heavily driven by costs. There are currently studies attempting to quantify the return on investment (ROI) for BIM for which these returns can be seen to balance out the shift in efforts and costs to the design phase. The studies however quantify the ROI based on the individual stakeholder’s investment without consideration for the impact that the use of BIM from their project partners may have on their own profitability. In this study, a questionnaire investigated opinions and experience of construction professionals, representing clients, consultants, designers and contractors, to determine fluctuations in costs by their magnitude and when they occur. These factors were examined more closely by interviewing senior members representing each of the stakeholder categories and comparing their experience in using BIM within environments where their project partners were also using BIM and when they were not. This determined the differences in how the use and the investment in BIM impacts on others and how costs are redistributed. This redistribution is not just through time but also between stakeholders and categories of costs. Some of these cost fluctuations and how the cost of BIM is currently financed are also highlighted in several case studies. The results show that the current distribution of costs set for traditional 2D delivery is hindering the potential success of BIM. There is also evidence that stakeholders who don’t use BIM may benefit financially from the BIM use of others and that collaborative BIM is significantly different to the use of ‘lonely’ BIM in terms of benefits and profitability.